COATING SYSTEM - SHOP PAINTED - STRUCTURAL STEEL AND PIPING
APPLICATION: EXTERIOR STRUCTURES
PROCEDURE:
1
ALL SURFACES TO BE COATED SHALL BE CLEAN, DRY AND FREE FROM CONTAMINATION. PRIOR TO PAINT
‘APPLICATION, ALL SURFACES SHALL BE ASSESSED AND TREATED IN ACCORDANCE WITH ISO 8504:2000.
(Ol. OR GREASE SHALL BE REMOVED IN ACCORDANCE WITH $SPC-SPI SOLVENT CLEANING.
ABRASIVE BLAST CLEAN TO STANDARD SSPC-$P6. IF OXIDATION HAS OCCURRED BETWEEN BLASTING AND
APPLICATION, THE SURFACE SHOULD BE RESLASTED TO THE SPECIHED VISUAL STANDARD. SURFACE DEFECTS
REVEALED BY THE BLAST CLEANING PROCESS SHALL 8 GROUND, FILLED OR TREATED IN THE APPROPRIATE
MANNE
THE PREPARED SURFACE SHALL HAVE A SHARP ANGULAR PROFILE OF 2-MILS (50-75 MICRONS}
IDEALLY, THE SURFACE MUST BE PRIMED WITHIN 4 HOURS OF COMMENCEMENT OF PREPARATION,
A STRIPE COAT SHALL DS, LAP JOINTS, PLATE EDGES, CORNERS, SHARP.
ANY OTHER AREAS WHERE SPRAY APPLICATION OF THE OVERALL COATING SYSTEM MAY PROVE DIFFICULT,
RESULTING IN LOW DRY FILM THICKNESS’
FOR DETAILED PRODUCT INFORMATION, REFER TO INTERNATIONAL'S PRODUCT DATA SHEETS.
COATING SYSTEM - SHOP PAINTED- STRUCTURAL STEEL & PIPING: PRODUCT INFORMATION
COLOUR: VANCOUVER WHARVES BLUE: FEDERAL STANDARD 15187
SURFACE PREPARATION: ——SSPC- SPI
SURFACE PREPARATION: SSPC- $P6
PRIMER: CATHACOAT 313 3+ S MILS DFT
STRIPE COAT: BAR-RUST 235 oF 236 2-3 MILS DFT
MID COAT: BAR-RUST 235 oF 236 6-8 MILs DFT
FINISH COAT: BAR-RUST 235 oF 236 6-8 MILS DFT
MIN. TOTAL DFT: 15 MILs
kw 2012 cuTomuL | 5 May 2014
MORGAN 7 src:
‘CANADA TERMINALS ULC | TECHNICAL SPECIFICATION
[SHOP PAINT EXTERIOR STRUCTURES ["" 1 OF 1