You are on page 1of 8

Lampiran 1.

Penetapan Kadar Lengas Tanah

ANALISIS DATA

A. Kadar Lengas Tanah KLU = [ b - c / c - a ] x 100%


= [ (40,17 – 37,61) / (37,61 – 3,94) ] x 100%

= [ 2,56 / 33,67 ] x 100%

= 0,076 %

B. Kadar Lengas Tanah Loteng = [ b - c / c - a ] x 100%

= [ (28,15 – 27,09) / (27,09 – 4,55) ] x 100%

= [ 1,06 / 22,54 ] x 100%

= 0,047 %
Lampiran 2. Penetapan Tekstur tanah

ANLISIS DATA

 Tekstur tanah Loteng ;


8,5
1. Pasir = x100%
15

= 16,66 %
1
2. Debu = 15 x100%

= 6,66%
3. Liat = 100 - ( % I + % II )
= 100 - (16,66% + 6,66%)
= 76,68%
Lampiran 3. Penetapan Struktur tanah

ANLISIS DATA

 Berat jenis tanah ( BJ )


Tanah Loteng
a) Berat tanah kering mutlak

100
= ( 𝑐 − 𝑎 ) 100+KL gr

100
= (31,80 − 26,69) 100+6,79 gr

= 5,21 x 0,936 gr

= 4,87 gr

b) Volume total butir tanah


b−a d−c
= −
Bj1 Bj2
75,62−26,69 78,85−31,90 1,98
= − = 0,995
0,995 0,995

= 1,99 cm3

c) Kerapatan butir tanah

𝐵𝑒𝑟𝑎𝑡 𝑡𝑎𝑛𝑎ℎ 𝑘𝑒𝑟𝑖𝑛𝑔 𝑚𝑢𝑡𝑙𝑎𝑘 4,87 𝑔𝑟


= = 1,99 𝑐𝑚
𝑉𝑜𝑙𝑢𝑚𝑒 𝑡𝑜𝑡𝑎𝑙 𝑏𝑢𝑡𝑖𝑟 𝑡𝑎𝑛𝑎ℎ

= 2,44 𝑔/𝑐𝑚3

 Kerapatan masa ( BV )
Tanah Loteng
a) Berat bongkah kering mutlak

100
= 𝑎 𝑔𝑟
100 + 𝐾𝐿
100
= 𝑥28,08 𝑔𝑟
100 + 5,28
28,08
= 105,28 𝑔𝑟 = 1,80 𝑔𝑟

b) Volume bongkah tanah

(𝑏 − 𝑎)
= ( 𝑞 − 𝑟 − 𝑝) − 𝑚𝑙
0,87

(33,32 − 28,08)
= (720 − 0 − 700) − 𝑚𝑙
0,87

7,45
= 20 − 𝑚𝑙
0,87

= 23,9 − 6,02

= 13,48 𝑚𝑙

c) Kerapatan masa tanah


87 𝑎
= (100+𝐾𝐿){0,87(𝑞−𝑟−𝑝)−(𝑏−𝑎)}gr/cm3

87 𝑥 (28,08)
=
(100 + 5,28){0,87(720 − 0 − 700)} − (33,32 − 28,08)

2442,96
=
(105,28){0,87(20)} − (5,24)

=1,80 gr/cm3

 Porositas tanah
Tanah Loteng

1,80
= (1 − 2,44) 𝑥 100%

= (1 − 0,73)𝑥100%

= 27%
Lampiran 4. Konsistensi Tanah

ANALISIS DATA

a. Batas cair tanah ( BC )


 Tanah KLU
(b − c)
= 𝑥 100%
(c − a)
9,61 − 8,03
= 𝑥 100%
8,03 − 3,84
1,58
= 𝑥 100%
4,19
= 0,38 𝑥 100%
= 38%

 Tanah Loteng
(b − c)
= 𝑥 100%
(c − a)
9,81 − 7,95
= 𝑥 100%
7,95 − 4,0
1,86
= 𝑥 100%
3,95
= 0,47 𝑥 100%
= 47%

b. Batas lekat tanah ( BL )


 Tanah KLU
(b − c)
= 𝑥 100%
(c − a)
9,2 − 7,97
= 𝑥 100%
7,97 − 4,42
1,23
= 𝑥 100%
3,55
= 0,34 𝑥 100%
= 34%

 Tanah Loteng
(b − c)
= 𝑥 100%
(c − a)
8,81 − 7,20
= 𝑥 100%
7,20 − 3,78
1,61
= 𝑥 100%
3,42
= 0,47 𝑥 100%
= 47%

c. Batas gulung tanah ( BG )


 Tanah KLU
(b − c)
= 𝑥 100%
(c − a)
7,54 − 6,73
= 𝑥 100%
6,73 − 3,80
0,81
= 𝑥 100%
2,93
= 0,27 𝑥 100%
= 27%

 Tanah Loteng
(b − c)
= 𝑥 100%
(c − a)
5,70 − 5,23
= 𝑥 100%
5,23 − 3,81
0,47
= 𝑥 100%
1,42
= 0,33 𝑥 100%
= 33%
d. Batas berubah warna tanah ( BBW )
 Tanah KLU
(b − c)
= 𝑥 100%
(c − a)
8,74 − 7,64
= 𝑥 100%
7,64 − 3,72
1,1
= 𝑥 100%
3,92
= 0,28 𝑥 100%
= 28%

 Tanah Loteng
(b − c)
= 𝑥 100%
(c − a)
10,59 − 8,97
= 𝑥 100%
8,97 − 3,65
1,62
= 𝑥 100%
5,32
= 0,30 𝑥 100%
= 30%

e. Indeks plastilitas ( IP )
 Tanah KLU
= BC – BG
= 38% – 27%
= 11%

 Tanah Loteng
= BC – BG
= 47% – 33%
= 14%
f. Jangka olah tanah ( JO )
 Tanah KLU
= BL – BG
= 34% – 27%
= 7%
 Tanah Loteng
= BL – BG

= 47% – 33%

= 13%

g. Persediaan air maksimum ( PAM )


 Tanah KLU
= BC – BBW
= 38% – 28%
= 10%
 Tanah Loteng
= BC – BBW
= 47% – 30%
= 17 %

You might also like