You are on page 1of 76

13th Conference

Annual
13th
13th
Annual
Annual
AGENDA POINTS Conference
Conference

01 05

02 06

03 07

04 08
MANPOWER / FLIGHTS 13th
BREAK DOWN Annual
Conference
2007-Sep 2018
3500 Sep,2018

3000

2500

2000
Total Manpower
1500 Total Flights

1000

500

0
13th
MANPOWER Annual
Conference

MANAGEMENT
= 16

TERMINAL
OPERATION
= 167

FLIGHT
OPERATIONS
= 06

RAMP
OPERATION
= 219

CARGO
OPERATION
= 122
TOTAL
QUALITY &
SECURITY Protocol &
39
579 = Dedicated Staff
10
13th
MANPOWER SUMMARY Annual
Conference

Approved Approved *Total


* Current
Manpower Manpower Manpower
Vacant Slots
Oct 2017 Oct 2018 Increased

543 608 29 65
13th
WINTER SCHEDULE 2018-2019 Annual
Conference

Days 231/ 233/ 770/ 632/ 614/ 345/ 347/ 500/ 502/ 504/ 540/ Total
232 234 771 633 615 346 348 501 503 505 541

02:25 18:15 01:40 08:00 09:45 09:00 15:30 20:30 12:15 09


Monday - -
03:40 20:35 03:05 09:20 11:00 10:00 16:30 21:30 13:15

02:45 18:15 05:50 01:40 08:00


-
12:35 09:00 15:30 20:30
-
09
Tuesday 03:40 20:35 06:50 03:05 09:20 15:15 10:00 16:30 21:30

02:45 18:15 01:40 08:00 09:45 09:00 15:30 20:30 12:15 09


Wednesday - -
03:40 20:35 03:05 09:20 11:00 10:00 16:30 21:30 13:15

02:45 18:15 05:50 01:40 08:00 12:35 09:00 15:30 20:30 09


Thursday - -
03:40 20:35 06:50 03:05 09:20 15:15 10:00 16:30 21:30

02:45 18:15 01:40 08:00 12:45 09:00 15:30 20:30 08


Friday - - -
03:40 20:35 03:05 09:20 14:00 10:00 16:30 21:30

02:45 18:15 05:50 01:40 08:00 12:35 09:00 15:30 20:30 12:15 10
Saturday -
03:40 20:35 06:50 03:05 09:20 15:15 10:00 16:30 21:30 13:15

02:45 18:15 01:40 08:00 09:45 09:00 15:30 20:30 12:15


Sunday - - 09
03:40 20:35 03:05 09:20 11:00 10:00 16:30 21:30 13:15

Total 07 07 03 07 07 04 03 07 07 07 04 63 flts
13th
COMPARATIVE ANALYSIS OF WIDE AND Annual GM
NARROW BODY AIRCRAFTS Conference

B-777 / B787/A359/A-330 B-777/A-330

2016-2017 = 61.96% INCREASE 2016-2017 = 08.79% INCREASE


2017-2018 = 72.40% 10.44% 2017-2018 = 12.59% 03.8%
A-321 A-321

2016-2017 = 74.18% INCREASE


2016-2017 = 09.85% DECREASE 2017-2018 = 75.24% 01.06%
2017-2018 = 06.83% 3.02%

A-320 A-320

2016-2017 = 28.18% DECREASE 2016-2017 = 17.03% DECREASE


2017-2018 = 20.77% 07.41% 2017-2018 = 12.18% 04.85%
Continue……
COMPARATIVE ANALYSIS OF WIDE AND 13th
Annual GM
NARROW BODY AIRCRAFTS
Conference

