You are on page 1of 1
2019 C= AT PCR expansion | rev: 2 Project, RFQ/F/PCR/01 ‘90. Supply and installation of 5 mm thickness clear glasses forthe frame with required consumable ‘materials (Silicone, beadings, pop revert, etc.) 91. Supply, fabrication and installation of Aluminum shop front doors as per the drawing with SS door handle, auto door closer and lock. ‘92, Supply, fabrication and installation of SO mmxS0 mm (41mm thickness) box bar frame for the mesh structure as per the drawing. 93. Supply, fabrication and instalation of 40 mmx40 mm (3 mm thickness) box bar frame for the mesh structure as per the drawing. ‘94. Supply, fabrication and installation of 50 mm x50 mm Gl mesh for the fabricated frame. 95. Painting ofall parts by black color anticorrosive paint, ‘96. Supply, fabrication and installation of 2 mm thickness 8” width transference strips for the doors. © Trench preparation. ‘97. Excavation of trench area (11m width and 1 depth) and removing of plants from the CEAT premises. 98. Leveling of excavated floor area, fill with sea sand and well compact by using pneumatic or electric imparters. ‘99. Supply and placing of 1000 gauge polythene layer for the column footage and flooring area, 1100. Supply, fabrication and installation of 10mm 460 N/mm? (150 mm x150 mm lap in both ways) reinforcement for the trench, 101. Supply and installing of necessary concreate blocks to rest the reinforcement. 102. Supply, fabrication and installation of required form work for the trench, ¢ 103. Supply and lying of G 25 150 mm thickness concreate for the trench. 104. Supply and installation of 5 mm thickness MS checker plate cover for the trench, * Building, Curing machine area preparation. 105. Covering off all area in close vicinity up to 5 m height. 106. _ Excavation of floor area average to 6” depth (excluding curing press area) and removing of plants from the CEAT premises. 107. Excavation of curing press base area average to 20” depth and removing of plants from the CEAT premises. 108. _Excavation/removing of warehouse side wall fully and disposal of all excavated materials from the CEAT premises. 109, Leveling of excavated floor area, fill with sea sand and well compact by using a Chipping of the floor concrete to average 6” deep using pneumatic or electric imparters as marked In the drawing, 110. Supply and placing of 1000 gauge polythene layer for the column footage and flooring area. 111. Supply, fabrication and installation of 10mm 460 N/mm2 (150 mm x150 mm lap in both ways) reinforcement for the 6” flooring, Department ‘Name

You might also like