Im the recently concluded Ol Industry Safety Awards ceremony, two
‘comperduns werereeased by Her‘ble Union Minter of tat), etrleum
natal Gas. The Comper on Aah Major Incgents of Of and Ges
Indusyacomplston indent oat eleven years entairgthe deals
of the ince, root cause anal along with recommantatins. The
compendum on Safety Aut Checlst whch war alo relesed during the
‘occasion covers the emir grt of operations comoring aut helt for
‘efinries and GP, xplonition and Production, Maran, Pipes and
Construction Managment. ams, nds il Sd both the compen
afl ag woul elp instr to minim ozs and enhance ayn th
ens whe2dresing the gathaing, Mant merioned tht here shuld
bea debate on te foematon of sn umbrel organization tat must ok after
safety of tand Gas instr Organon. Cure the safety ssi the
‘sas ndstries ar looked afer by DGS, PSO, PNGRE andOID. Du tothe
Fragmevstion, fe quite norma tht the ksue tent lake after proper
‘Therefore, Mantras tightly ered abate onthisimportant svete
way eter to have ane sgl agency eglator which must be accountable
tneresporie for overecing sft ofthe ee ol and gs indtry, Towards
ths, O10/MOPRNG has prepared a Oa a namely Petroleum and Nat
(Ses industry Safty Board which i under coniderton of Commitee of
‘he modern doy operon of Ol nd Gas ndusties iy comple. That
ffctvely managing process sit nO Setor necessary call for eons
vith adequate knowedge and experience of petroleum business. Tus the
requirement of domain experts is Wa ts also face hat Expert, ther
‘nanautorty,takespreedence nan High elle Organisation (HRO}, When
Condivens ae highick and cumstances change pi, onthe rund,
subject mater exerts are exert or wien situations
response. HAO o not ignore any flue rather they adress any level of
techn, human or process flue immetitey and complete In today's
ontet Regltors mst therefore essentally hve domain pets who have
‘he aity to not only aalze the techn problems bt so undetand
umanbehavourto,
ands perhaps 0 nest sutedforthepuposeLettherebeadebate,
Wirak DutaShri Dharmendra Pradhan, Hon'ble MoS (I/C),
MoP&NG presents “Oil Industry Safety Awards”
[Ata simple function held on 4" August 2025 at SCOPE
‘Auditorium, SCOPE Complex, New Delhi, Shri
Dharmendra Pradhan, Hon'ble Minister of State
(Independent charge, PRNG. In the ocesence of She K.
D. THipathi, Secretary PANG, Shri Sandeep Poundri,
Joint Secretary (Refineries), MoP&ING, and Shri Hira
Dutta, Executive Director, OISD, presented the “Oil
Industry Safety Awards" forthe year 2013-14 to allthe
award winning entities.
To encourage outstanding safety performance of the
Industry and to Inculeate positive culture of
competitiveness among the industry members, the
iM
owle Ma (Vl aderessing the gathering
‘st SCOPE Convention Cente
Ministry of Petroleum and Natural Gas introduced @
system of Ol Industry Safety Awards in the year 1987
‘These awards are presented to those organizations
which achieved ‘Exceptional safety Performance’
‘The evaluation criteria for the coveted il Industry
Safety Awards are quite stringent viz. complexity of
‘operations, accident free man-hours worked, volumeof
the products handled, direct & indirect lass due to any
Incident, hazard potential of the complex, na major
incident during the peiodet,
‘The award ceremony began by paying homage to
Dr API. Abdul Kalam, former President of India, who
believed inthe Freedom of mind and the Expansion of
the Intellectual space and whose vision was to make
India a knowledge power in the world. During the
‘ceremony, a compendium on Analysisof Incidents nthe
Industry for the period 2004-15 and another
compendium on ‘Check Lists of Safety Audits! were
released by Hon'tle Minister,
Addressing a vast gathering of more than 350 Oil
Industry executives comprising Captains ofthe Industry,
Senior Executives, Retired senior executives,
Media representatives, Shri Dharmendra
Pradhan, congratulated the ‘Award Winners’ and
Underlined the need for preservation and protection of
thevitalOil&.Gasinstallationsin the country.
Ughting of coemonia lamp by Howe Mas (Ve)
Shri Pradhan urged the Oi & Gas Organizations tostrive
towards achieving the ultimate objective of ‘
Incidents’ across the Industry. He went on to add that
‘our prime objective must be to create a safe work
‘environment in she Oi and Gas industry with an
underiying, commitment to creating an incident and
Injury-ree work environment in the entire Ol & Gas
Industry nindia,
While underlining the Importance of proactive
‘measures in preventing any incidentinthe Industry, Shi
Pradhan articulated that Industry must lay more
emphasis on self-regulatory measures for
strengthening safty in the entire Oll & Gas Industry
segments, The companies must strengthen its internal
‘audit mechanisms and promptly liquidate the
weaknesses,
0 — ————————————BD ontingusury sate
Raleare of Compendum on Anas of
aor inelderts by Horble Mes
(On the issue of fragmentation in monitoring &
implementation of safety aspects of Hydrocarbon
Sector, Hon'ble Minister opined the need for having an
umbrella organization looking after the vital Safety
aspects of Oll&. Gas Industry. Hefurther mentioned that
(18D has the necessary wherewithal to effectively
monitor the process safety issues in highly hazardous
and flammable petroleum industry.
Shri Pradhan, inhi address, went onto add that during
histenure he has visited various 08 Gas Insallatonsin
the country and has observed that industry has taken ot
Hon'ble Mos (/c) Presenting Best Safety Performance
"Award in Refinery category to Essar oil Limited
of initiatives for enhancing of safety of their assets
However, the Minster mentioned that we cannot afford
to be complacent since safety is @ continuous process
‘and we must remain vigilant 24X7. He went on to add
that we must aim for establishment of world cass
Standard Operating Procedures at our Oil & Gas
Installations and mus strive for making this Industry as
2 "Total safety, Securityand Hazard Free’ Industry
Hon'ble Mos] Presenting salty Aor in POL
category to HPC.
Hon'ble Minister, made special mention on the twovery
Important compendiums va. ‘Analysis of Incidents for
the Period 2008-15' and ‘Safety Audit Checklist’ which
were released on the occasion. He complimented OISD
for taking such an excallontintitive and hoped that the
compendiums would be used by Industry members for
achieving excellencenet onlin safety butin other areas
of operations. He urged Executive Director OISD to
continue to take more suchiitiatvesin the future.
Shri K. 0. Tripathi, Secretary, PENG, articulating the
need toachieve excellence in Operations underlined the
reed for adequate checks and balances in the sytem
Hon'ble Mos (I/C) Presenting Safety Award
In category towmam QPEL
Which ensures effective safety systems are wel
implemented in the Oil & Gas Industry establishments
Further, Iti also important to track effectiveness of
these ystems, headded. Hewenton toadd that the Key
area which requires constant focus by every
‘organization is developing ‘Safety Competences! as a
partof core competency.
