B = 47.

8 m
m = 0
k = 40
S = 0.002

h A P R2/3 v Q
0.00 0.00 47.80 0.00 0.00 0.00
0.50 23.90 48.80 0.62 1.11 26.56

Tinggi Muka Air (m)


1.00 47.80 49.80 0.97 1.74 83.20
1.50 71.70 50.80 1.26 2.25 161.39
2.00 95.60 51.80 1.50 2.69 257.31
2.50 119.50 52.80 1.72 3.08 368.50
3.00 143.40 53.80 1.92 3.44 493.14
3.50 167.30 54.80 2.10 3.76 629.82
4.00 191.20 55.80 2.27 4.07 777.38
4.50 215.10 56.80 2.43 4.35 934.85
5.00 239.00 57.80 2.58 4.61 1101.42
5.50 262.90 58.80 2.71 4.85 1276.36
6.00 286.80 59.80 2.84 5.09 1459.06
6.50 310.70 60.80 2.97 5.31 1648.95
7.00 334.60 61.80 3.08 5.52 1845.55
7.50 358.50 62.80 3.19 5.71 2048.41
8.00 382.40 63.80 3.30 5.90 2257.14
8.50 406.30 64.80 3.40 6.08 2471.36
9.00 430.20 65.80 3.50 6.25 2690.76
9.50 454.10 66.80 3.59 6.42 2915.03
Lengkung Debit Amandit
10.00
9.00
Tinggi Muka Air (m)

8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0 500 1000 1500 2000 2500 3000 3500
Debit (m3/dt)