REALISASI BAHAN MASUK BAK

Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi
Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 BATU KARANG PONDASI M3 14 0


2 KERIKIL KARUNG 172 0
3 PASIR M3 17 0
4 SEMEN @40 kg Zak 150 0
5 PIPA 3" STAP 0 0
6 PIPA 2" STAP 0 0
7 PIPA 1/2" STAP 0 0
8 KAYU KLAS II 5/5 X 4 M3 0 0
9 KAYU KLAS II 5/7 X 4 M3 2 0
10 KAYU KLAS II 5/10 X 4 M3 0 0
11 KAYU KLAS II 2/25 X 4 M3 0 0
12 KAYU KLAS II 3/25 X 4 M3 3 0
13 TRIPLEKS 3 MM LEMBAR 0 0
14 TRIPLEKS 9 MM LEMBAR 0 0
15 BESI BETON DIA. 12" STAP 105 0
16 BESI BETON DIA. 10" STAP 85 0
17 BESI BETON DIA. 8" STAP 0 0
18 BESI BETON DIA. 6" STAP 0 0
19 KAWAT BETON ROL 1 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

20 PAKU 10 CM KARUNG 0 0
21 PAKU 7 CM KARUNG 0 0
22 PAKU 5 CM KARUNG 0 0
23 PAKU 2 CM KARUNG 0 0
24 PAKU ZENGK DOS 0 0
25 ZENGK LEMBAR 0 0
26 BENSIN LTR 0 0
27 SOLAR LTR 0 0
28 KABEL ROL 0 0
29 SKOP BH 6 0
30 LINGGIS BH 2 0
31 EMBER COR BH 12 0
32 GEROBAK ARGO Bh 2 0
33 PROFIL TENGK 1100 BH 0 0
34 SIRTU RET 0 0
35 TERPAL 2 X 4 Bh 1 0
36 SIRTU RET 16 0
37 TALI TUKANG Bh 5 0
38 SLANGK WATERPAS M 20 0
39 CANGKUL Bh 5 0
40 SARUNG TANGAN PSNG 12 0
Proyek : PEMB AIR BERSIH MOA
Lokasi : MALUKU BARAT DAYA
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 8 2 2 1 14
1 171 172
1 1 5 10 17
50 100 150
0
0
0
0
2 2
0
0
1 1 1 3
0
0
105 105
85 85
0
0
1 1
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
6 6
2 2
12 12
2 2
0
0
1 1
16 16
5 5
20 20
5 5
12 12
REALISASI BAHAN MASUK

Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi
Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 BATU KARANG PONDASI M3 14 14


2 KERIKIL KARUNG 222 172 50
3 PASIR M3 17 17
4 SEMEN @40 kg Zak 150 150
5 PIPA 3" STAP 0 0
6 PIPA 2" STAP 0 0
7 PIPA 1/2" STAP 0 0
8 KAYU KLAS II 5/5 X 4 M3 0 0
9 KAYU KLAS II 5/7 X 4 M3 2 2
10 KAYU KLAS II 5/10 X 4 M3 0 0
11 KAYU KLAS II 2/25 X 4 M3 0 0
12 KAYU KLAS II 3/25 X 4 M3 3 3
13 TRIPLEKS 3 MM LEMBAR 0 0
14 TRIPLEKS 9 MM LEMBAR 0 0
15 BESI BETON DIA. 12" STAP 105 105
16 BESI BETON DIA. 10" STAP 235 85 150
17 BESI BETON DIA. 8" STAP 20 0 20
18 BESI BETON DIA. 6" STAP 0 0
19 KAWAT BETON ROL 1 1
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

20 PAKU 10 CM KARUNG 0 0
21 PAKU 7 CM KARUNG 0 0
22 PAKU 5 CM KARUNG 0 0
23 PAKU 2 CM KARUNG 0 0
24 PAKU ZENGK DOS 0 0
25 ZENGK LEMBAR 0 0
26 BENSIN LTR 0 0
27 SOLAR LTR 0 0
28 KABEL ROL 0 0
29 SKOP BH 6 6
30 LINGGIS BH 2 2
31 EMBER COR BH 12 12
32 GEROBAK ARGO Bh 2 2
33 PROFIL TENGK 1100 BH 0 0
34 SIRTU RET 0 0
35 TERPAL 2 X 4 Bh 1 1
36 SIRTU RET 16 16
37 TALI TUKANG Bh 5 5
38 SLANGK WATERPAS M 20 20
39 CANGKUL Bh 5 5
40 SARUNG TANGAN PSNG 12 12
41 TERPAL 3 X 4 Bh 1 0 1
42 Bh 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