B787/A-330 A-330

2016-2017 = 86.41% DECREASE 2016-2017 = 13.42% INCREASE


2017-2018 = 88.13% 01.72% 2017-2018 = 20.82% 07.04%
A-321 B-738

2016-2017 = 77.26% DECREASE


2016-2017 = 06.17% INCREASE 2017-2018 = 56.71% 27.56%
2017-2018 = 07.05% 01.33%
A-320 B-739

2016-2017 = 07.40% 2016-2017 = 09.31% INCREASE


DECREASE
2017-2018 = 04.37% 2017-2018 = 22.46% 13.15%
03.03%
13th
OPS STATISTICS Annual
OCT 2017 TO SEP 2018 Conference

FLIGHT TIME
OTP
HANDLED SAVED
99.86% 732 4792

731 7595

160 1066

364 3150

1196 5627
Last 11 Years
17226
23 Flts
Delayed
OTP 99.86 %

Last Year
2587
OTP 99.84 %

Domestic
Flts
1196
OTP 100 %
13th
GROOM / TRAIN MIDDLE MANAGEMENT Annual GM
Conference

1. Select the right person for the job.

2. Should attend meetings with sister


organizations i.e. CAA, ASF, AOC,ANF and
customs and also attend to the relevant points.

3. Should attend / coordinate with customer


Airlines and get the correct updates on staff
performance.

4. Should find out the training requirements


keeping in view the Airline requirements and
coordinate with training officer to conduct the
training.
13th
GROOM / TRAIN MIDDLE MANAGEMENT Annual GM
Conference

5. Should participate to prepare and conduct the


Audits / Inspections.

6. Should be involved in different activities like


BOIs, Pre/Post Flight activates.

7. Should gain Knowledge of other domain’s


operations i.e. Cargo, Ramp, Admin, Traffic etc.

8. Get involved as Event Manager in case of any


station activity.
13th
TRAININGS 2018 Annual
Conference
May,2018
BASIC
DGR CAT 8,9 LOADING /
PASSANGER
& 10 OFF-LOADING
HANDLING

Aug,2018

WEIGHT &
BALANCE
(B-787)

Sep,2018

US Travel
Documents
Check

Sep,2018

W&B
LM & DG Human
B-787, A-330
PROCEDURES CAT-10 Factor
& B-737
13th
TRAININGS 2018 Annual
Conference
Oct,2018

CM
PVC PVC-TTT Supervisory
ALTEA CM

Oct,2018

AIRSIDE BAGGAGE FIRE


SAFETY HANDLING PREVENTION

Nov,2018

EY SSCI EY SSCI
ERP
Basic Advance

Dec,2018

ALTEA FM
13th
UP COMING TRAININGS 2019 Annual
Conference

Feb,2019

HAQIBA
Online
13th
UP COMING TRAININGS 2019 Annual
Conference

RAS Trainer
Jan,2019
BASIC DGR CAT LOADING /
W&B 9,8 & 10 OFF-LOADING

BASIC
SECURITY
AWARENESS

Jan,2019 Local Trainer

HUMAN RAMP LOCAL


FACTOR SAFETY ERP

COMPANY
POLICY &
PROCEDURES
13th
SUMMARY OF EQUIPMENT Annual
(POWERED EQUIPMENT) Conference

Equipment Life Equipment


Eqpt over 40 Years 02
Eqpt over 25Years 02
Eqpt over 20 Years 02
Eqpt over 15 Years 04
Eqpt over 10 Years 21
Eqpt less then 10 Years 09
Eqpt New 06

Total 46
13th
POWERED EQUIPMENT Annual
Conference

Equipment Total

A/C Tow
Tractor (Tug) 02

PCL/MDL 06

Pax Boarding
Steps 03

Conveyor Belts 04

Continue….
13th
POWERED EQUIPMENT Annual
Conference

Equipment Total

01
GPU

AC VAN 02

Air Start Unit 01

Ambulifter 01

King long Bus 03

Continue….
13th
POWERED EQUIPMENT Annual
Conference

Equipment Total

Water Cart 01

Flush Cart 01

Baggage Tractors
09

Cobus 3000 02

Continue….
13th
POWERED EQUIPMENT Annual
Conference

Equipment Total

VIP Car 01
Stavic

Foton Truck 01

Suzuki
Hi-Roof Van 05

Suzuki
Pick-up 02

Fork lifter 01
13th
*NON POWERED EQUIPMENT Annual
Conference

Equipment
Total Equipment Life
Name

Over 10 Years = 54
Container Dollies 63
New = 09

Pallet Dollies 16 Over 10 Years = 16

Over 10 Years = 08
Baggage Trolleys 25 Over 01 Years = 12
New = 05
13th
CRITICAL CURRENT SHORTAGE OF
Annual
EQUIPMENT Conference