0 _ —_————————Complimenting OISD for coming out with the
‘compendium on “Analys of Major incidents in Oil &
Gas industry” for the pas: 10 years enunciating the root
‘cause of failures and learnings thereot, Shri Tripathi
mentioned that this booklet would provide a great
learningopportunitytothe entire Industry.
Shri Sandeep Poundrik, Joint Secretory (Refineries)
hile exoressing satisfaction over the compliance of the
majority ofthe MB al Committee recommendations by
the Industry, urged the Industry to expetite the
implementation ofthe pending recommendations in a
{for enhancing
Line bout manne Heabu stressed
the safety in our Oil & Gas Installations the key area
requiring more focus isthe training of our workforce
Inludingthe training ofcontractpersonnel
one Mas (/c)Preseting Consistent Safety Award
In RefieryCatagory to BGR
Earlier, while welcoming the lgitares, Shet Hirak
Dutta, Executive Directr, O1SD mentioned that the
numbers of incidents in the Oil & Gas Industry show a
downward trend since 2011 whichis afist step towards
‘achieving our ultimate objective of ‘Nl Incident” across
the Industry segments. He went on to add that today
there is considerable improvement in process safety
awareness level across the Industry, Wi
‘complementing the Industry leaders for ther proactive
approach for various PSM implementation measures in
the Industry, he wished that the day is not far when we
‘an take pride in making this Industryas one of the best
and safest inthe world, Continuing on the subject, Shri
Hirak Dutta went on to add that regular reviews ofthe
(150 ausit recommendations andthe pending poinsin
Board Meetings of the respective Oll & Gas
Organizations have sent a strong signal down the ine ~
focushas sifted more towards tinely implementation.
Scsiv eviaw meetings have helped in liquidation of the:
ending external safety audit recommendations in a
‘ime bound manner.
However, Mr. Dutta mentioned that we should not
become complacent and have to remain alert and
Vigilant 24X7. We must have zero tolerance towards al
kinds of unsafe acts and must always respect the SOPs,
adhere to work permit system, carry out proper
maintenance of equipment and ensure adherence to.
PEs,
In all28 numbers of awards were presented fr theyear
2013-14 of which 07 awards were given to Individuals
‘and 21 to the Organizations. Individual Safety Awards
were given to those employees who made exemplary
contribution towards the cause of safety in preventing
Unsafe situation at their respective work places which
‘otherwise could haveresultedina majorineident. inthe
“Organization Category", the organizations
demonstrating superior Process Safety performances
were conferredwith the awards,
Hon'ble Mas (Presenting Sfety Awardin nau,
‘Category 0 Sr Narsimby Dae, PCL
Sh DK Adhika, irector (MO), 0150 proposed the vote of
thanks
meeeAR eo Bae nec Tim els (olate
‘Execute Director, Oi Industry Safety Decorate
-Achemical engineering graduate (rom ladapur Univesity ShriHirak uttahasover3 decodes
of rch and varied experience in Operations, Process design andenginering, trouble shooting,
Safety management, Project Management, Human Resource Management varlous Refineries,
ARefineryHeadquartersand Corporat office
It was in October, 2008, when the disaster hit the town of,
Jaipur A devastating fie a theo terminal klled 11 people,
injuredmany others andresutedina whooping property loss
af € 300 crores. The ene terminal was on fire, and took
Several days forthe vant fire Fighters including companys
in-house employeestoxtingush te re ensuring minimum
damage of public property ouside the boundary of the
‘terminal which eleatedinathickypopulatedarea,
‘Thelalpurinedent
“Thecomitteesettp for investigation dented a numberof
‘Shortcomings indesign, operation & maintenance practices
te was observed that the incident took place due to
continuing operations with impaired safety critical
instrumentation, rot folowing the standard operating
procedure, use of obsolete equipment coupled with
improper maintenance, poor safety culture ete. The eric!
‘aco of the catastrophic incident were los of primary &
Secondary containment, Inadequate migaion measures,
Shortcomings In design & engineering specifications of
‘equipment et. The photograph below shows the tanks on
Fire ataipur instalation
‘The hammer blind on the product line extank which was
than used fr the purpose of positive isolation needed to be
reversed for transfer of preduct through pipelines. Ths
operation of reversing hammer bind, which has 2 large
bonnet res resulted in considerable spilage of high oa
‘motor spit. The MS tank body valve which could have been
closed fromthe controlreomtostop the spllagecouldnetbe
closed since the instrument cable was cut. The
Instrumentation cable wae found impaired; impaired for
Ssubstantalperodot time
Investigation Committee Recommendations |
‘he committee made several recommendations (133) to
prevent future catastrophic incidents. Recommendatons
‘ere broadly dive in two bros areas (a uading the
hardware (b)inpoving the sate ives, As pen downthis
Artcle, more thn 96% ofthe recommendations have been
implemented and balance are under advance stage: of|
implementation
‘A. Improvemeatsin oftware Areas:
Focusonknowledge Updtion taining
‘The emphasis toimprove the sls ofthe working personnel
vas accorded ighest pron. twasmade mandatory tht
employees must undergo refresher training on slety
Including Ive fice taining. Spedal training sessions with
‘modified progam design and caretull selected facut were
‘organized at sl i installations to accomplish this tsk
Further, ini & ea installations where large numbers of
contract workers are involved unless mandatory traning on
Safety and hands-on Fretghtingrlnings are provide, trey
were debarec from entering the ol installations. hitally
assistance of expert agencies was taken to provide le fire
trainings. Subsequently in house facies for imparting live
firosimulation raining were developed.
Special training sessions were conducted at all the
Instaltions te elscuss in threadbare the hey features of
standard operating procedures (50P) with he operating staff
8 fist line supervisors, The nitty-grities of operations
Incuding key operating parameters were defberate with
the operating crew and all necessary clafieations were
provided. The SOPs are prominently displayed at all work
Stations forthe operators" to catry cut safe and smcoth
operation
Besides, traning sessions were aso organized in vorbus
(OBMareasforspdating Knowledge.
0—<<§ 8 # Lh
“Mock ditsto enhance preparedness
‘Conducting mock dis on multiple & diverse scenarios at
‘regular intervals have been put ito place, These mack dis
fare conducted at regular intervals at al sites. Criquing ke
one by pre-appointed experienced “Obserers”apropor
‘each mack dil and feedback provided tothe cancemed for
imorovement. All mock drill are flower yp with de
being sessions. The onsite and afte mac ils helped
to ensure thatthe personnel are wellequipped to handle
emergency situations.
