Professional Documents
Culture Documents
RAP Tower 36Mpdf PDF
RAP Tower 36Mpdf PDF
00
PEMBANGUNAN MENARA SST 36 M
JUMLAH UPAH &
NO DESCRIPTION OF WORK Harga Jasa Harga Material Harga + Satuan Asumsi Volume satuan JUMLAH UPAH JUMLAH MATERIAL
MATERIAL
2 Pengiriman material tower, ME, dan pagar 11,500,000.00 11,500,000.00 1.00 ls 11,500,000.00 11,500,000.00
3 ATP, Asbuilt Drawing dan Dokumen 3,000,000.00 3,000,000.00 1.00 ls 3,000,000.00 3,000,000.00
4 Sewa gudang di site 5,000,000.00 5,000,000.00 1.00 ls 5,000,000.00 5,000,000.00
4,048,974.36