You are on page 1of 27

December 2017

Large meter installation


requirements and
sizing guide
Meters 32 mm or greater
Contents

1 Commercial and Industrial Metering ..................................................................................................... 3


1.1 Installation requirements for meter sizes 32 mm and above.................................................................. 3
1.2 Backflow ................................................................................................................................................. 3
1.3 Valves ..................................................................................................................................................... 3
1.4 Meter assembly set up – general requirements ..................................................................................... 3
1.5 Meter selection and application guide – 32 mm to 150mm including (Magflow) .................................. 4
1.6 Meter assembly set up – 32 mm, 40 mm and 50 mm ............................................................................. 5
1.6.1 Non-testable meter assembly ................................................................................................................ 5
1.6.2 Testable meter assembly ....................................................................................................................... 6
1.6.3 Non-testable meter assembly ................................................................................................................ 7
1.6.4 Testable meter assembly ........................................................................................................................ 8
1.7 Meter assembly set up – 50 mm and 150 mm (Helix) ............................................................................. 9
1.7.1 Non-testable meter assembly ................................................................................................................ 9
1.7.2 Testable meter assembly ...................................................................................................................... 10
1.8 Meter assembly set up – 100 mm and 150 mm (MagFlow).................................................................... 11
1.8.1 Non-testable meter assembly ............................................................................................................... 11
1.8.2 Testable meter assembly ....................................................................................................................... 12
1.9 Meter assembly set up – 100 mm x 40 mm and 150 mm x 40 mm ........................................................ 13
1.9.1 Metering of fire services ....................................................................................................................... 13
1.10 Meter assembly set up – 100 mm x 40 mm and 150 mm x 50 mm......................................................... 14
1.10.1 Metering of single pipe lifestyle villages - where private sub-meters are installed ............................... 14
1.11 Meter assembly set up – 100 mm and 150 mm ...................................................................................... 18
1.11.1 Metering of trade waste ....................................................................................................................... 18
1.11.2 Trade waste meter above ground assembly .......................................................................................... 18
1.11.3 Trade waste meter below ground assembly .......................................................................................... 19
2 Plumbing solutions: water and general fire service typical arrangements – Barwon Water ................ 20

December 2017 A12709213 2


1 Commercial and Industrial Metering
1.1 Installation requirements for meter sizes 32 mm and above
Only Barwon Water supplied and approved meters will be accepted on meter installations an must comply
with the National Measurement Act as administered by the National Measurement Institute’s specifications
and codes, be compliant with NMI R49-1 and AS 3565.
Meters shall be installed in accordance with AS/NZS 3500 1; and AS 2845 2, and Barwon Water, Metering
Policy.
No water meter or fire service leak detector check valve with by-pass meter shall be placed in a location that
creates an OH&S issue for either the public or Barwon Water personnel, limits access or is a “Confined Space”.
No water meter is to be located near or in an electrical cabinet or electrical control room.

1.2 Backflow
To protect the water supply system and the public from any potential backflow incidents Barwon Water
requires all new connections and existing medium and high hazard rated properties to install a “Backflow
Prevention Device (BPD)” at the water meter assembly. The BPD/s shall be appropriate to the development
type as specified in AS/NZS 3500, and must be of a rating which is equal to or greater than that required to
protect a zone and or individual hazard within the development. If the BPD is a testable device then it must
be tested in accordance to AS/NZS 2845 at commissioning stage of the meter installation.
(a) If a testable Reduced Pressure Zone (RPZ) device is installed, the relief valve of the RPZ must be a
minimum 300mm to and above the natural ground

1.3 Valves
Resilient seated flanged gate valves are required for all meter assemblies 80mm DN and over. If Dura
butterfly valves are used, they must be either flanged or lugged type and they must also have a geared
spindle.
NOTE: Quick shut off valves, sandwich or wafer butterfly valves are not acceptable.

1.4 Meter assembly set up – general requirements


(a) Barwon Water requires meters DN 32 or larger be set at a minimum height of 300mm and supported
independently of piping supporting the meter in a horizontal position.
(b) All meters assemblies shall be installed in a horizontal position and correctly supported inline with
AS/NZS 3500.