43 Bh 0 0
44 Bh 0 0
45 M' 0 0
46 Bh 0 0
47 Bh 0 0
48 M' 0 0
49 M' 0 0
50 M' 0 0
51 M' 0 0
52 Roll 0 0
53 Kg 0 0
54 Kg 0 0
55 Kg 0 0
56 Kg 0 0
57 Kg 0 0
58 Lembar 0 0
59 BH 0 0
60 BH 0 0
61 BH 0 0
62 BH 0 0
63 BH 0 0
64 Kg 0 0
65 M' 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

66 Bh 0 0
67 Bh 0 0
68 Bh 0 0
69 Bh 0 0
70 Bh 0 0
71 Stap 0 0
72 Stap 0 0
73 Bh 0 0
74 Bh 0 0
75 M 0 0
76 LITER 0 0
77 Krtn 0 0
78 BH 0 0
79 Ltr 0 0
80 BH 0 0
81 BH 0 0
82 BH 0 0
83 UNIT 0 0
84 BH 0 0
85 ROL 0 0
86 BH 0 0
87 BH 0 0
88 Ltr 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

89 0 0
90 0 0
91 0 0
92 0 0
93 0 0
94 0 0
95 0 0
96 0 0
97 0 0
98 0 0
99 0 0
100 0 0
101 0 0
102 0 0
103 0 0
104 0 0
105 0 0
106 0 0
107 0 0
108 0 0
109 0 0
110 0 0
111 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

112 0 0
113 0 0
114 0 0
115 0 0
116 0 0
117 0 0
118 0 0
119 0 0
120 0 0
121 0 0
122 0 0
123 0 0
124 0 0
125 0 0
126 0 0
127 0 0
128 0 0
129 0 0
130 0 0
131 0 0
132 0 0
133 0 0
134 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

135 0 0
136 0 0
137 0 0
138 0 0
139 0 0
140 0 0
141 0 0
142 0 0
143 0 0
144 0 0
145 0 0
146 0 0
147 0 0
148 0 0
149 0 0
150 0 0
151 0 0
152 0 0
153 0 0
154 0 0
155 0 0
156 0 0
157 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

158 0 0
159 0 0
160 0 0
161 0 0
162 0 0
163 0 0
164 0 0
165 0 0
166 0 0
167 0 0
168 0 0
169 0 0
170 0 0
171 0 0
172 0 0
173 0 0
174 0 0
175 0 0
176 0 0
177 0 0
178 0 0
179 0 0
180 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

181 0 0
182 0 0
183 0 0
184 0 0
185 0 0
186 0 0
187 0 0
188 0 0
189 0 0
190 0 0
191 0 0
192 0 0
193 0 0
194 0 0
195 0 0
196 0 0
197 0 0
198 0 0
199 0 0
200 0 0
201 0 0
202 0 0
203 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

204 0 0
205 0 0
206 0 0
207 0 0
208 0 0
209 0 0
210 0 0
211 0 0
212 0 0
213 0 0
214 0 0
215 0 0
216 0 0
217 0 0
218 0 0
219 0 0
220 0 0
221 0 0
222 0 0
223 0 0
224 0 0
225 0 0
226 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

227 0 0
228 0 0
229 0 0
230 0 0
231 0 0
232 0 0
233 0 0
234 0 0
235 0 0
236 0 0
237 0 0
238 0 0
239 0 0
240 0 0
241 0 0
242 0 0
243 0 0
244 0 0
245 0 0
246 0 0
247 0 0
248 0 0
249 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

250 0 0
251 0 0
252 0 0
253 0 0
254 0 0
255 0 0
256 0 0
257 0 0
258 0 0
259 0 0
260 0 0
261 0 0
262 0 0
263 0 0
264 0 0
265 0 0
266 0 0
267 0 0
268 0 0
269 0 0
270 0 0
271 0 0
272 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

273 0 0
274 0 0
275 0 0
276 0 0
277 0 0
278 0 0
279 0 0
280 0 0
281 0 0
282 0 0
283 0 0
284 0 0
285 0 0
286 0 0
287 0 0
288 0 0
289 0 0
290 0 0
291 0 0
292 0 0
293 0 0
294 0 0
295 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

296 0 0
297 0 0
298 0 0
299 0 0
300 0 0
301 0 0
302 0 0
303 0 0
304 0 0
305 0 0
306 0 0
307 0 0
308 0 0
309 0 0
310 0 0
311 0 0
312 0 0
313 0 0
314 0 0
315 0 0
316 0 0
317 0 0
318 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

319 0 0
320 0 0
321 0 0
322 0 0
323 0 0
324 0 0
325 0 0
326 0 0
327 0 0
328 0 0
329 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Proyek : PEMB AIR BERSIH MOA
Lokasi : MALUKU BARAT DAYA
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
50
0
0
0
0
0
0
0
0
0
0
0
0
0
150
20
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
REALISASI BAHAN MASUK PAGAR

Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi
Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 BATU KARANG PONDASI M3 5 0