 PAX STEP 02
 CONVEYOR BELT 01
 ASU(CAPACITY 400PPM) 01
 BAGGAGE TRACTOR 02
 PALLET DOLLIES 20
 CONTAINER DOLLIES 20
 BAGGAGE TROLLIES 25
 FORK LIFTER 10 TON 01
 RAVI PICK UP 01
13th
EQUIPMENT NOT CLEARED BY Annual
CAA AT IIAP Conference

S. No NAME RAS No QTY REMARKS

Not Cleared
1 BAGGAGE TRACTOR 042 - 044 02
By CAA
13th
HIRING OUT Annual
OCT 2017 --- SEP 2018 Conference

Equipment Name Total Trip / Hrs


Sr# Equipment Oct17-April18 May-Sep18
1 A/C Tow Tractor 67 trips 09 trips
2 Ground Power Unit 7 hrs Nil
3 Air Start Unit 56 starts 15 starts
4 AC Van Nil 01 hrs
5 Passenger Bus 806 trips 41 trips
6 Passenger Step 06 hrs 04 hrs
7 Ambo lifter 409 trips 20 trips
8 PCL 124 hrs 17 hrs
9 Conveyor Belt 155 hrs 01 hrs
10 Baggage Trt 46 hrs 04 hrs
11 Water Cart 239 trips 07 trips
12 Flush Cart 80 trips 21 trips
13 Tow Bar 21 trips 32
14 Container Dollies 92 hrs 290 hrs
15 Pallet Dollies Nil 02 hrs
16 Wheel Chocks Nil 08 Svc
17 A/C Tech Nil 06 flts
18 Baggage Trollies Nil 28 hrs
13th
HIRING IN Annual
OCT 2017 --- SEP 2018 Conference

Equipment Name Total Trip / Hrs


S# Equipment Name Oct 17-April18 May-Sep18
1 A/c Towing Tractor 100 pushback 27 pushback
2 Air Start Unit 09 starts 14 starts
3 Air-conditioning van 02 hrs Nil
4 Ground Power Unit 100 hrs 07 hrs
5 PCL 01 hrs 05 hrs
6 Passenger Bus 100 trips 03 trips
7 Water Cart 10 trips Nil
8 Flush Cart 116 trips 01 trip
9 Passenger Step 76 hrs 02 hrs
10 Ambu lifter 357 trips 01 trip
11 Conveyor Belt 07 hrs 14 hrs
12 Baggage Tractor 4 hrs Nil
13 Pallet Dollies 174 hrs 205 hrs
14 Container Dollies 64 hrs 35 hrs
15 Tow Bar 12 Svc 16 Svc
16 Fork Lifter 16 hrs 03 hrs
EXPORT CARGO HANDLED IN 13th
Annual
TONNAGE (Year Wise) Conference

2018
Airline 2017
(Till Sep)

4378 6240

Nil 1343

618 815

511 844

Total 5507 9242


IMPORT CARGO HANDLED IN 13th
Annual
TONNAGE (Year Wise) Conference

2018
Airline 2017
(Till Sep)

1930 2340

Nil 197

416 460

132 175

Total 2478 3172


DOMESTIC CARGO HANDLED IN 13th
Annual
TONNAGE (2018) Conference

Airline OUT IN

1185 1168
*AIRLINE / MONTH VISE DETAIL OF 13th
TOTAL CARGO UPLIFTED IN TONNAGE Annual
2018 (JAN-SEP) Conference