(c) The meter is installed with the dial face in a position where an unassisted person standing on the floor
can easily read it.
(d) All installations DN 32mm and greater must be fitted with a test ferrule immediately down stream of the
water meter and prior to the outlet valve. 3
(e) The RPZ relief valve must to be 300mm be above the natural ground
(f) No Branch pipe is closer than the lower outlet bend of the water meter assembly
(g) All meters installed in industrial or commercial buildings must at all times be provided with clear safe
access around the water meter to enable reading, testing, inspection, maintenance and exchange at all
times. This may include a secured fenced area with external access via gate.

1
Reference: AS/NZS 3500 National Plumbing and Drainage part 1 Water Services
2
Reference: AS 2845 Water supply – Backflow Prevention devices
3
Reference: Plumbing Regulation 1998 No. 148 part 31D ref. 12.8

December 2017 A12709213 3


(h) The water meter including the pipes and fittings must not be embedded in concrete formwork or
concrete walls.
(i) Meters shall be installed within 7 days (1 week) of issue.

1.5 Meter selection and application guide – 32 mm to 150mm including (Magflow)


Meter that fall in to four categories - Positive Displacement (PD), Single Jet (SJ) meters, Helix (Turbine) and
Magflow meters
Meters available to Barwon Water and Application
Size Manufacture and model Type Application
32mm ELSTER – PSM (PD) 75% LOW FLOW 25% MED FLOW
32mm ACTARIS - TD8 (PD) 75% LOW FLOW 25% MED FLOW
40mm ELSTER – PSM (PD) 75% LOW FLOW 25% MED FLOW
40mm ELSTER – PSM (PD) 50% LOW FLOW 50% MED FLOW
40mm ACTARIS – FLOWSTAR (SJ) RADIO READ
ELSTER – KG2000 (PD)
75% LOW FLOW 25% MED FLOW
50mm ELSTER – HELIX 5000 Digital (Turbine)
display comes with Logging 25% LOW FLOW 50% MED FLOW 25% HIGH FLOW
Cable pre-installed
50mm ACTARIS – FLOWSTAR (SJ) RADIO READ
ELSTER – HELIX 5000 Digital
80mm display comes with Logging (Turbine) 25% LOW FLOW 50% MED FLOW 25% HIGH FLOW
Cable pre-installed
80mm ACTARIS – FLOWSTAR (SJ) RADIO READ
ELSTER – HELIX 5000 Digital
100mm display comes with Logging (Turbine) 25% LOW FLOW 50% MED FLOW 25% HIGH FLOW
Cable pre-installed
100mm ACTARIS – FLOWSTAR (SJ) RADIO READ
100mm x 100m MAGFLOW x 40mm ELSTER –PSM SINGLE PIPE SCHEME - LIFESTYLE VILLAGES ONLY
40mm (PD) WHERE PRIVATE SUB-METERS ARE USED
ELSTER – HELIX 5000 Digital
150mm display comes with Logging (Turbine) 25% LOW FLOW 50% MED FLOW 25% HIGH FLOW
Cable pre-installed
150mm ACTARIS – FLOWSTAR (SJ) RADIO READ
150mm MAGFLOW x 50mm ELSTER – SINGLE PIPE SCHEME - LIFESTYLE VILLAGES ONLY
150mm x 50mm
KG2000 (PD) WHERE PRIVATE SUB-METERS ARE USED
100mm DETECTOR CHECK WITH 40MM BY-PASS METER FIRE SERVICE Only
150mm DETECTOR CHECK WITH 40MM BY-PASS METER FIRE SERVICE Only
All sizes MAGFLOW HIGH VOLUME USERS, TRADE WASTE & FIRE SERVICE WHEN SPECIFIED

** NOTE – Actaris meters can be supplied as radio read meters


Actaris flowstar models are suitable for small bore hose reel services

December 2017 A12709213 4


1.6 Meter assembly set up – 32 mm, 40 mm and 50 mm
1.6.1 Non-testable meter assembly (see Diagram 1)
Meter that fall in to this category are Positive Displacement (PD) and Single Jet (SJ) meters
(a) 32mm ELSTER – PSM (PD)
(b) 32mm ACTARIS - TD8 (PD)
(c) 40mm ELSTER – PSM (PD)
(d) 40mm ACTARIS – FLOWSTAR (SJ) RADIO READ
(e) 50mm ELSTER – KG2000 (PD)
(f) 50mm ACTARIS – FLOWSTAR (SJ) RADIO READ