2 KERIKIL KARUNG 109 0
3 PASIR M3 8 0
4 SEMEN @40 kg Zak 100 0
5 PIPA 3" STAP 0 0
6 PIPA 2" STAP 0 0
7 PIPA 1/2" STAP 0 0
8 KAYU KLAS II 5/5 X 4 M3 1 0
9 KAYU KLAS II 5/7 X 4 M3 2 0 2
10 KAYU KLAS II 5/10 X 4 M3 0 0
11 KAYU KLAS II 2/25 X 4 M3 0 0
12 KAYU KLAS II 3/25 X 4 M3 1 0
13 TRIPLEKS 3 MM LEMBAR 0 0
14 TRIPLEKS 9 MM LEMBAR 0 0
15 BESI BETON DIA. 12" STAP 0 0
115 BESI BETON DIA. 10" STAP 30 0
116 BESI BETON DIA. 8" STAP 50 0
117 BESI BETON DIA. 6" STAP 0 0
118 KAWAT BETON KG 10 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

119 PAKU 10 CM KARUNG 0 0


120 PAKU 7 CM KARUNG 0 0
121 PAKU 5 CM KARUNG 0 0
122 PAKU 2 CM KARUNG 0 0
123 PAKU ZENGK DOS 0 0
124 ZENGK LEMBAR 0 0
125 BENSIN Ltr 0 0
126 SOLAR Kg 0 0
127 KABEL ROL 0 0
128 SKOP BH 6 0
129 LINGGIS BH 0 0
130 EMBER COR BH 12 0
131 GEROBAK ARGO Bh 2 0
132 PROFIL TENGK 1100 BH 1 0
133 SIRTU Bh 0 0
134 TERPAL 2 X 4 Bh 0 0
135 SIRTU RET 40 0
136 BENANG TUKANG Bh 5 0
137 WATER MUR 1 1/2 Bh 1 0
138 ELBOW 1 1/2 Bh 1 0
139 LEM PIPA Bh 1 0
140 SOC DRAT LUAR Bh 1 0
141 BATU BATA Bh 1000 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

142 Bh 0 0
143 Bh 0 0
144 M' 0 0
145 Bh 0 0
146 Bh 0 0
147 M' 0 0
148 M' 0 0
149 M' 0 0
150 M' 0 0
151 Roll 0 0
152 Kg 0 0
153 Kg 0 0
154 Kg 0 0
155 Kg 0 0
156 Kg 0 0
157 Lembar 0 0
158 BH 0 0
159 BH 0 0
160 BH 0 0
161 BH 0 0
162 BH 0 0
163 Kg 0 0
164 M' 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

165 Bh 0 0
166 Bh 0 0
167 Bh 0 0
168 Bh 0 0
169 Bh 0 0
170 Stap 0 0
171 Stap 0 0
172 Bh 0 0
173 Bh 0 0
174 M 0 0
175 LITER 0 0
176 Krtn 0 0
177 BH 0 0
178 Ltr 0 0
179 BH 0 0
180 BH 0 0
181 BH 0 0
182 UNIT 0 0
183 BH 0 0
184 ROL 0 0
185 BH 0 0
186 BH 0 0
187 Ltr 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

188 0 0
189 0 0
190 0 0
191 0 0
192 0 0
193 0 0
194 0 0
195 0 0
196 0 0
197 0 0
198 0 0
199 0 0
200 0 0
201 0 0
202 0 0
203 0 0
204 0 0
205 0 0
206 0 0
207 0 0
208 0 0
209 0 0
210 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

211 0 0
212 0 0
213 0 0
214 0 0
215 0 0
216 0 0
217 0 0
218 0 0
219 0 0
220 0 0
221 0 0
222 0 0
223 0 0
224 0 0
225 0 0
226 0 0
227 0 0
228 0 0
229 0 0
230 0 0
231 0 0
232 0 0
233 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

234 0 0
235 0 0
236 0 0
237 0 0
238 0 0
239 0 0
240 0 0
241 0 0
242 0 0
243 0 0
244 0 0
245 0 0
246 0 0
247 0 0
248 0 0
249 0 0
250 0 0
251 0 0
252 0 0
253 0 0
254 0 0
255 0 0
256 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

257 0 0
258 0 0
259 0 0
260 0 0
261 0 0
262 0 0
263 0 0
264 0 0
265 0 0
266 0 0
267 0 0
268 0 0
269 0 0
270 0 0
271 0 0
272 0 0
273 0 0
274 0 0
275 0 0
276 0 0
277 0 0
278 0 0
279 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

280 0 0
281 0 0
282 0 0
283 0 0
284 0 0
285 0 0
286 0 0
287 0 0
288 0 0
289 0 0
290 0 0
291 0 0
292 0 0
293 0 0
294 0 0
295 0 0
296 0 0
297 0 0
298 0 0
299 0 0
300 0 0
301 0 0
302 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