Month Total

38 43 46 73 200

401 35 45 54 535

404 36 39 62 541

475 40 34 143 692

515 77 35 149 776

546 141 59 132 878

588 54 70 193 905

720 79 72 212 1083

719 114 111 167 1111


AUDITS CONDUCTED DURING 13th
LAST 11 MONTHS (Jan – Nov 2018) Annual
(ALL DEPARTMENTS) Conference

Audit Audit
Department
Title Date
TERMINAL / QC Audit 14th & 15th May
RAMP For GHA 2018

TERMINAL / Security
11th June 2018
CARGO Audit

TERMINAL / Quality 23rd – 24th July


RAMP Audit 2018

Quality
RAMP Safety 13th July 2018
Engineering

TERMINAL / Quality 30th July – 02nd


RAMP & Safety August 2018
AUDITS CONDUCTED DURING LAST 11 13th
MONTHS (Jan – Nov 2018) Annual
(ALL DEPARTMENTS) Conference

Audit Audit
Department
Title Date

CARGO Security 03rd May 2018


Audit

CARGO PCAA 05th May 2018


Audit

RA3 22nd – 23rd


CARGO
Audit June 2018

CARGO PNRA 01st Aug 2018


Audit

ALL H.O 13th – 15th


DEPARTMENTS Audit Aug 2018

Terminal / Ramp Ground 14th – 15th


& Cargo QA OPS Nov 2018
ACHIEVEMENTS
13th
ACHIEVEMENTS Annual
Conference

SMOOTH SHIFTING TO IIAP WITH RUNNING


OPREATION

SMOOTH CONDUCT OF FLIGHT OPERATION


AT IIAP ON SAME DAY ie ER-501 FLIGHT
DEPARTED from BBIAP AT 1000 HRS AND
WY-347 FLIGHT RECEIVED AT IIAP 1300HRS

SUCCESSFUL AIRLINES AUDITS CONDUCTED


AFTER SHIFTING AT IIAP

20 STATIC STANDS MANUFACTURED FOR ULDs


13th
ACHIEVEMENTS Annual
Conference

CARGO SCANING MACHINE FEEDING /


RECEIVING ROLLER STANDS MANUFACTURED
AND ALSO MANUFACTURED FOR LHE STATION

PREPARATION AND PRACTICAL


IMPLEMENTATION OF QTY- 40 SOPs KEEPING
IN VIEW THE PRESENT SCENARIO OF IIAP BY
RAS RAMP

REQUIRED TRAINING FOR STAFF CONDUCTED


AT IIAP AFTER SHIFITING
13th
ACHIEVEMENTS Annual
Conference

RA 3 CERTIFICATION ACHIEVED

EU CERTIFICATION

PNRA LICENSE ACQUIRED

DOSIMETERS FOR ALL SCANEERS RECIVED


FRIST TIME

START FRIST TIME DOMESTIC &


INTERNATIONAL CARGO
13th
Annual
WORKSHOP Conference

Pax Step RAS-784

Safety railing panel Modification carried out

> 02 New Panel design, made & install


> 02 safety locks, 02 side catcher install
> 02 rubber bumper for safety install
13th
Annual
WORKSHOP Conference

GPU RAS-022
Rear engine giving heavy smoke & high
oil consumption. Voltage fluctuation on
load.
Alteration carried out of kabli engine
and replaced.
Engine speed control replaced. Fuel
injection pump overhauled and fitted.