Documenting neat-missincdents
Capturing near-miss incidents and leering om the near
misses also improved thelearnng process. Documenting the
near-miss incidents and sharing te learnings with Operating
‘crew are being regulary practice, Further near misses are
lasfed into two categories vi high potenti nea misses
and normal ones. Special incentive schemes have been
Gesignedtoencouragereportingofneat mise,
“Managementofchange process
Special importance Is lid to the management of change
Process. No changes either in operating parameters or
process changes ae alowed unless backed oy the process
Of MOC. Further safety nteriocks must not be ept in bypass
mode; to this effect strict instruction for adherence have
been passed tall the installations. In case, is necessary to
undertake maintenance work for some contol valves /
Instruments wherein interiock need tobe bypassed, can be
Gone only with the prior approval of the plant mange
Special reistrarshavebeenputintousetologtiese events
Revising the operating manvals at perce intervals,
Updating the PI diagrams have been put intopace. Pocket
‘manuals detaing the salient operating parameters & brief
Steps in sartup and shut down ete. were prepared and
distributed ttre operatingpersonne!,
‘Strengthening Safety Function
Inttves were taken to pofesionalze the safety cadres
‘Te reporting of Head of Satetyhas been made Sect tothe
senior most executive (the CEO} of the Company. Further,
uring every Board Meeting, Head of Safety was altted
specific time to share the safety Issues and concems and
action plan to mitigate the same. The outcome of such
Aelberaions resuted in deployment of designated safety
‘officersn marketing terminals and mandatory safety audio!
‘theinstalatlons by seniorlevel executives.
Bridging communication gaps
{Gapsin communication were noted particulary during shift
change overs. Besides Jaipur at some other locations,
Incidents took place ring shit change ove. To ensure
proper handing over and taking over during SAR changes,
has been made mandatory to sign the log took by both
Incoming & outgoing employe, and are monitored regulary
by plant managers. Further exchange of ideas and
‘discussions on trouble shooting, reabity aspects of the
plant between working love! personnel & supenisors were
‘encouraged
‘These changes have improved the Operation & Maintenance:
practices inthe erminalsof Oi& Gasinstalation
8. Hardware improvements:
While upgrading the software aspects focused on improving.
thesofter dls procedualissvesbutitwasnotsufiient to.
achive the desired result Technological obsolescence nthe.
terminals as a matter of concern. Most ofthe terminals
operated inmanual mode of opeationlikephysaldiptaking.
of tanks, manual loading of tank trucks, and manual
‘operation of valves coupled with inadequate fe-fighting
infrastructure, ete. At most of terminals, Digtal Control
‘System (063) or Programmable Logie Control PLC) based
system were not available. A numberof recommendations
were thus made to modernize the terminals, addition of
state-of-theart equipment & firefighting facilites,
Incorporate addtional layers of protection ef. These
changes were slmed at reducing. human Interventions
“Marketing terminals now ae alin auto-made cf operation
with DCStusedcontrolsytem.
Replacement ofobsolete equipment withnewtechnology
‘The hammer blinds on all the product lines have bean
lspensed wit and replaced with double block snd bleeder
‘valves. Therisk associated while reversing the hanmer blind
uring every product transfer operation Is now nulilied
Providing COBY as replacement of hammer Blind ssured no
spillage. Te large bonnet area of the hammer blind which
was potential source of produc sil during ts phyla
reversalistiusdone away with,
The motor operated tank body valves were replaced with
Remote Operated shutoff valves (ROSOV}. The special
feature ofthe fl-sae ROSOV incudes quick closing ofthe
‘valve to avoid loss of containment during recelptof product
“rom ships pipelines, railway wagans ee
Fighting of acetal spillwas another areacf concer. To
‘ight the pcol re, medium expansion fam geneators have
‘been provided in every Class-A tan fem area. MEFG is a9
‘effective tol to prevent vapour formation of acidental il
spilt also ensues quick blanksting of of al fire and
—_— ————————prevents propagation ofpool fe,
Silay, hydrocarbon detectors have been provided ata
Class-A tank dykes, pump houses, OWS drains to detect
leakage of hydrocarbons. Earydetecon'stheke to prevent
untoward incident In petroleum industry. CCTV cameras
were also instaled at strategie locations Ise the terminal
tokeepaciose watchonperformance of equipment andtank
farmareas
‘Upgrading Firefighting equipment
Prior to the Jaipur incident, the terminals had at thele
sposal 148 m3/hw fed water and watercum foam
‘monitors to fight fire. The fie incident a ipur exposed this
weakness and freighter faced serous constrain. At all
terminals now, remote operated variable high volume long
range water eum foam monitors with capacity of 500-2000,
talons per minute has been installed. In addition, trolley
mounted HVLRs have been procured to fight emergency
‘All terminals with product storage capacity of more than
30,000 H upgraded its treater networe and Firewater
ums tomatchtherequirements of double fre contingency
[Adtonal re water tanks have been constructed the FW
lines were changes and new higher capacity FW pumps
installed The entire hydrant network has been kept on
AUTO-mose Le. sequential start of fie engines on demand.
‘These changes have enhanced the firefighting capabilities to
alorgeestent,
‘lm salfire protectionsystem
Published Heratres on floating roof tank fie inicte
‘majority ofthe tank fie took place at rm sea area ofthe
ferteral floating raf tanks carrying Case petroleum
products. Tocircumvent this, automatic linearheat detection
and fre suppression rim sel fre protection system have
been incorporated for al lass tans. The detection system
‘based onthe temperature rise actuatesthe solenoid vale of
the foam tankmourted an thetankroof which automatilly
sprays AFF foamto the affected ares thus extinguishing the
I any, atthe nascent state itself. Understandably, the
Inventory of class external foatingroofanksinthe county
being large & working in an operating tank Is 380 risky
equiting close supervision, the Jobin totaly s expected to
bbe completed by end-2015. As on dat, almost seventy
percentofleatingroof tanks are equipped with im Seal Fire
Protectionsytem
Terminal automation
The loading of products which was earer done manually
havebeen made automaticthrough use of PD meters and its
integration with SAP. Thus taking physical dip of the tanks
tank trucks have been alspensed with. Asa result, no oly
safety records have improved but product losses have ako
‘comedown substantial,
To avoid oss of containment, each tank hasbeen provided
with two separate radar gauges for level measurement &
‘monitoring. An independent level switch with hi-i evel
alarm upon its activation wil close the tank body valve the
ROSO\,Thiswasmade to ensureno silage of products trom
the tanks. It isan overfil protection device forthe tank,
However, thisjb in totality since the quanta of tanks aretoo
large) isexpectedtobecompleted by end 2015,
‘One more significant safety feature which has been
Integrate tothe instalation for managing any emergency
stuation isthe Emergency Shutdown (E50) Sytem, The
Philosophy of 0 isto completely atle-up the operation in
‘case of fre or exigent situation, Pressing the ESD burton wil
automatically actuate the ROSOV and close the tank body
‘valve to avoid tankoverfow; stop the loading operatonin TT
‘or TW leading bays in the event offre by stopping the
product pumps. would alo activate power shutdown after
process shutdown except emergency requirements, and
other cial ightings ofthe instalation
To acquaint the operating personnel with the operation of
[OCS/PLC and updated equipment special tralning sessions
were aranged by the ol & gas companies. The logic of
Instrumentation and working of PLC were explained tothe
satiactonofthe crew
Focuson Process Safty Management:
‘The other important change which have noticed is focus on
Process Safety Management, | have been constantly
emphasizing this at several for. PSM must lobally et the
same attention accorded to HSE is eat spot dtets
fon site walk-out but understanding process safety sues
require indepth technical knowledge, analytical ski and
‘even unaerstanding of human Behawour I ike ance bere
where only the tp & wsible wile ninety percent 1
underneath, Similar is the case with process safety
‘management.