303 0 0
304 0 0
305 0 0
306 0 0
307 0 0
308 0 0
309 0 0
310 0 0
311 0 0
312 0 0
313 0 0
314 0 0
315 0 0
316 0 0
317 0 0
318 0 0
319 0 0
320 0 0
321 0 0
322 0 0
323 0 0
324 0 0
325 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

326 0 0
327 0 0
328 0 0
329 0 0
330 0 0
331 0 0
332 0 0
333 0 0
334 0 0
335 0 0
336 0 0
337 0 0
338 0 0
339 0 0
340 0 0
341 0 0
342 0 0
343 0 0
344 0 0
345 0 0
346 0 0
347 0 0
348 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

349 0 0
350 0 0
351 0 0
352 0 0
353 0 0
354 0 0
355 0 0
356 0 0
357 0 0
358 0 0
359 0 0
360 0 0
361 0 0
362 0 0
363 0 0
364 0 0
365 0 0
366 0 0
367 0 0
368 0 0
369 0 0
370 0 0
371 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

372 0 0
373 0 0
374 0 0
375 0 0
376 0 0
377 0 0
378 0 0
379 0 0
380 0 0
381 0 0
382 0 0
383 0 0
384 0 0
385 0 0
386 0 0
387 0 0
388 0 0
389 0 0
390 0 0
391 0 0
392 0 0
393 0 0
394 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

395 0 0
396 0 0
397 0 0
398 0 0
399 0 0
400 0 0
401 0 0
402 0 0
403 0 0
404 0 0
405 0 0
406 0 0
407 0 0
408 0 0
409 0 0
410 0 0
411 0 0
412 0 0
413 0 0
414 0 0
415 0 0
416 0 0
417 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

418 0 0
419 0 0
420 0 0
421 0 0
422 0 0
423 0 0
424 0 0
425 0 0
426 0 0
427 0 0
428 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Proyek : PEMB AIR BERSIH MOA
Lokasi : MALUKU BARAT DAYA
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 4 5
109 109
3 5 8
50 50 100
0
0
0
1 1
2
0
0
1 1
0
0
0
30 30
50 50
0
10 10
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
6 6
0
12 12
2 2
1 1
0
0
40 40
5 5
1 1
1 1
1 1
1 1
1000 1000
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
REALISASI BAHAN MASUK PAGAR

Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi
Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 BATU KARANG PONDASI M3 5 5


2 KERIKIL KARUNG 109 109
3 PASIR M3 8 8
4 SEMEN @40 kg Zak 100 100
5 PIPA 3" STAP 0 0
6 PIPA 2" STAP 0 0
7 PIPA 1/2" STAP 0 0
8 KAYU KLAS II 5/5 X 4 M3 1 1
9 KAYU KLAS II 5/7 X 4 M3 2 2
10 KAYU KLAS II 5/10 X 4 M3 0 0
11 KAYU KLAS II 2/25 X 4 M3 0 0
12 KAYU KLAS II 3/25 X 4 M3 1 1
13 TRIPLEKS 3 MM LEMBAR 0 0
14 TRIPLEKS 9 MM LEMBAR 0 0
15 BESI BETON DIA. 12" STAP 0 0
16 BESI BETON DIA. 10" STAP 30 30
17 BESI BETON DIA. 8" STAP 50 50
18 BESI BETON DIA. 6" STAP 0 0
19 KAWAT BETON KG 10 10
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

20 PAKU 10 CM KARUNG 0 0
21 PAKU 7 CM KARUNG 0 0
22 PAKU 5 CM KARUNG 0 0
23 PAKU 2 CM KARUNG 0 0
24 PAKU ZENGK DOS 0 0
25 ZENGK LEMBAR 0 0
26 BENSIN Ltr 0 0
27 SOLAR Kg 0 0
28 KABEL ROL 0 0
29 SKOP BH 6 6
30 LINGGIS BH 0 0
31 EMBER COR BH 12 12
32 GEROBAK ARGO Bh 2 2
33 PROFIL TENGK 1100 BH 1 1
34 SIRTU Bh 0 0
35 TERPAL 2 X 4 Bh 0 0
36 SIRTU RET 40 40
37 BENANG TUKANG Bh 5 5
38 WATER MUR 1 1/2 Bh 1 1
39 ELBOW 1 1/2 Bh 1 1
40 LEM PIPA Bh 1 1
41 SOC DRAT LUAR Bh 1 1
42 BATU BATA Bh 1000 1000
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

43 TERPAL 3 X 4 Bh 1 0 1
44 Bh 0 0
45 M' 0 0
46 Bh 0 0
47 Bh 0 0
48 M' 0 0
49 M' 0 0
50 M' 0 0
51 M' 0 0
52 Roll 0 0
53 Kg 0 0
54 Kg 0 0
55 Kg 0 0
56 Kg 0 0
57 Kg 0 0
58 Lembar 0 0
59 BH 0 0
60 BH 0 0
61 BH 0 0
62 BH 0 0
63 BH 0 0
64 Kg 0 0
65 M' 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