TUG RAS-639
Oil leaks from transmission assembly
coupling seal.
Transmission assembly removed. Oil
seal replaced after modification.
Transmission assembly and all
accessories fitted back.
13th
Annual
Conference
13th
RAMP Annual
Conference

CONVEYOR BELT
PCL RAS # 010
RAS # 340
• MODEL =WGSJT7 Description
Part Quantity
Reference book Reqstd
no.
• Electric schematic diagram =178638
Conveyor
• Item no = 01 code A1 belt maintenance
Contactor 106771 1
manual page no-
• Foot pedal = Quantity 01 65 Item no-8
• Part # = 103533 Contactor 106772
Page no-65 Item
1
no-9
Push
Page no-67 Item
button 10692 2
no-27
switch
13th
RAMP Annual
Conference

FLUSH CART
RAS # 034
Description Part no. Reference book Quantity Requested
Friction ring 2 WS306.4-4 Flush cart maintenance manual 02
page no-19 item no-21
Friction ring 4 WS306.4-6 Page no-19 item no-22 02
Block 1 WS306.4-8 PAGE NO -19 item no-23 02
Outer shell Weldment WS307.4-3 PAGE NO-19 ITEM NO-17 01
Inner sleeve Weldment WS307.4-4 PAGE NO-19 item no-24 01
Friction ring 3 WS 306.4-5 PAGE NO-21 item no-28 02
O ring 130x3.1 102002 Page no-21 ITEM NO-29 02
FRICTION RING 5 WS306.4-902 PAGE NO-21 ITEM N0-31 02
BLOCK WSB 3013.2-4 PAGE NO-21 ITEM NO-32 01
LEAF CHAIN 228082 PAGE NO-27 ITEM NO-8 04
WAIST PIPE 13 FEETS 158062 PAGE NO-11 ITEM NO-15 02
13th
RAMP Annual
Conference

TUG RAS # 639 AC VAN RAS # 607


• ENGINE # 00729702. • AC Van TLD.
• CHASSIS # GT-110-325. • RAS NO- 607
• Part required engine coolant • ENGINE NO-1830279 C1(DETRIOT DIESEL).
temperature gauge. • CHASSIS NO- 230091.
• part # 310504 quantity =01 • Part required POTENTIOMETER ASSEMBLY.
• part required oil
• part no-1031 66 .
temperature transmitter
• Reference no-OPERATION MAINTENANCE &
• Part # 310514 quantity =01 PARTS MANUAL - Illustrated Parts list
• Parking brake switch quantity =01 PM1035786 - CONTROL BOX
ASSEMBLY.
• Part # 12000237
• REFERENCE :-OPERATION MAINTENANCE & PARTS MANUAL
Page No-17, Item No-22
13th
RAMP Annual
Conference

Ambulifter
RAS # 240
• Rear Platform Lift Operating Mechanism i.e. in motor, Main Jacks cable & pillars.
• Both of Cabin (Leakage problem)
• Ground stabilizers (faults develop occasionally)
• Pneumatic system where faults occur several times and have to get repaired from local market
• Clutch Master cylinder
• Clutch Booster Assembly
• Clutch Release Bearing
• Pressure Plate
• Air Dryer Valve Assembly
( NOTE)- AMBULIFTER WILL BE RE-FURBISHED BY HO.
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

TERMINAL

CUPPS yet not provided

Insufficient no of Check-In counter. Only Zone 4


is available for International Flights
(Max 16 Counters Available Only)
BHS unable to take baggage load during heavy
activity

BRS not installed thus, causing baggage


reconciling issues

Only 01 belt available for International Flights at


Baggage Segregation Area
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

TERMINAL

No proper canteen facility available for staff

Transit Grill Area not allocated yet

Aviation Building Construction works not


completed yet
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

TERMINAL

No or Poor Mobile Phone signals inside the


Airport

Poor Air Conditioning in Offices

Due less number of Lifts, Elevators, Escalators &


Travellators Passengers Suffer a lot PROBLEMS

No backup of Check-In Equipment available at


counters
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

TERMINAL

Insufficient Number of Staff to Operate Aero


Bridges which Effect Slow Disembarkation of
Passengers Causing Inconvenience to
Passengers and Loss of Time for Airlines

There are many counters of Immigration


Available but Shortage of Manpower and lack
of experience Causing Inconvenience to
Arriving and Departing Passengers who have to
wait for Long Time
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