Leadership challenges:
Leaders are the kay drivers for bringing in change in the
coxganizatio. Thus leadership commitment and ts viibity
ae extremely vital. Leaders must have adequate knowledge
‘experience of process; understand the associted rks of
handling hazardous petroleum products and the behavioral
Issues. They must be wing to st with the peers and
subordinates to improve thelr understanding if ale for
Suchopendscussonshelpinimprovingthe workcultureand
thereby safety. However this is elif task but slowly but
surely this metaphorisbecoming visible
—_ ——— ———‘Comparison of facilities : Post Jaipur Fire incident
Features Presaipur Post Jaipur
Year of Constuction, 1936-57 Pipeline feed terminal) _ | 2015 (Pipeline feed terninal).
‘Mode of Operation. [Semi Automatie Fully automated Ol terminal
Positve Isolation facility,
Hammer blind valve used for
positive toation,
Replaced with Double Hock and
bleed valve for positve tolaton
eliminatng the chances of product
spl.
Fist Tank body valve
‘Motor operated valve (WOV) with
local fremote operation = was
impaired,
Replaced with Remote operated
shutof valve (ROSOV). Remote
‘operation both from Cantrol room
B outside of dyke area
Tank overfil protection system.
“Mechanical gauge with local display
Two radar gauges and one tmit
itch foreach tank
EFR tanks
Features of ROSOV operation. [Ni ‘With activation of imitawite, anke
receipt ROSOV closes astomaticlly
‘with alarm at Contrlreom, Fall
safe operation,
Rim Seal Fire protection system for | Ni ‘All Class A tanks are FR type, thus
Rim seal fie potectionsystem are
not required
Firefighting fait.
4 Hes. fefighting for single major
scenario.
Upgraded to 4 Hrs, simultaneous
firefighting for two majr scenarios,
Tigh volume long renge monitor
(evr),
cum foam monitars of 144 KL/ae
eapacity
capacity 2000 GPM forall Class-A
tanks.
Centralized Yoam system,
Mainly foam drums deployed at
sive.
Foam tanks and replenishment
from centralized system.
Spill protection in dyke area
[Handheld foam monitors
Fixed type Medium Expansion
Foam Generator (MEFG) for Class-A
oye
Spill Detection deve, iN Hydrocarbon detectors at Gass A
tank manifold, pump house etc
with audio / visual alarm indicaton
in control room,
Shutdown system. Manual and equipment speatic. | PUCbased total shutdown with
feature of process shutdown and
power shutdown.
Deployment of Designated safety
officer
Deployment of designated safety
officers.
Conclusion
The concerted efforts ofthe Oi & Gas companies forte st 5 years ructifidin some notable postive outcomes Improved
awareness on process safety focuson plementation ss ilation of standard operating procedures, mintainngbeth system
{set dscpine. Automation of terminals hasreducedhuman intervention thusless chances of eror beter records. incest
{03 yeersnumbersofincidentshevenisocome down The chalongesnowforthe olleompaniesaetomeintsintne eset propery
and ensuring they aren working condition athe ine. There's no room a complacency ensure smooth &relabieeperations
Invital petroleum sector Leaders have to constanty watch out for signals whether complacency creeping in the organization
and take mmedite corrective measures through processof employee engagement
Safety's 24X7jobfor everyone.
0 $———————————‘External Safety Audits (ESA)
> wou
+ POLTerminal Sigur during May 14-36,2015.
+ LPG Botting Pant, Jemshedpur during May 25:27,
2015,
+ POL Terminal Paradip during une 46,201.
+ LPG BottingPlant, Amer during une22-2, 2015,
> Hee.
+ POL Terminal, Shatinds, Punjab during Nay 21-23,
201s,
> apc.
+ LPG Botting Plant, Tkara, UP. during Nay 28-30,
2018,
+ POL Depot, Barked, Nagpur during Nay 25-27,
2015,
+ POLDepot at anki U.P ding une 25-17, 2015,
> onac
+ Armada String! Mumba High Ofshore on Apri 0,
+0 installations at Anklshwar curing April 27—
Mayo, 2015.
+ wa Offthore Oriling Rigs ABANGIN 81S Fortune,
‘Mumbai uring ay5-, 201.
+ TwoOfshore Dring Rigs (Virus and Valant Oiler)
during une 67,2085.
> HMEL- Guru Govind Refinery
+ Y'€sAofBhatind Refinery during ne 2225, 2015,
> Reliance Jamnagar Refinery
+ OTARefiney maga durngsune 12,2018,
Cross Country Pipelines
ioc.
‘+ 124: long, 28°00 x0.281"Wal Thickness Crude Ol
pipeline section, at Rewari under SMPL debottle
necking project on May23,2015.
> ara.
+ Mumba-Manmad 18” la (250K) Produc Pipeline
during May 13.15,2015.
+ Mundra:Awa Section (541Km) of Mundra‘Delhi
Product Pipeline during May 25-26, 2015.
> oan
‘+ Jamnagar-Aimer Section of Jamnagar-Loni LPG
Pipeline durngsune 2015,
re-commissioning Audit PCSA)
> toc.
"L8G Botting Plant, Dimapur, Nagaland on Api 10,
+ Addtiona Storage Tank, POLTerminalatChitogath,
ARajasthanon Ape!28, 2015.
+ POLTerminak 8, Haiaon MayS, 2015.
‘POL Terminal Jaipur, Rajasthan durng May 29:20,
+ TuFGantryand Pump House, Paraipcnsune6, 2015.
‘+ POLDepotat Sankar Tamilnadu on June 12, 2015.
+ POLDepot, Mysoreon une22, 2035.
> arc.
+ Mounded storage vessel of LPG Betting Plant at
Rajot, Gujaraton Aprl25, 2015.
‘+ POL Terminal 1obner, Rajasthan on My 30,2015,
> wpe
+ wowing Fane at Mangalore Loading Import
Facliieson Apri, 2015,
+ PSmofCCRUat VisathReineryon Ap23,2015
+ POL Depot, Bharatpur, Rajasthan during May 35-16,
215.
+ DHS revamped wn, Mumbai during ne 12-12,
2015,
‘+ POL ‘Terminal, Palanpur, Gujarat for additonal
tankage on tune 27,2015
> oan
"+ Condensate Handling Faclitis at Gandhar plant on
May22, 2015,
‘Surprise Safety Checks
> onec
‘+ FGM Oring Rig at Mumbal High Offshore on Apri
10,2015.
‘+ Four work over Rigs and one Dring Rig
Asset during May 24-15, 2015,
> Wee.
+ LPG Botting Plant, Bahadurgarh during May 1-02,
2015,
Mehsana
Special Safety Audits
1 setty nes of OGL, BC, PCL BLFends Terminal -03
jetties atKandlaPortduringMay7-8,2015, |
“+ ATFfacitis of ONGCHaxraPlanton May 15,2015.