66 Bh 0 0
67 Bh 0 0
68 Bh 0 0
69 Bh 0 0
70 Bh 0 0
71 Stap 0 0
72 Stap 0 0
73 Bh 0 0
74 Bh 0 0
75 M 0 0
76 LITER 0 0
77 Krtn 0 0
78 BH 0 0
79 Ltr 0 0
80 BH 0 0
81 BH 0 0
82 BH 0 0
83 UNIT 0 0
84 BH 0 0
85 ROL 0 0
86 BH 0 0
87 BH 0 0
88 Ltr 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

89 0 0
90 0 0
91 0 0
92 0 0
93 0 0
94 0 0
95 0 0
96 0 0
97 0 0
98 0 0
99 0 0
100 0 0
101 0 0
102 0 0
103 0 0
104 0 0
105 0 0
106 0 0
107 0 0
108 0 0
109 0 0
110 0 0
111 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

112 0 0
113 0 0
114 0 0
115 0 0
116 0 0
117 0 0
118 0 0
119 0 0
120 0 0
121 0 0
122 0 0
123 0 0
124 0 0
125 0 0
126 0 0
127 0 0
128 0 0
129 0 0
130 0 0
131 0 0
132 0 0
133 0 0
134 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

135 0 0
136 0 0
137 0 0
138 0 0
139 0 0
140 0 0
141 0 0
142 0 0
143 0 0
144 0 0
145 0 0
146 0 0
147 0 0
148 0 0
149 0 0
150 0 0
151 0 0
152 0 0
153 0 0
154 0 0
155 0 0
156 0 0
157 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

158 0 0
159 0 0
160 0 0
161 0 0
162 0 0
163 0 0
164 0 0
165 0 0
166 0 0
167 0 0
168 0 0
169 0 0
170 0 0
171 0 0
172 0 0
173 0 0
174 0 0
175 0 0
176 0 0
177 0 0
178 0 0
179 0 0
180 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

181 0 0
182 0 0
183 0 0
184 0 0
185 0 0
186 0 0
187 0 0
188 0 0
189 0 0
190 0 0
191 0 0
192 0 0
193 0 0
194 0 0
195 0 0
196 0 0
197 0 0
198 0 0
199 0 0
200 0 0
201 0 0
202 0 0
203 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

204 0 0
205 0 0
206 0 0
207 0 0
208 0 0
209 0 0
210 0 0
211 0 0
212 0 0
213 0 0
214 0 0
215 0 0
216 0 0
217 0 0
218 0 0
219 0 0
220 0 0
221 0 0
222 0 0
223 0 0
224 0 0
225 0 0
226 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

227 0 0
228 0 0
229 0 0
230 0 0
231 0 0
232 0 0
233 0 0
234 0 0
235 0 0
236 0 0
237 0 0
238 0 0
239 0 0
240 0 0
241 0 0
242 0 0
243 0 0
244 0 0
245 0 0
246 0 0
247 0 0
248 0 0
249 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

250 0 0
251 0 0
252 0 0
253 0 0
254 0 0
255 0 0
256 0 0
257 0 0
258 0 0
259 0 0
260 0 0
261 0 0
262 0 0
263 0 0
264 0 0
265 0 0
266 0 0
267 0 0
268 0 0
269 0 0
270 0 0
271 0 0
272 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

273 0 0
274 0 0
275 0 0
276 0 0
277 0 0
278 0 0
279 0 0
280 0 0
281 0 0
282 0 0
283 0 0
284 0 0
285 0 0
286 0 0
287 0 0
288 0 0
289 0 0
290 0 0
291 0 0
292 0 0
293 0 0
294 0 0
295 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

296 0 0
297 0 0
298 0 0
299 0 0
300 0 0
301 0 0
302 0 0
303 0 0
304 0 0
305 0 0
306 0 0
307 0 0
308 0 0
309 0 0
310 0 0
311 0 0
312 0 0
313 0 0
314 0 0
315 0 0
316 0 0
317 0 0
318 0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

319 0 0
320 0 0
321 0 0
322 0 0
323 0 0
324 0 0
325 0 0
326 0 0
327 0 0
328 0 0
329 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Realisasi
Total BULAN OKTOBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Proyek : PEMB AIR BERSIH MOA
Lokasi : MALUKU BARAT DAYA
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
AN OKTOBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
0
0
0
0
0
0
0
0
0
0
0
REALISASI BAHAN MASUK

Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi
Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 BATU KARANG PONDASI M3 0 0