RAMP

No proper Space for Workshop

No proper Space for TGS / GSE

Recovery of U/S Equipment / Vehicle takes


long time due to Markets not available near
IIAP
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

CARGO

Non-availability of Scanning
room in Domestic Shed
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

PROBLEMS DUE DISTANT


LOCATION

Staff Can not be relived for short leave of 03


to 04 hrs for their urgent family needs

Most of the staff living with


Families / parents can not attend to them in
emergency / sickness etc

The available eateries are either too expensive


or not up to the standard as available at BBIA

The staff can not be made available for


short duration to cover up the operational
gaps as at BBIAP
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

PROBLEMS DUE DISTANT


LOCATION
Quite a number of staff were having a soft
second job to cover up the cast of living.
The time spent (about 3 hrs) on traveling
does not allow the staff to do that.
Accordingly these staff and the one who
were supporting their parents for short
duration are not fully satisfied.

Some of the staff remain engaged to


resolve their personal problems at home
during the day and therefore find it difficult
to perform the assigned duty at night

The staff have to walk quite a distance


during the duty and therefore the work
becomes too exhaustive. Accordingly, they
want to look for the job in Rawalpindi /
Islamabad Areas.
13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

PROBLEMS DUE DISTANT


LOCATION

Non Availability of PUBLIC TRANSPORTS

Proper Medical cover not provided for staff


13th
DISCREPANCY / PROBLEMS Annual
AT IIAP Conference

Weather Problem

Due to open area Staff / Equipment


faces loot of problems like dense fog,
heavy thunder storm, gusty wind &
High Temperature
THE OFFICES HIRED OUT TO THE AIRLINES AT IIAP 13th
Annual
(PER MONTH)
Conference

98750 28800 45400 26800 36000

Remarks :-
The Rental agreements with the client airlines
have been finalized and are now being submitted directly to
HO RAS w.e.f Oct, 2018.
13th
*HIRING IN / OUT RAS ISB Annual
(OCT 17 TO SEP 18) Conference

Hiring Out Hiring In Difference


S# Month
Rs. Rs. Rs.
1 Oct-17 3,121,481 1,191,593 1,929,888
2 Nov-17 2,753,574 447,754 2,305,820
3 Dec-17 861,375 262,302 599,073
4 Jan-18 1,606,850 496,058 1,110,792
5 Feb-18 625,875 324,367 301,508
6 Mar-18 3,366,000 227,053 3,138,947
7 Apr-18 4,486,000 136,226 4,349,774
8 May-18 891,136 76,166 814,970
9 Jun-18 286,802 140,641 146,161
10 Jul-18 487,000 11,631 475,369
11 Aug-18 357,404 248,136 109,268
12 Sep-18 236642 198051 38591
G. Total 19,080,139 3,929,978 15,150,161
SCANNING MACHINES 13th
Annual
(OCT 17 TO SEP 18)
Conference

No of Flights SINGLE VIEW DUAL VIEW


680 4,298,795 12,472,608

674 164,404 153,378

148 1,518,680 954,748

337 1,023,930 184,420

1115 412,830 2,892,102

Rs. 23,663,065
EXPENDITURES
PETTY CASH ANALYSIS FOR THE YEARS 13th
Annual
2015 TO 2018 Conference

RAMP / TERMINAL & CARGO FUNDS RECEIPT RAMP / TERMINAL & CARGO EXPENDITURES

TERMINAL TERMINAL
YEAR RAMP TOTAL RAMP TOTAL DIFFERENCE
/ CARGO / CARGO

2015 5,850,000 5,003,097 10,853,097 5,919,451 5,140,839 11,060,290 (207,193)

2016 6,000,000 4,260,000 10,260,000 6,711,854 3,835,989 10,547,843 (287,843)

2017 5,896,250 7,486,853 13,383,103 6,802,582 7,276,716 14,079,298 (696,195)

2018
(09 4,000,000 4,474,284 8,474,284 3,922,319 4,641,972 8,564,291 -(900,43)
MONTHS)

