TECHNICAL SANCTION FOR WORKS


Dated:12-06-2019
Work Name: Mahatma Gandhi NREGA Construction of 1730004022/WC/22012034467059 - stop
dam nirman jatanpur
Grama Panchayat : DOB
Block Panchayat : OBEDULLAHGANJ
The items and Provisions proposed in the estimate are realistic and basically required for
this work, prepared & submitted by the preparatory Officer are considered and verified. The items and
Provisions proposed in the estimate are in accordance with the relevant specification and Guidelines in
vogue. The tasks generated with respect to the items are relevant and suitable.This Estimate is technically
Sanctioned for Rs 1484751/-(Fourteen Lakh Eighty Four Thousand Seven Hundred and Fifty One
only), vide TSR No 1730004/2019-2020/10671/TS dated: 12-06-2019,
Labour Charges (Unskilled) : 207556.45
Materials : 1277194.55
Admin Lumpsum : 0.00
Number of man days : 1179.298
Technical sanction given by : Jeetendra Ahirwar(Assistant Engineer) OBEDULLAHGANJ.
-sd
Jeetendra Ahirwar