2 KERIKIL KARUNG 0 0
3 PASIR M3 1 0 1
4 SEMEN @40 kg Zak 5 0 5
5 PIPA 3" STAP 0 0
6 PIPA 2" STAP 0 0
7 PIPA 1/2" STAP 0 0
8 KAYU KLAS II 5/5 X 4 M3 1 0
9 KAYU KLAS II 5/7 X 4 M3 1 0 1
10 KAYU KLAS II 5/10 X 4 M3 0 0
11 KAYU KLAS II 2/25 X 4 M3 0 0
12 KAYU KLAS II 3/25 X 4 M3 1 0 1
13 TRIPLEKS 3 MM LEMBAR 70 0 50
14 TRIPLEKS 9 MM LEMBAR 0 0
15 BESI BETON DIA. 12" STAP 0 0
16 BESI BETON DIA. 10" STAP 0 0
17 BESI BETON DIA. 8" STAP 0 0
18 BESI BETON DIA. 6" STAP 0 0
19 KAWAT BETON ROL 0 0
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

20 PAKU 10 CM KARUNG 0 0
21 PAKU 7 CM KARUNG 0 0
22 PAKU 5 CM KARUNG 0 0
23 PAKU 2 CM KG 1 0 1
24 PAKU ZENGK DOS 0 0
25 ZENGK LEMBAR 70 0 40 30
26 BENSIN Ltr 0 0
27 SOLAR Kg 0 0
28 KABEL ROL 1 0 1
29 SKOP BH 0 0
30 LINGGIS BH 0 0
31 EMBER COR BH 0 0
32 GEROBAK ARGO Bh 0 0
33 PROFIL TENGK 1100 BH 1 0 1
34 SIRTU Bh 0 0
35 TERPAL 2 X 4 Bh 0 0
36 TERPAL 6 X 8 Bh 3 0 3
37 ENGSEL JENDELA Bh 8 0 8
38 SLOT Bh 2 0 2
39 BATU GOSOK Bh 1 0
40 COK Bh 7 0 7
41 TERMINAL Bh 5 0 5
42 VETING Bh 7 0 7
Realisasi
Total BULAN SEPTEMBER
NO. URAIAN SAT.
Realisasi Yang lalu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

43 PALU Bh 1 0 1
44 PHILIPS 32 WAT Bh 2 0 2
45 PHILIPS 18 WAT BH 5 0 5
46 PARLAK M 3 0 3
47 KLOSET JONGKOK Bh 1 0 1
48 KRAN 3/4 BH 1 0 1
49 OBENG M' 1 0 1
50 TESPEN M' 1 0 1
51 M' 0 0
Proyek : PEMB AIR BERSIH MOA
Lokasi : MALUKU BARAT DAYA
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
1
5
0
0
0
1 1
1
0
0
1
20 70
0
0
0
0
0
0
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0
0
0
1
0
70
0
0
1
0
0
0
0
1
0
0
3
8
2
1 1
7
5
7
N SEPTEMBER 2019
Total
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1
2
5
3
1
1
1
1
0
DAFTAR KUANTITAS DAN HARGA RENCANA DAN MC 0%

Satuan Kerja : SNVT PJPA Maluku


Nama Pekerjaan : Pembangunan Intake dan Jaringan Pipa Transmisi Air Baku Moa; Kab. Maluku Barat Daya; 13 Km; m3/det
Lokasi : Kab. Maluku Barat Daya, Maluku
Tahun Anggaran : 2019

VOLUME SEMEN PASIR BATU PONDASI BATU BATA PAVING KERIKIL BESI
NO URAIAN SAT

MC 0% (sak) (m3) (ret) (m3) (ret) (bh) (m3) (bh) (m3) (ret) 8 10 12

I PEKERJAAN PERSIAPAN

1 Mobilisasi dan Demobilisasi Personil dan Peralatan Ls 2.00

2 Dokumentasi dan Sosialisasi Set 1.00

3 Pembuatan Papan Nama Proyek Buah 1.00

4 Penyediaan RK3 Ls 1.00

JUMLAH PEKERJAAN PERSIAPAN (I)