Diagram 1

December 2017 A12709213 5


1.6.2 Testable meter assembly (see Diagram 2)
Meter that fall in to this category are meter assemblies fitted with RPZ
A Barwon Water Backflow agreement is required for these types of installations
(a) 32mm ELSTER – PSM (PD)
(b) 32mm ACTARIS - TD8 (PD)
(c) 40mm ELSTER – PSM (PD)
(d) 40mm ACTARIS – FLOWSTAR (SJ) RADIO READ
(e) 50mm ELSTER – KG2000 (PD)
(f) 50mm ACTARIS – FLOWSTAR (SJ) RADIO READ

Diagram 2

December 2017 A12709213 6


Meter assembly set up – 80 mm and 150 mm (Single Jet) radio read
1.6.3 Non-testable meter assembly (see Diagram 3)
Meter that fall in to this category - Single Jet (SJ) meter assemblies
(a) 80mm ACTARIS – FLOWSTAR (SJ) RADIO READ
(b) 100mm ACTARIS – FLOWSTAR (SJ) RADIO READ
(c) 150mm ACTARIS – FLOWSTAR (SJ) RADIO READ

Diagram 3

December 2017 A12709213 7


1.6.4 Testable meter assembly (see Diagram 4) radio read
Meter that fall in to this category - Single Jet (SJ) meter assemblies fitted with RPZ
A Barwon Water Backflow agreement is required for these types of installations
(a) 80mm ACTARIS – FLOWSTAR (SJ) RADIO READ
(b) 100mm ACTARIS – FLOWSTAR (SJ) RADIO READ
(c) 150mm ACTARIS – FLOWSTAR (SJ) RADIO READ

Diagram 4

Test ferrule size Meter size


20mm --------------- 32 mm to 80mm
Resilient Seated
25mm -------------- 100mm
Lugged Geared
Valves 40mm -------------- 150mm

Testable Device Meter Dirtbox Inlet


Valve
Outlet
Valve

Relief Down stream Flow


Valve Strainer straightener
Dia x 3

Back flow device


Flow
High
Medium Hazard rating to be
determined on application
BARWON WATER
SINGLE JET METER ASSEMBLY
WITH TESTABLE BACK FLOW DEVICE
NOTE:
Back flow devices must be installed to meet AS/NZS DRN. Henry Freise NOVEMBER 1999
RPZ to be minimum 300mm above the ground from the lowest point SCALE. N.T.S. C Copyright

December 2017 A12709213 8


1.7 Meter assembly set up – 50 mm and 150 mm (Helix)
1.7.1 Non-testable meter assembly (see Diagram 5)
Meter that fall in to this category Helix meters
(a) 50mm ELSTER – HELIX 5000
(b) 80mm ELSTER – HELIX 5000
(c) 100mm ELSTER – HELIX 5000
(d) 150mm ELSTER – HELIX 5000

Digital display comes with Logging Cable pre-installed

Diagram 5

December 2017 A12709213 9


1.7.2 Testable meter assembly (see Diagram 6)
Meter that fall in to this category are Helix meter assemblies fitted with RPZ
A Barwon Water Backflow agreement is required for these types of installations
(a) 50mm ELSTER – HELIX 5000
(b) 80mm ELSTER – HELIX 5000
(c) 100mm ELSTER – HELIX 5000
(d) 150mm ELSTER – HELIX 5000

Digital display comes with Logging Cable pre-installed

Diagram 6

December 2017 A12709213 10


1.8 Meter assembly set up – 100 mm and 150 mm (MagFlow)
1.8.1 Non-testable meter assembly (see Diagram 7)
Meter that fall in to this category MagFlow meters with integral or remote display
(d) 100mm SIEMENS - MAGFLOW
(e) 150mm SIEMENS - MAGFLOW

Diagram 7

Test ferrule size Meter size


20mm --------------- 32 mm to 80mm
Resilient Seated 25mm -------------- 100mm
Lugged Geared
Valves 40mm -------------- 150mm
Meter Up stream
NON-Testable Device Flow Inlet
straightener Valve
Outlet
Valve Dia x 5