TOTAL 21,746,250 21,224,234 42,970,484 23,356,206 20,895,516 44,251,722 (1,281,238)


13th
Yearly Increase in Price of Items Annual GM
Conference
From 2015 to Aug 2018

Year Prices of Items

Filters Paint Cleaning material

2015 Rs. 5,17,455/- Rs. 5,22,295/- Rs. 9,02,451/-

2016 Rs. 6,59,347/- Rs. 6,25,050/- Rs. 9,29,652/-

2017 Rs. 7,64,842/- Rs. 7,43,809/- Rs. 10,50,506/-

2018 Rs. 8,58,714/- Rs. 8,85,132/- Rs. 11,12,300/-


Aug,2018 Aug,2018 Aug,2018
Rs. 12,88,071/- Rs. 13,27,698/- Rs. 16,68,450/-
Approx Dec,18 Approx Dec,18 Approx Dec,18
Yearly % age increase 16% 19% 17%

Yearly % age increase in Spare parts, Stationary and General Items 24.96%
REASON OF INCREASES IN PETTY 13th
Annual
EXPENDITURE Conference

Induction of Vehicles and Ramp Equipment


In 2015 = 32
In 2018 = 46
This Increase in Equipments maintenance cost
increased
more than 65%
PETTY
Due to Tax system implementation, venders are EXPENDITURE

confused and they prefer cash payment than cheque


payment

At IIAP workshop has no proper place and workshop


machines are not fully operational. Due to which many
spare parts cannot be repaired in workshop those are
sent to local market and expenditure increased
REASON OF INCREASES IN PETTY 13th
Annual
EXPENDITURE Conference

Operational area is scattered and running of


equipment and utility vehicles increased thus
wear and tear of tyres and overall increased

As the equipment standing in open area PETTY


EXPENDITURE
and due to swear weather condition no
protection of equipment can ensured

Due to increase in electricity prices gas prices


and inflation rate labor work charges / rates
increased i.e (Machinist, welder)
REASON OF INCREASES IN PETTY 13th
Annual
EXPENDITURE Conference

Due to implementation of ERP the initial cost of


item increased as vendor has to incorporate all
type of Taxes i.e Income Tax and GST etc. as
such the cost of items increases.

At IIAP RAS ISB started Cargo operation due to


this maintenance cost also increased
REASON OF INCREASES IN PETTY 13th
Annual
EXPENDITURE Conference

1. Mess (Tea, Sugar, Milk)


2. Cleaning Material
3. Postage & Courier
4. Printing & Stationary
5. Photocopier Rent
6. Entrainment
7. Repair & Maintenance
8. Misc Expenditure
9. Telephone (Mobile Cards / Bills)
10. Course Expenditure (Participant Refreshment)
11. Rent and Allied Charges
12. Expenditure on Eid & Counter Sweets
13. Computer Accessories
14. Drinking Water (Bottles) Expenses
15. Guest Entertainment
16. Expenditure on local function
17. Staff Welfare Function
18. Misc
PAY RAISE / WELFARE
13th
Annual
PAY RAISE Conference

25 % OF GROSS PAY DUE


TO VERY HIGH INFLATION
RATES
SUGGESTION FOR INCREASE 13th
Annual
IN PAY , PERKS & PRIVILEGES Conference

Increase in Basic Pay

Salary maybe increased compatible with


other GHAs & Competitors

GP Fund scheme may be implemented

Gratuity to be given on Gross Salary

Annual Bonus maybe given like other


GHAs / Airlines / Competitors

Medical insurance may be introduced


for Lower Staff up to Officer level
SUGGESTION FOR INCREASE 13th
Annual
IN PAY , PERKS & PRIVILEGES Conference

Leave Encashment with full rates maybe


Authorized

• 15% Disturbance Allowance for IIAP


• 20% Increase on running Salary
13th
Annual
Conference
13th
Annual
Conference

You might also like