II PEMBANGUNAN

PEKERJAAN RUMAH PANEL DAN MENARA AIR, PAGAR,


1
RESERVOAR, HIDRAN UMUM

1.1 PEKERJAAN RUMAH PANEL 2,5 x 2,5 M

1 Galian Tanah M3 -

2 Galian Tanah berbatu M3 5.328

3 Timbunan Termasuk Perapihan M 3


6.082

4 Timbunan tanah rendom termasuk perapihan M3

5 Urugan Pasir M3 1.4253 1.71 0.43

6 Pasangan Batu Kosong M 3


1.600 1.60 0.40

7 Pasangan Pondasi Batu Kali/Gunung 1 Pc : 3 Psr M3 5.328 26.91 2.34 0.59 6.39 1.60

8 Pasangan Batako 1 pc : 3 psr M3 2.1155 8.77 240 704

9 Pengadaan & Pemasangan Paving Blok M 2


13.906 0.70 0.17 700

10 Beton bertulang 1 semen : 2 Pasir : 3 Kerikil termasuk bagesting M3 2.38 13.50 1.47 0.37 1.77 0.44 34.81 28.34

11 Plesteran 1 pc : 3 psr M2 42.31 8.23 1.27 0.32

12 Acian M 2
68.82 5.59
13 Pengecatan dinding M2 68.82

14 Pengecatan besi M2 10.69

15 Kosen Pintu, Daun Pintu Ukuran 120 x 210 cm (Besi) Unit 1.00

16 Pemasangan Terali Besi M2 2.55

17 Gembok Bh 1.00

JUMLAH 1.1

2.1 PEKERJAAN PAGAR 42 M'

1 Galian Tanah M3

2 Galian Tanah berbatu M3 0


3 Timbunan Termasuk Perapihan M 3
0.00
4 Timbunan tanah rendom termasuk perapihan M3

5 Urugan Pasir M3 0 2.016 0.504

6 Pasangan Batu Kosong M 3


9.984 0 0

7 Pasangan Batu Kali/Gunung 1Semen : 3 Pasir M3 0.00 81 7.027 1.757 19.16 4.7912

8 Pasangan Batako 1 pc : 3 psr M3 21.86 170.61 5.389 21.56 13,700 ###

9 Beton Bertulang 1 Semen : 2 Pasir : 3 Kerikil Termasuk Bagestin M 3


32.912 24.43 2.66 0.66 3.202 0.80 116.78 32.66

10 Plesteran 1 pc : 3 psr M2 3.86 27.05 4.175 1.044

11 Acian M2 159.40 14.17

12 Pengecatan Dinding M 2
123.20
13 Pekerjaan pagar kawat duri M1
159.4
14 Pekerjaan pintu pagar besi ukuran 120 x 120 Unit 252.00
15 Pengecatan Besi M2 1
16 Gembok Bh 3.78
Pipa Penyangga Dia 1.5" 1
Penyangga segitiga 99.84
JUMLAH 2.1 316.91037 21.27 25.53 19.16 4.7912 13699.62 4566540 0 3.202 0.801 116.78 32.66 0
3.1 PEKERJAAN RESERVOAR 100 M3

1 Galian Tanah M3 0
2 Galian Tanah Berbatu M 3 0.00
3 Timbunan Termasuk Perapihan M3 0
4 Timbunan tanah rendom termasuk perapihan M3 47.264
5 Timbunan Pasir M3 0.00 7.81 1.95

6 Pasangan Batu Kosong M3 101.40 34.01 8.50

7 Pasangan Batu Kali/Gunung 1Semen : 3 Pasir M3 28.34 926 80.7 20.17 220.1 55.021

8 Beton Tak bertulang 1 Semen : 2 Pasir : 3 Kerikil termasuk bagesting M 3 60.45 61.4 6.7 1.7 8.0 2.0

9 Beton bertulang K175 termasuk Pembesian dan bagesting M 3 10.81 176 19.15 4.79 23.05 5.76 98.25 393.23 114.40

10 Plesteran 1 pc : 3 psr M2 27.87 38 5.837 1.459

11 Acian M2 200.79 23

12 Stop Kran dia 2" Bh 180.91


13 Knie dia 2 " Bh 8.00
14 Water mur dia 2" Bh 10.00
15 Doble nepel dia 2" Bh 0.00
16 Plat besi penutup bak ukuran 60 x 60 cm Bh 2.00
17 Pipa udara Dia 1.5 " Bh 4.00
18 Pipa Penguras dia 2" Bh 2.00
19 Pengecatan Bak ( water prof) M2 1.00
20 Pengecatan Dinding M2 109.78
21 Pengadaan dan Pemasangan Tangga dari pipa GIP dia. 1,5" Medium SNI M 200.79
22 Pengadaan dan Pemasangan Tangga dari pipa GIP dia. 1" Medium SNI M 3.9
23 Pengadaan dan Pemasangan Pipa Inlet GIP dia. 2" Medium SNI M 5
JUMLAH 3.1