0 _ ——— ———————Inspection of Cl Spill Response facilities
*+ Special audit of Oi Spill Response and Fie Fighting
‘apabllis of malor Pots undertaken as perrequest
of Ministry of shippingas under
‘+ Mumba or Trust
+ AN Port Trust
‘+ Visakhapatnam Port Trust
Consents accorded to Operate
> once
‘+ Ofshore Jak up Driling Rig “Paragon M 1361" on
‘pi, 2015.
+ Offshore Jack up Oring Rig “ABAW:
201s,
+ Ofshore ack up Dring Rig “DS FOSSIL’ on Apr 10,
2n1s.
+ Ofshore “New Fad Process Platform HRO" of
Neelam & Herr Asset on April26, 2015
‘+17 Nos. wehead platformstA,5, LO, LE,N3,N4,
NNZA, N6, NB, NIO, N12, NO, NE, NEA, NH, NHA.
assoated with NO process complex of MH Asset
issuedon May, 2015.
+ Operation of WI, W-4 & WES wellhead platform
{Total 3 ns, assoeated with Win process complexof
Mitaseetisevedon lunes, 2015,
‘+ welhead platforms eK IM £0, S-7, 51-4,
SUS, S16, SW {Total 12 Nos) associated with SH
processcomplexof MH Aset on June 20,2015,
+ Operation of wellhead platforms NI, NS, NS, N11,
ASS, NM & W6 (Total 07 Nos associated with MN,
processcomplexof Ml Asetinwuedon lune 25,2015.
+ Operation of welbea pators 81, 18,10, SM, SR,
ST, R52, ASB, RSI, ZA, 2 & SD (Total 13
Nos. jassociated with IC processcomplex of MH Asst
issvedon une 25,2015.
‘+ "1B Wellhead Pltform” PMT ont Venture on Apri
20,2015,
"on Api 7,
Meetings
‘+ €D-0150 attended the standing Commitee meeting:
fon Petroleum & Natural Gis - Examination of
‘Demands for Grant for the yest 2015-16-09 Apr 9,
201 atParlamentHouse Anneie.
‘+ 0150 representative participated inthe 20” National:
(Ot spi Osaster Contingency Plan & preparedness.
(wos0cP}meetingat Goan Api9, 2015.
‘+ Meetingon review of implemertationstatuson O1SD-
16nd M@ Lal Committe recemmendation a Ura,
(ONGCon April, 2015.
‘+ Review meeting on pending ESA recommendations
with Ol Industries and Gas Processing Companies on
‘apa20-25,205,
“+ Meeting on Preoarednes,Resoonse & Co-operation
te Polltion Incdents on May 1, 2015 a Ministry of
Shipping New De
‘+ Meeting on “Site Restoration after Cessation of
(Operation*held at OGH,NOIDA on May, 2015,
‘+ Meeting with CCOE, PESO & other stakeholders on
Inclusion of O10 standards in Petroleum Rules on
May20, 2015 at Nagpur.
+ Review meeting on status of ERDMP fr Private Ol
Companies (Ri, ESSAR, andNOCL) on May29, 2015 t
(01s0 offs, NOIDA
+ Meeting to review progress on implementation of
(018011168117 and Mal recommendations on lune
16, 2015 at MoPBNG-charedby SR.
+ Meeting between O80, OGH and Niko Resources td
fn “Site restoration & abandonment of offshore &
con-shore well” of Niko, Hazir lel at DGH, Nolda on
une 18,2015
‘Meeting with Private, 1V & Upstream Ol Companies
fon Disaster Management Plon on June 30, 2015 at
(180 offs, NOIDA
knowledge sharing by 0150 officals
'+ €D-0150, AO (PPLAU & 8KG) OSD spoke on Process
Safety & Asset integrity 2 AEME Conference held at
New Delhi on Api 18, 2015.
‘+ £D.0150, AD (PPLAU) & ADIALSKB) took sessions
on Process Safety & Ase neg issues at
onfecence on HSE organizesby Petrofed during
Ape 7-19, 2015,
‘+ ED-OIS took session on re of 0850 in
enhancing safety ina workshop organized by TER!
for Ethiopian delegates at nda Habitat Centre, New:
Dethi on April 23, 2015,
Functional Committee Meetings
> 6" Functional Committee Meeting of ISD GON-292
fon Guldelines for Safety Practices during
construction held on Apri 6, 2015 at OISD Noida
office
‘+6 Functional Committee Mesting of OSD GDN-207
‘on Guidelines for Contractor Safty held on Api 7,
2015 at OID Noid offi.
+ $* Functional Committee meeting of CISD RP-274 on
Well Control held on April 8, 2015 at OISD Noida
cee.
‘+ ¥ Functional Committee meeting on 010-5173
“Fire Protection Sytem for Electra nstaltions”
heldat OSD office, NOIDA on May 12,2015,
0 §— —“eer arom af 1 Par
pa a Rt
ove ae gern yaw Prema or Pte fe a
Shean Re a oe STS ST
WED CelebrationsatO1SD.
‘+ Werld Environment Day (WED) was celebrated on
June 5, 2015 at OSD ofce, Noida. The programme
‘commenced with envionment pledge in Hind! and
English, special lecture on “Conservation of
Environment” by Br. Ganwari Ll, Director (TER)
followee by release of 2 Sootlet on World
Environment Da.
‘+ Qu, Essay and Slogan competition In English and
Hind was organized to commemorate the WED.
protectenofervronment
‘Steering Committee Meeting t O1SD
+ 1" steering Committee Meeting was held at O1SD
“fice, NOIDA on June 26, 2015. The meeting was
"tended by SS senior executives ftom both PSU &
Frvate ol & gos companies. Besides adoption of 2
new Standards andreiionof7 other Standards, te
long pending ESA points, status of MB Lal Commitee
recommendations, status of Oil Spll Response
facies, Ault schedule forthe FY 2015-16 ard
inclusion of some OID Standards in Petroleum Rules
were delversted
‘Safety Award Evaluation Committee Meeting
"+ Safety Award Evaluation Committe, set up by
'MoP&NG,met on June 228.23, 2015to evaluate and
recommendthe winners of Oillndustey Safety Awards
for FY 2013-14, Howe MoS (UC) gave ancy the
Safety Awards on 4° August, 2015 at SCOPE
v PNG:
Convention Centeln the presence of Secreta
15-8, PNG andED-OVSD.
OISD Releases Compendium on
* Analysis of Major Incidents in Oil & Gas Industry 2004-2015’
|ACompendium on ‘Analysis of Major Incidents in Oil &
Cas Industry 2004-2015' forthe ol gas industry of nda
Patroleum and Natural Gas, Government of nda during
the recent“OilIndustry Safety Awards Ceremony’ held at
New Delhi.
released by the Hon'ble Union Minister of
‘This compendium on analysis of majorincidentsin theo
&gasindustry covers the major incidents data ofthe ast
‘even years of the entire ol & gas industry entailing the
root cause of the incidents and lessons learnt thereof.