Down stream Flow


straightener
Dia x 3

BARWON WATER
Back flow device
Flow 240 Volt MAGFLOW METER ASSEMBLY
Low Hazard rating to be WITH NON-TESTABLE BACK FLOW DEVICE
determined on application
DRN. Henry Freise JUNE 2010
NOTE: SCALE. N.T.S. C Copyright
240 Volt Power supply required
NO DIRT BOX REQUIRED ON MAG FLOW METERS
Back flow devices must be installed to meet AS/NZS 3500
Up stream (US) Flow Straightener or (length of pipe = Dia x 5) to be fitted between last up stream disturbance (eg. Dirtbox and meter.)
Down stream (DS) Flow Straightener length or (length of pipe = Dia x 3)– (Test ferrule to be installed on DS flow straightener)
This is to meet the meter manufactures' installation requirements

December 2017 A12709213 11


1.8.2 Testable meter assembly (see Diagram 8)
Meter that fall in to this category are MagFlow meter assemblies fitted with RPZ
A Barwon Water Backflow agreement is required for these types of installations
(d) 100mm SIEMENS - MAGFLOW
(e) 150mm SIEMENS - MAGFLOW

Diagram 8

Test ferrule size Meter size


20mm --------------- 32 mm to 80mm
Resilient Seated
25mm -------------- 100mm
Lugged Geared
Valves 40mm -------------- 150mm
Meter Up stream
Testable Device Flow Inlet
straightener Valve
Outlet
Valve Dia x 5

Relief Down stream Flow


Valve Strainer straightener
Dia x 3

BARWON WATER
Back flow device
Flow MAGFLOW METER ASSEMBLY
High
Medium Hazard rating to be WITH TESTABLE BACK FLOW DEVICE
determined on application
DRN. Henry Freise JUNE 2010
NOTE:
SCALE. N.T.S. C Copyright
240 Volt Power Supply required
NO DIRT BOX REQUIRED ON MAG FLOW METERS
Back flow devices must be installed to meet AS/NZS
RPZ to be minimum 300mm above the ground from the lowest point
Up stream (US) Flow Straightener or (length of pipe = Dia x 5) to be fitted between last up stream disturbance (eg. Dirtbox and meter.)
Down stream (DS) Flow Straightener length or (length of pipe = Dia x 3)– (Test ferrule to be installed on DS flow straightener)
This is to meet the meter manufactures' installation requirements

December 2017 A12709213 12


1.9 Meter assembly set up – 100 mm x 40 mm and 150 mm x 40 mm
1.9.1 Metering of fire services (see Diagram 9 and 10)
Meter that fall in to this category (Can be with or without fire booster system)
(a) 100mm DETECTOR CHECK WITH 40MM BY-PASS METER
(b) 150mm DETECTOR CHECK WITH 40MM BY-PASS METER
(c) If a Magflow meter is installed 5 x DN flow straightener must be fitted upstream of the meter

Diagram 9

Test ferrule Meter size


20mm ------------32 mm to 80mm
25mm ----------- 100mm
40mm ----------- 150mm Inlet
Valve Title
Test Boundary
Outlet ferrule
Valve
Spindle
Protection and
Cast Iron Cover

Single Check
Flow Detector
Flow
with 40mm By-
Pass Meter Tapping to
Main
Main

DETECTOR CHECK VALVE WITH METERED BY

Diagram 10

Booster Test ferrule Meter


Booster
Deliver 20mm------------- 32 mm to 80mm
Suction
25mm------------- 100mm
40mm-------------150mm
Inlet
Single Check Flow
Valve
Detector With
Title Boundary
40mm By-Pass
Test ferrule Meter

Spindle Protection
and Cast Iron Cover

Flow
40mm By-Pass Meter with lockable
valves.
Tapping to
Main Main
Valves must be locked in the open
position with

Fire Service - 003 Padlocks

(Installer must supply Padlocks)

SINGLE DETECTOR CHECK VALVE WITH METERED BY-PASS with BOOSTER


ASSEMBLY

December 2017 A12709213 13


1.10 Meter assembly set up – 100 mm x 40 mm and 150 mm x 50 mm
1.10.1 Metering of single pipe lifestyle villages - where private sub-meters are installed (see Diagram 10
A & B and 11 A & B)
Meter that fall in to this category (with or without fire booster system)
(d) 100mm DETECTOR CHECK WITH 40MM BY-PASS METER
(e) 150mm DETECTOR CHECK WITH 50MM BY-PASS METER

Diagram 10A – Combined Fire Domestic Metering Solution with Metered Bypass and pressure Limiting
Valve (No Booster)

Life style village Combined Fire Domestic Solution without booster - With Testable Backflow
Prevention Device and Pressure Limiting Valve (PLV to be set 20-30kPA less than available pressure
100mm MagFlow Meter & 40mm by-pass meter, (by-pass meter can be MagFlow meter)
150mm MagFlow Meter & 50mm by-pass meter, (by-pass meter can be MagFlow meter)
Normal Valve Positions and Alternate Valve Position

Pressure
limiting valve
RPZ Testable Back Flow
Mag Meter

By Pass Meter

Mag Meter

Pressure By Pass Meter


limiting valve
RPZ Testable Back Flow
Mag Meter

Alternate valve By Pass Meter


iti

December 2017 A12709213 14


Diagram 10B – Combined Fire Domestic Metering Solution with Metered Bypass and pressure Limiting
Valve (with Booster)

Life style village Combined Fire Domestic Solution without booster - With Testable Backflow
Prevention Device (NOT RPZ) and Pressure Limiting Valve (PLV to be set 20-30kPA less than
available pressure (If RPZ Fitted an additional single check shall be required immediately after
both the RPZ’s to prevent relief valve on RPZ form operating during boosting operations.
100mm MagFlow Meter & 40mm by-pass meter, (by-pass meter can be MagFlow meter)
150mm MagFlow Meter & 50mm by-pass meter, (by-pass meter can be MagFlow meter)
Normal Valve Positions and Alternate Valve Position

Pressure limiting
valve
MagMeter

Testable Back Flow

By Pass Meter

Pressure limiting valve


Testable Back Flow

MagMeter Meter

Alternate valve By Pass


position M

December 2017 A12709213 15


Diagram 11A – Combined Fire Domestic Metering Solution with Metered Bypass No pressure Limiting
Valve (No Booster)

Life style village Combined Fire Domestic Solution without booster - With Testable Backflow
prevention
100-150mm MagFlow Meter & 50mm by-pass meter, (by-pass meter can be MagFlow meter)
Normal Valve Positions - 150mm must be lock open with FS003 Key on all Valves

Life style village Combined Fire Domestic Solution without booster - With Testable Backflow
prevention
100-150mm MagFlow Meter & 50mm by-pass meter, (by-pass meter can be MagFlow meter)
Alternate Valve Positions 150mm must be lock open with FS003 Key on all Valves

December 2017 A12709213 16


Diagram 11B – Combined Fire Domestic Metering Solution with Metered Bypass No pressure Limiting
Valve (with Booster)

Life style village Combined Fire Domestic Solution with booster - With Testable
Backflow prevention
100-150mm MagFlow Meter & 50mm by-pass meter, (by-pass meter can be MagFlow
meter)
Valves Normal Position 150mm must be lock open with FS003 Key on all Valves

Life style village Combined Fire Domestic Solution without booster - With Testable
Backflow prevention
100-150mm MagFlow Meter & 50mm by-pass meter, (by-pass meter can be MagFlow
meter)
Normal Valve Positions - 150mm must be lock open with FS003 Key on all Valves

December 2017 A12709213 17


1.11 Meter assembly set up – 100 mm and 150 mm
1.11.1 Metering of trade waste (see Diagram 12 and 13)

1.11.2 Trade waste meter above ground assembly (see Diagram 12)
Meter that fall in to this category are MagFlow meter assemblies with integral display (can be supplied with
remote meter display)
Upstream and down-stream test ferrules to installed for in situ flow tests
All sizes SIEMENS - MAGFLOW

Diagram 12

MagFlow meter with Integral display (shown)


Also available as remote display available (with 10m remote cable)
Test ferrule size Meter size
20mm --------------- 32 mm to 80mm
25mm -------------- 100mm Inlet
Outlet
40mm -------------- 150mm Valve
Valve
Meter

Up stream
Down stream Flow Flow
straightener straightener
Dia x 3 Dia x 5

BARWON WATER
Flow MAGFLOW METER ASSEMBLY
FOR ABOVE GROUND TRADE WASTE
INSTALLATIONS
Secure 240v power supply must be provided
DRN. Henry Freise JUNE 2010
NOTE:
SCALE. N.T.S. C Copyright

Up stream (US) Flow Straightener or (length of pipe = Dia x 5) to be fitted between last up stream disturbance (eg. Valve and meter.)