‘2:0 depicts the detalled analysis of incidents of
Eeplortion & Production, Refineries & Gas Procesing,
Pants, Marketing, Pipelinesetc. covering theentre array
‘fhydrocarbon business ofthe country.
Its expected that this small step of O1SD with release of
‘this Compendium would enrich the knowledge of the
personnel and enable the industry to achieve the
Litimate objective of NI incidents inthis vital sector of
the countryCASE STUDY
MAJOR FIRE IN A MS PIPELINE AT A PORT LOCATION,
By SIS Rajesh Uprety& Hak Duta
‘A mechanical enginer tom 6.8.Pant University of Aarcltur & Technology with Post Graduate
‘iploma in business management trom i, onaniabed having about 2 years expeence in OS.
Gas industry. Spcia are of interests are Coating (TE/ 3 LPE/FBE/ Dual FBE)alltypes pipes (API
SL/ ASTM Grace/Is Gadel, valves andpe-itigs.Instumentalin introducing OFBE Coating nina
in the year 2008 Presented six papers in NACE conference and one paper in ASME corerence on
various opiesrelated to pipe and costing nation to ths also presented ater technical papersin
‘variousnatonalimernationalseminers organized} IOCL, Pevotedetc,
intRopucrion:
Iewaslate afternoon ona weekend when the news of big
fire from a ett pipeline area made people rush tothe ste
‘Theleakinthepipeine at thejety area was noted duringthe
morning while MS was being transfered from one of the
Fefinerytoitsmarketingterminal. The pumping was stopped
inthe mornngand preparatory work forrepalngthe ine.
flushing ofthe line was in progres. The firefighters put the
fire under control & finally extingished the same, though it
‘00k time to do so, sine the sled MS got med wth the
aterinthe creek & was carried ayo nearby areas during
thetde
‘OBSERVATIONS:
+The leakn the 14” OD tne caused substamalslage of
IMS; the spilled oil got moxed withthe water in the
Bajcent creek & spread to nearby areas due 19a
fect.
+ Gully sucker & other frefghtng acessories te, were
rmoblizedtorecoverthecifromthecreek,
+ Flushing of he associated lines was started to undertake
the repair of the line, After sometime when it wae
fobserved that the leakage of product Increased
substantially the using operation was stopped,
“+ Amajorfiretookplace at about 100M away om theleak
spot fr tenders were putinioservetofightthefire,
1+ Fire was put under contol but kept on re-ocurring
Imermitenty,
+ Finalythefrewasextingubhedatte eighthous
Health chack-up suchas ticknes survey ofthe subject
pipeline oho test ofthe pipeline was not reported to
havebeen carried outsincecommissoningoftheline
+ Proper meintenance of the pipeline was net undertakes;
no eulderce of preventive maintenance of the pipeline
‘wesfound
+ Cathodic rotection which s 2 usual practice to prevent
‘enteral corrosion was not provided la the subject
Pipeline etheundergroundsections.
+The thinnng ofthe pipeline, a5 may be seen from the
picture, indeates uniform external & internal covosion,
‘crssthelongtudinl section ofthe pipeline, was taking
lace for solongedpeiodaf tie,
+ Further, external coating. was not provided in the
underground pipeline which aggravated the extemal
+The pracice of flushing the ines with sea water is
detriment theheathofthepipeline
+ During ener incidences of leakages, the leak wes
rectfied by clamps and S-wraps, which are temporary
‘measures4 notagood engineering practice
+ Normaly cad crossings are provided wit casing ppes/
sleeves totake the adlional oad in theinstant cas the
same wast provised
+ The philesophy of replacement of pipe segment, 2s
wen required, without proper Maintenance &
Inspector cannot ensureintepityafthe pipeline.
ROOT CAUSE:
+The uniform paper ike thinning of the pipe indicates
‘orosion fra prolonged period of time. The corrosion in
the pipeline is attributed to both internal & external
‘orosion sot providing cathodic protection system
‘oupled wih no external coating on the ine made itwulnerable apsinst external environment. t may be
pertinent to rote that nearer tothe sea location indicate
thatthe So esstivty is low which enhances the rate of
oresion. Th internal orosin nthe ine i atibuted
to use of sale (ea) water as ashing media. Further in
absence of periodic planned Mal activity such as direct
Corrosion assessment tests (hydro tet, thickness
mressurerentetc} the extent of damage in theline could
note aszesedtitthesamefaled.
+ Since there was a external coating in the underground
pipeline iteasedsevereextermalcoresonertne pipe.
'SOURCEOF IGNITION
‘After the fare ofthe pipetine, the leaked product, MS got
mined with the wate te adjacent creek. Te was raining
heavily and due tote tfl effect MS got spread up and
flowed tonearby marerovesfeldwhichwas already flooded
with water It war regrted that a passer-by lighted abil
whieh provided he ntion.
RARNINGS:
= Regularheath &integityasseszmentofthe pipeline shall
be caried out by carving out thickness measurement of
the pines, hvikotestngete,
+ Maintenance schedule must be prepared for carrying out
regular maltenance of althe associated accesories he
‘ales including the maintenance actives Hike patil
Strokng, stem greasing, dain fishing, seat sealant
+ Proper paintngofabove ground pipes shale carried out
2 reular tervals; the saline envronment hastens up
the externa corrosion & appliation of sutabe paint
wouldredic exteralcorosion
+ Underground pipes shall be provided with suitable
fertermaleosing sue as2-ph/3 plycoldtae,PUcoating
High Buiiquideponyete
+ Sleeves shall be provided inal the road crossings ater
putting a corrosion resistant pint fr strergtening the
pipe. This would prevent yee losd onthe oie segment
‘whe vehiles pass over the crosings
+ Corrosion probes/ corrosion coupons shat be provided
far monitoring the ste of internal covrsion, Carrion
inhibitors may be used inthe pele, # the internal
eaceeds py.
+ Flushing of plpeine with sea water must be dispensed
with Inthe event line flushing is absolutly necessary,
Imust be done wth fresh water or iealy kept with
product isin the later ase, necessary acounting must
+ Considering, the fact that there was cuser of product
tanks near this piping, ick alysis shall cried out
for product transfer/teceipt nes and necessary remedial
measures maybe taken.
+ Periodic mock dil: must be conducted for efective
handling& preparednessofemergencr stations
Compendium on ‘Safety Audit Checklist’ released by OISD
‘An complation of 'afety Aud Cacti’ for the of & gas industry of nda was,
& ‘released bythe Hobe Union Ministero Petroleum an Natural Gas, Government
‘tina ding ecethy concluded Ol inure Sfety Awards Ceremony held at
New Deh
‘Safety Audit Chee” one of the Important tools in conducting external safety
audits effectively and ensures the consistency and completeness in carrying out the
r {asks The compilation of Safety Aust Checklist covers the whole gamut of operation
Comprising external safety audt checklists for Refineries & Gas Processing Plants,
Exploration & Production, Marketing, Pipelines and Construction Management ao
It is expected that thi smal step by O80 with release ofthis Compendium wil
‘address the gapsbetween te heathof he assetsand potetalhazarésandseve as
country.
{ bufer for averting the technical and homan fares in this vil sector of the
————————‘a well during pulling out fishing string in work over operation
‘case study on ‘Uncontrolled flow of gas from.
‘By S/ShrlTarsem Singh & A. K.Jaln
[A mechanical engineer by profesion Shi Arvind Kurar Jin brings with him nearly two decades of
‘ich and varied experience in ding operations of both Offshore as wall as Onshore. Currey
‘workings Joint Director (ERP) nO1SD, Arvind Kumar ainloksafter the safety of ERP
[Brief Description:
Lower teste intervals of a well were solatedby placing
barre Le. Bridge plugat a depth of 1227 maters MO,
“Three upper perforated cones (2047 ~ 46, 2012 ~ 07,
1005 ~ 01 meters) were in open condition. The zone
(1027-46 meters) was having the potential for gas with
BHP 1650 psi, gas flow rate 980 cubic meter per hour
with 4 mmbeansitean SiTHP 109-111 Kg/Sq.arecm.
A retrievable mechanical packer was set at 971 meters
to liolate the upper open intervals for testing. The
‘mechanical packer could not be released aftertestingof
the intervals. The work over was being carried with an
‘objective to retrieve / fish out the stuck mechanical
packer fromthe well
{An attempt was made to fish out the stuck mechanical
packer with overshot, Only mandrel ofthe packer could
be fished withthe attempt by overshot (External catch
fishingtoo!). Packer portion wasleftinthe wel,
Second attempt was made with long Taper tap (internal
‘atch fishing tool) to engage and fish out the stuck
packer but fale.
Te wellwas subdued with 1.30 gram /ccbrine ana Kick
was observed twotimes during thefishing operation.
As the attempt to release the stuck packer was
unsuccessful, the taper tap was disengaged, well
circulated with 1.30 specific gravity brine and started
pulling outthe shin string.
‘The complete fishing string was pulled out except two,
singles of" round dil collars along withthe tapertap,
in the well. Flow of gas and brine started from the well
‘The crew made up a 2-7/8" drill pipe tothe dil collar
singles which were stil nthe well against the BOPs and
run nin the well. Installed FOSV & circulating head and
closed the2-7/8” ram BOP.
After observing the wellactvty for sometime, BOP was
‘opened. The well became active and well fluid pushed
‘one single of dil collar out ofthe hole, Both the 2-7/8
pipe ram and blind ram were closed against the drill
collar which was stil inthe hole against the BOPs. The
25 flow from the well became uncontrolled as the
secondary wellcontrosystem failed.
Analysis:
1. The gos well was subdued with 1.30 specific gravity
brine, which could not stabilize the well as itis very
difficult to maintain the specific gravity of brine.
Furthermore, gas migrates and expands with faster
rate inthe brine due to its low viseosty, low yield
0 —_———————point and practically nil gelation. The fest migration
‘coupled with exponential expansion of gas unloads
the wellatafasterrate, thus reducing the hydrostatic
head drastically. The gas wells should be subdued
\with mud fr prolonged work over operations.
2. When start ofthe gas & brine flow was observed
from the well, the shift crew made up a 2-7/8" dell
pipe to the drill collar singles which were stil in the
‘wel rani it inthe well installed FOSV & circulating
hhead and closed the 2-7/8" ram BOP. This was 2
‘wrong operation and wasted considerable time.
During the makeup of dil pipe single, running inthe
‘well and instalation of FOSV and circulating head,
the well was unloaded and gas flow became
sleniicantly high, instead of adding singe of dr
pine, Rl, instaling FOSV & circulating head, the
string of two drillcallars should have been pulled out
ofthe hole and blindram close.
3, ‘Shut in wel was not observed as perth lid down
procedures. Shut in Oril pipe pressure (SIOPP) and
casing pressure (SCP) were not recorded to monitor
the well. This was 2 serious violation of standard
procedures.
4, The BOP was opened without checking the well
concltion through the annulus valves.
5, Both the BOPs i.e. 2-7/8" pipe ram and Blin ram
were closed against the 4X" drill collar, thus
damaging both the pipe as wellaslindram.
6. There was no trip tank provided with the rig :0
monitor the well behavior during. pulling out
‘operations. The well was not properly monitored
during ts behavior during pulling ot operation.
‘Well capping:
1. Initial attempt was made to kill the well by ‘Dynamic
king method’. Four cementing units were mobilized
and connected othe annulus with the high pressure
2” chickson lines. Mud of 1.30 specific gravity (five
times of well volume) was prepared. This attempt
was unsuccessfulbecause mud could notbe supplied
to cementing units with the requited flow rato to
suction of cementingunits
2. 2-7/8" ram packer block was converted to 4X" ram
packer block by machining the cavity of front packer
of 2-7/8 pipe ram bloc in a local workshop. 1.90,
‘mud of volume equivalent to 5 times of well volume
was prepared, After mud preparation of suficient
‘quantity, the stuck dell collars were secured firmly
with wire ropes, working under the water umbrella
Bonnet ofthe upper Blind ram BOP was opened and
the bind ram packer was replaced with the
fabricated 4%" pipe ram packer, Bonnets ofthe BOP
closed and bonnet bolts tightened. The 4%" pipe
rams were closed and observed that it worked. It
stoppedthegasflow fromthe well-Thewellwasthen
bulldozed with 1.90 specie gravity mud and finally
subdued wth 130 specific gravityrmud
Recommendations:
1. Gas wells should be subdued with mud instead of
brine for workover operations.
2. Frequent mock trip drils to be conducted for
scenario “il colars agalnst rams” witwessed by
senior driling engineers to improve competency of
‘the rilingor work-overcrew.
3, BOP stack should be provided in line with the
requirements of API-Standard.53. Annular BOP
should preferably be provided in the BOP stack of
work-over operationsin gas wells
4 Rigs deployed for Work over operations of gas well
should be provided with “Trip tank system’ to
‘monitor the well during pulling out operations.