Down stream (DS) Flow Straightener length or (length of pipe = Dia x 3)– (Test ferrule to be installed on DS flow straightener)
This is to meet the meter manufactures' installation requirements

December 2017 A12709213 18


1.11.3 Trade waste meter below ground assembly (see Diagram 13)
Meter that fall in to this category are MagFlow meter assemblies with remote meter display
Flanged connections may be substituted buy using gibault joint or stain less band connections.
Upstream and down-stream test ferrules to installed for in situ flow tests
All sizes SIEMENS – MAGFLOW

Diagram 13

December 2017 A12709213 19


2 Plumbing solutions: water and general fire service typical
arrangements – Barwon Water
Water general and fire service typical arrangements
Legend

Valve Note 1 For 20 -25 services, a right-angled ball valve is


required at the meter inlet.

Note 2 For 32 + Services, Gate Valve at the meter inlet, a test


Dirt Box ferrule and a gate valve down stream of the test ferrule, a Dirt Box is
required for all services

Note 3 For “Low Hazard” rating, containment protection is


Meter
required. Non-Testable Backflow Prevention Device must be fitted on
the outlet side of the meter

Note 4 For “Medium & High Hazard” ratings, Containment


Test Ferrule protectionis mandatory.

Note 5 Arrangement of valves to suite as per General service size


applicable d
“Hazard Rating”.
Line Strainer
Note 6 The threaded outlet of any testing ferrule must be
“Capped or Plugged”.

Note 7 Double Check Valves may need to be fitted as


Protection on Fire
Z Service Hose reels. Refer A.S. 3500 Part
Backflow Prevention Appendix E
Device
Note8 The fitting of a Single Check Valve or
Backflow Prevention Device
i t on the metered by-pass of a
Check Valve is required.
Single Detector Check
Note 9 Where testable Backflow Prevention Devices are
required, the isolating valve shown immediately upstream of the line
strainer and immediately down stream of the device, must have resilient
seated valves
Detector Check
Valve

December 2017 A12709213 20


GENERAL SERVICE - LOW HAZARD (Residential/Industrial) TYPICAL ARRANGEMENT

(a) 20mm – 25mm Service (b) 32mm – 50mm Service (c) 50mm + Service where Flow
Straightener is specified
Water Main

Valve Valve Spindle & Cover Valve


to Surface
20mm – 25mm 32mm – 50mm 80mm + Property Boundary

Valve Valve Valve

Meter Dirt Box Dirt Box

Meter

Test Ferrule
Meter
Non Testable Backflow
Prevention Device
Test Ferrule
Valve
Direction of Non Testable Backflow
Flow Prevention Device

NOTES 1 & 3 Apply

NOTES 2, 3 & 6 Apply

GENERAL SERVICE – MEDIUM/HIGH HAZARD (Industrial) TYPICAL ARRANGEMENT

(a) 20mm – 25mm Service (b) 32mm – 50mm Service (c) 50mm + Service where Flow
Straightener is specified

Water Main

Valve Valve Spindle & Cover Valve


to Surface
20mm – 25mm 32mm – 50mm 80mm + Property Boundary

Valve Valve Valve

Meter Dirt Box Dirt Box


Up Stream Flow
Meter Straightener Min.
Valve
Length = 5x Dia
Test Ferrule
Strainer Meter
Valve
Down Stream Flow
Straightener Min.
able Backflow
Strainer Length = 3x Dia
ention Device
Test Ferrule

Valve Testable Backflow Valve


Prevention Device
Strainer
Valve
Direction of Testable Backflow
Flow Prevention Device
NOTES 1, 4, & 9 Apply
Direction of
Flow

NOTES 2, 4, 6 & 9 Apply

NOTES 2, 4, 6 & 9 Apply

December 2017 A12709213 21


FIRE AND GENERAL SERVICE - TYPICAL ARRANGEMENT

(a) Fire Hose Reel & General Service (b) Fire Hydrant/Ho se Reels
25mm – 50mm with detector Check Valve
100mm - 150mm

Water Main

Valve Spindle & Cover Valve


to Surface
25mm – 50mm 80mm –150mm Property Boundary

Valve

Dirt Box Valve


Valve Valve Locked
Meter open with
Dirt Box FS 003 Key
Test
Ferrule Meter
Meter
Valve
Valve
Single Check
Single Check Valve
Valve Backflow
Prevention Backflow
Valve Locked
Device Prevention
Valve open with
Fire Hose Device FS 003 Key
Valve
Reel Service Valve Fire
Hydrant/Hose
General Service
General Service Reel Service

Direction of
Flow
Dirctio n of
NOTES 2, 3, 4, 5, 6 & 7 Flow All Notes as Applicable to suit
Apply Service Type, Size & Hazard Rating
Apply

FIRE AND GENERAL SERVICE - TYPICAL ARRANGEMENT

(c) Metered combined Fire & General Service Specific (d) Trident Fire/ Sprinkler/Fire
Consent Required from Relevant Fire Authority Hydrant/General Service
X…..NOT APPROVED BY BARWON WATER …..X Water Main

Valve Spindle & Cover Valve Spindle & Cover Valve


to Surface to Surface
100mm 100mm Size to be Determined Property Boundary
minimum Minimum
Valve Valve
Dirt Box
Dirt Box
Valve
Master Valve
Meter Valve
Meter Valve Locked
Test ferrule Dirt Box open with
Test Ferrule Single FS 003 key
Meter Check
Backflow Valve
prevention Valve Valve Meter
Device
Detector Check
Sub
Meter Single Backflow
valve Check Prevention Test ferrule
Backflow Device
Prevention Valve Valve Locked
Device open with
Valve
Combined Fire FS 003 key
Reel and General General Fire General Sprinkler
Service Service Service Service Service Fire
Hydrant/Hose
Reel Service

Direction of Direction of
Flow Flow Direction of Direction of
Flow Flow
ES 2, 3, 4, 5, 6 & 7 Apply
NOTES 2, 3, 4, 5, 6 & 7 Apply All Notes as Applicable to suit
Service Type, Size & Hazard Rating
Apply

December 2017 A12709213 22


FIRE AND GENERAL SERVICE - TYPICAL ARRANGEMENT

(e) Residential & Domestic Fire Sprinkler (f) Booster Connection around Meter
Service

Water Main

Valve Valve Valve


All Spindle & Cover to Surface
Size to be Determined Size to be Determined Property Boundary

Valve

Valve
Valve Valve Locked
Valve
open with Valve
FS 003 key
Meter
Suction Point
Meter Meter
Single Check Valve
Detector
Valve Delivery Point
Check
Valve
Backflow
Prevention Valve Locked Single
Fire Sprinkler Device Valve open with Check
Service FS 003 key Valve
General Service Fire
Hydrant/Hose Fire & General
Reel Service Service
Direction of
Direction of
Flow
Flow
Direction of
All Notes as Applicable to suit Flow
NOTES 1, 2, 3, 4, 5 & 6 Apply
Service Type, Size & Hazard Rating All Notes as Applicable to suit
Apply Service Type, Size & Hazard Rating
Apply

INTERCONNECTED FIRE AND GENERAL SERVICE CONNECTION TYPICAL ARRANGEMENT

(a) Single Water Main Fed both Directions (b) Different Water Main with trident connection

Valve
Valve Spindle & Cover
Spindle & Cover Valve
to Surface
to Surface
Direction of Property Boundary
undary
Flow

Valve Valve Valve


Valve Valve Valve
Single
Meter Check
Valve
Meter
Backflow
Meter Meter
Backflow Prevention
Prevention Device
Detector Device
Check Valve Valve
Valve
Valve All By-pass
All By-pass Fire Valves Locked
General Sprinkle Hydrant/Hose
Valves Locked Service Fire Service open with FS003
open with FS003 Reel Service Key
Key General Service
General Service
Valve Valve
Fire Hydrant
Service Backflow
Prevention
tion of Device Single
ow Check
Direction of Meter Valve
Flow

Valve Valve Valve

Property Boundary
S APPLICABLE TO SUIT SERVICE TYPE, SIZE & HAZARD RATING Direction of
Flow
RULES ARE REQUIRED ON ALL INTERCONNECTIONS Valve Water Main