5. Before puling out the BHA, observe the well forth
time period equivalent to anticipated time req
tocompletelypulloutthe BHAplussafety marin
Ree ll eeewees worarst afifa grt Perot
coset aA) yeah aaa ara Rt 38 ih
anys 2h fea en gen Patera ME Po er |
‘deer gore wa A ue wae a A ee
ght ch gee ete age Aa ee et
Geta A ara Foon 2 wut er WPT TD
sake 8 A ger, eG, oF wee, eg
saat A Ses wee RA, tes Ge oe Rs, ET
Pree 8 softer a
en sie mr Aes iar ae 8 a sete ae
ar wee er 8 ae. Re (oe
Hag oR stared A ate A aNd Aieew, oS
em, Se tear, Metre Fae war) A eee
Fate (ea), sheer a ag. tee Pete Gre)
2, ase Pra ($M, FRY HN aT A
‘Bey wh watson fe
ves eieréta rarer af 9) we ea et
‘wen gee Pater or Per Sea
aca er (AFA, 9 we ToT AAA 8 Aes a
samt we 1 BR Fe Bes a on Pree Ae
Serre erry fe
Bek nose es
ane res cower
Stoo en ae fe
Bot eel me oe Ge tat eae Sh
Sete fot on gets an haces Tioga wot
soho he ton reve ST
Site sre ese yee
seetere sh tn free Ag ket
et vn ane ese sree
ree sy rash os ogee we
Tegweuan ie sae ent en |
veh ge nso geek yo 1 ae AS
arg arent oh Fe ger paras Wwe 2, Ue ef we EC eT
aah a os tbr ss
ara Pt eto sa rg ate fr
rare eer #1 aera ge een eae |
Sx.
sted ere WAAR se ea
‘lat wel geen ETE aT Tyee fn
vrs ea oro ae GES 9 WW oT
‘pucher on goccte wre saat wt 8 AO A ee
fer gE anit are @ ARQ sean oe Pe
‘aria ad ey ary & Re saat oe ey go Hah ed
caer RAC ers 8 a ese aes
‘xe mech ea 3h a by ra a ae ee
fatten a aaPae wert a ae Reem ee et
‘sehr eer sera a were rt One arash
ree Fete wen eee
Btn cine
bth
gems
Ml
rt waka rete ere) MR wt TER
‘ard or se wf aed BY
[Fra we tr er ger Pere abe 8 Re Fog
Stor A ww peeea arhtoe ame) aE ao FTA
Prd meta ura aor ote area eta AeA
‘eg ante ey ee we es aes a AT
fay51° Steering Committee Meeting of ISD.
“The 51 steering Comittee Meeting was held at 0108
Conference Hall on 26° une, 2015, The meeting was
attended by 54 senior level representatives of both the
Public and Private SectorsofOiland Gas Companies.
Welcoming the Steering Committee members Shr Hirk
Dutta, ED, OISD observed that while the numbers of
Incidents in the Oll and Gas industries for the past 3
-yearsindicate a deciningtrend, but the high percentage
of fatality of contractor workersis an area of concern. It
calls for taking appropriate steps to strengthen the
safety managemen; system including improving the
safety competency ofthe contract workers toarestthis
disturbing trend. £0, OISD expressed satisfaction over
the progress of implementation of M.S. Lal Comittee
recommendations and OISD Standards 116 & 117
recommendations -989% ofthe recommendations have
been complied withand balance 2% are under advance
stage of execution whichis expected tobe completed by
December, 2015, It was shared that two-wired based
rim seal fie detection and suppression system has
undergone succesful field trial at HPCL and BPCL
Terminals and can now be considered as Equivalent to
the extant Hollow Metalic Rim Seal Fire Protection
system,
[Analysis of major incidents in Oil and Gas Sector for the
Steering Commitee Meeting in progress
ey
last 3 years was shared with the group. Viostion of
Standard Operating Procedures, equipment failure, and
Improper maintenance and inspection including poor
supervision contributedto the incidents, ED, O1SD urged
‘that violation of SOPs need to be stopped forthwith so
astofurtherimprove safetyin the Oland Gas Sector.
meeting, the audit schedule of O1SD for FY
2105-16 was shared with the industry members. The
Steering Committee reviewed the status of long
pending ESA recommendations; industry members
vowed to make all out efforts to liquidate the same
expeditiously. During the meeting, two new O1SD
Standards vit. 180-238 & 239 were adoptet by the
Steering Committe. Besides revision & amendment of
ight 0150 standards were also adopted by the steering
Committee. These standards would be placed to Safety
Couneliforitsapproval
Steering Committee members aso reviewed th status
of Ol Spill Response faces. it was observed that at
‘many locations adequate OSR acities are not avilable.
ED, OISD emphasized that adequate quantity of OSR
‘equipment alongwith trained manpower mustbemade
available to combat Tier Oil Spill in the ports. The
Disaster Management Plan of Private Sector companies
were also reviewed during the meeting. twas informed
that as per OMP-2024 of MOPENG, OISD has been
designated as Nodal point for private sector companies.
(on a query, regarding statutory powers to OISD, ft was
shared that for establishment ofan umbrella body a bill
namely Petroleum and Natural Gas Safety Board has
been prepared and currently the proposal s under
consideration before Committee of Secretaries,
(On behalf of team O1SD, £D-O1S0 thanked themember
‘companies forthe canstant endeavor to improve safety
‘management system and unstinted cooperation.
———————~—World Environment Day Celebration at OISD
Every year 5" June is ceebrated as World Environment
ayWED) to stimulate anareness on environment and to
commit to protect the nature andthe Mother earth, Teme
for this year's WED was "Sustainable Consumption and
Production" and the slogan for 2015 wat “Seven Bion
Dreams. One Planet -Conssme with Care” aly isthe official
‘country to host WED 2015. Expo Milano 2015 is being
celebrated in lan, aly rom 1" May.2015 to 31" October,
2015 with the theme "Facing the Planet-Enery fo ite in
linewiththe WED theme.
Olt Industry Safety Olecorate lke all previous years
celebrated the World Environment Day att ofce at NOIDA
Several activities were planned to commemorate the
‘occasion. These Included aux competition, slogan and essay
writing, speclleturesesson biyeminent faculty ete.
The programme commenced with plage taking by OISDians
‘which was administered ty ED, OISD & Di, MO, OD in
Engh & Hindi respectively
‘OlSDians taking pledge on WED, 2015
Special lecture on “Pressvation and Conservation of
Environmentin Oil Fil” was delivered by eminent scentist
‘ BanwarLa Diector(TER).O& Lalspokeatlengthonsoié
waste management with particular reference to
‘management of oly sludge in refineries, Some ofthe atest
developments in bio-remedation of oly sludge were shared
byDetal
Speaking onthe occasion, A. Hirak Duta, £0 (O1SD) shred
‘the measures undertaken by oll industry to reduce the
‘carbon footprint. Global werming and its adverse impact is
a
ED-OISD addressing the gathering on WED
more pronounced toda and unless drastic ations ar taken
to reduce consumption of fuels, 2 deg C rise In global
temperature in near future is heviable. Therefore,
conservation measures in oll & gas industry organizations are
paramount, headed. Later abookleton Word Environment
ay wasreeasedby ED (0180) andr Banwaital
The qua competition on environment generated immense
Interest amongst the participants’ Quie master in his
Immaculate style condueted the competition and
appreciated the knowiedgeof OlSDineinvarous spheres of
‘environment management.
In slogan and essay wring event, 4 slogans and 11 essays
were submited by OSDians. Pie winners in each ofthe
categories were avrardeg mementos onthe cnclusionof the
programme. The programme concuced with vote of thanks
proposed by Shri Maitnjoy Gupta, Additional Director
Release of booklet on World Environment DayPHOTO GALLERY
We will be remembered only if we give to our younger generation
1 prosperous and safe India, resulting out of
‘economic prosperity coupled with ciilizational heritage
= Dr. APJ Abdul Kalam