December 2017 A12709213 23


FIRE AND GENERAL SERVICE - TYPICAL ARRANGEMENT

Typical 100mm – 250mm General Water Service


32mm – 50mm with Metered Fire, General Service & Fire
Fire Hose Reel & General Sprinkler Service
Service with up to six
individual meters mounted A Booster System may also be incorporated
horizontally

32mm – 50mm Valve Valve

Valves locked open


with 003 fire Valves locked open
service lock with 003 fire
Valve service lock

Dirt Box MagFlow Meter


Single/multi jet Test Ferrule
Meter General Water
Single Check Service
Test Ferrule
valve
Valve Valve
Single Check
valve
Backflow Valve
Prevention
Device General fire &
Hose Reel
Fire Hose Reel service Fire Sprinkler
Service Service

Direction of Direction of
General Service
Flow Flow

NOTES 2, 3, 4, 5, 6 & 7 Apply


NOTES 2, 3, 4, 5, 6 & 7 APPLY

PREFERED OPTION by BARWON

FIRE AND GENERAL SERVICE - TYPICAL ARRANGEMENT

Typical 100mm – 250mm General Water Service with


Metered Fire, Fire Sprinkler Service & General
Service

A Booster System may also be incorporated in Fire


service

Valves

Boundary

NOTE Valve locked open


Flow Straightener 5 X dia. up stream & 3 with 003 fire Valves
X dia. down Stream must be fitted service lock
to all mag flow meters

Leak Detector Check Valve with metered bypass or MagFlow


MagFlow Meter
Test Ferrule Test Ferrule

Resilient seated Valve Resilient seated Valve

Strainer Strainer

RPZ Backflow Prevention Device RPZ Backflow Prevention Device

Resilient seated Valve Resilient seated Valve

Valves General Water


Service
Check valve

General fire & Fire Sprinkler


Hose Reel service Service

Direction of Flow

December 2017 A12709213 24


COMBINED FIRE AND DOMESTIC SERVICE WITH METERED BY-PASS
FOR LIFESTYLE VILLAGES- TYPICAL ARRANGEMENT

Typical 100mm – 150mm General Water Service with Metered Fire-


Domestic with Metered By-Pass for lifestyle villages
Service & General Service Including Private Fire Plugs

With NO Booster or Booster downstream of Meter Assembly

240V AC power must be provided for MagFlow meter

Valve

Boundary

NOTE Valve locked


Flow Straightener 5 X dia. upstream & open with Valves
3 X dia. down Stream must be 003 fire
fitted to all mag flow meters service
MagFlow By-Pass Meter
M t
Test Ferrule Test Ferrule
Resilient seated

Pressure limiting Valve Strainer

Resilient seated Valve RPZ Backflow Prevention

Strainer
Resilient seated Valve

RPZ Backflow Prevention

Resilient seated Valve General Water


Service

General fire & Hose Reel


service
Including Private Pire plugs

Direction of
Flow

December 2017 A12709213 25


COMBINED FIRE AND DOMESTIC SERVICE WITH METERED BY_PASS
FOR LIFESTYLE VILLAGES- TYPICAL ARRANGEMENT
Typical 100mm – 150mm General Water Service with Metered Fire- Domestic with Metered
By-Pass for lifestyle villages Service & General Service Including Private Fire Plugs

A Booster System may also be incorporated in Fire service additional single check valve
required to prevent RPZ device dump valve operating during boosting

240V AC power must be provided for MagFlow meter

Valve

Boundary

Valves

MagFlow By-Pass Meter

Test Ferrule Test Ferrule


Resilient seated

Pressure limiting Valve Strainer

Resilient seated Valve Terstable Backflow


Strainer
Resilient seated Valve

Testable Backflow

General Water Valve locked


Resilient seated Valve Service open with
003 fire
Single Check Valve. i
For Boosted fire services only
when fitted with RPZ NOTE
Backflow Prevention Flow Straightener 5 X dia. upstream
& 3 X dia. down Stream must
General fire & Hose Reel be fitted to all mag flow meters
service and Private Fire
Plugs Direction of
Flow

December 2017 A12709213 26


Notes

December 2017 A12709213 27