JUMLAH II 1224.49409 120.2 30 254.1 63.522 0 0 0 31.1 7.775 98.254 393.23 114.4

III PEKERJAAN BAK HIDRAN 2.25 M3 MENJADI KRAN UMUM 200 UNIT

1 Galian Tanah M3

2 Galian Tanah berbatu M3 0.00

3 Timbunan Termasuk Perapihan M3 40.00

4 Pasangan Batu Kali/Gunung 1Semen : 3 Pasir M3 47.26 404 35.2 8.8 96 24

5 Pasangan batu kosong M 3

6 Pasangan Batako 1 pc : 3 psr M3


7 Plesteran 1 Semen : 3 Pasir M2 0.00 673,440 16.56 4.14

8 Acian M2 552.00 45

9 Pengadaan & Pemasangan Paving Blok M 2

10 Beton Bertulang 1 Semen : 2 Pasir : 3 Kerikil termasuk bekesting M3

11 Tee dia. 1,5" Bh 0.00

12 Reduser 1.5 - 1 " Bh 200.00

13 Stop Kran dia 1 " Bh

14 Kran dia 1/2 " Bh 0.00

15 Socket dia. 1 " Bh

16 Socket dia.1/2" Bh 0.00

17 Knee dia.1" Bh

18 Pipa GIP dia.1/2" Medium SNI M1 200.00

19 Pipa GIP dia.1" Medium SNI M 1

20 Kran Pelampung dia. 1 " Bh

21 Double nipel dia.1" Bh 0.00

22 Plat besi penutup bak ukuran 60 x 60 cm Bh

23 Pipa udara Bh

24 Pipa Penguras dia 1.5 M1

25 Pengecatan ( water prof) M2 0.00

26 Pengecatan dinding M2 0.00

Beton Tanpa Tulangan 1 : 3 : 5 M3 552.00 0.23 5.562 1.391 6.696 1.674

Timbunan pasir M 3
9 12.29 3.072

JUMLAH III

TOTAL BAHAN
SEMEN PASIR BATU PONDASI BATU BATA PAVING KERIKIL BESI

(sak) (m3) (ret) (m3) (ret) (bh) (m3) (bh) (m3) (ret) 6 10 12

REAL ### 360 130 651 162.6 27,639 ### 700 77.07 19.27 464.9 880.1 228.8

PENAMBAHAN 1000 200 50 350 87.5 2,000.00 700.00 80 20 160 500 114
TIMBUNAN KAWAT CAT PLAMIR KERTAS CAT CAT MINYAK HENGSEL GRENDEL KAWAT BESI TRIPLEKS

TANAH BETON DIN DIN PASIR BESI DASAR CAT BESI PINTU BESI DURI SIKU 9 MIL

m3 ret (kg) (kg) (kntng) (lmbr) (kg) (kg) (kg) (bh) (bh) (m) (nh) (lmbr)

6.08 1.52

4.8 22.26
27 1.38 3.9

1.28 3.01 4.30

0 0

8.608 37.11

68 3.49 9.94

158 6.0
2 1
0.45 1.07 1.52

0 0 8.608 68 3.4884 9.9421 0.45 1.066 1.5196 2 1 157.92 6`


50

61.9748 142.79

75.9 3.89 11.091

75.9 3.89 11.091

50 0 61.9748 152 7.7831 22.182 0 0 0 0 0 0 0 142.7879

40.00 13.33
215 31.46 11.04

3.51 0.18 0.513

TIMBUNAN KAWAT CAT PLAMIR KERTAS CAT CAT MINYAK HENGSEL GRENDEL KAWAT BESI TRIPLEKS

TANAH BETON DIN DIN PASIR BESI DASAR CAT BESI PINTU BESI DURI SIKU 9 MIL

m3 ret (kg)/(rol) (kg) (kntng) (lmbr) (kg) (kg) (kg) (bh) (bh) (m) (nh) (lmbr)

146 14.9 145.92 685 55.56 79.72 2.2 5.147 7.3365 4 2 315.8 12 344.946

55 18.33 100.000 480 65 50 2 5 8 160 7 180


DAFTAR KUANTITAS DAN HARGA RENCANA DAN MC 0%

Satuan Kerja : SNVT PJPA Maluku


Nama Pekerjaan : Pembangunan Intake dan Jaringan Pipa Transmisi Air Baku Moa; Kab. Maluku Barat Daya; 13 Km; m3/det
Lokasi : Kab. Maluku Barat Daya, Maluku
Tahun Anggaran : 2019

VOLUME SEMEN PASIR BATU PONDASI BATU BATA PAVING KERIKIL BESI
NO URAIAN SAT

MC 0% (sak) (m3) (ret) (m3) (ret) (bh) (m3) (bh) (m3) (ret) 8 10

I PEKERJAAN PERSIAPAN

1 Mobilisasi dan Demobilisasi Personil dan Peralatan Ls 2.00

2 Dokumentasi dan Sosialisasi Set 1.00

3 Pembuatan Papan Nama Proyek Buah 1.00

4 Penyediaan RK3 Ls 1.00

JUMLAH PEKERJAAN PERSIAPAN (I)

II PEMBANGUNAN

PEKERJAAN RUMAH PANEL DAN MENARA AIR, PAGAR,


1
RESERVOAR, HIDRAN UMUM

1.1 PEKERJAAN RUMAH PANEL 2,5 x 2,5 M

1 Galian Tanah M3 -

2 Galian Tanah berbatu M3 5.328

3 Timbunan Termasuk Perapihan M 3


6.082

4 Timbunan tanah rendom termasuk perapihan M3

5 Urugan Pasir M3 1.4253 1.71 0.43

6 Pasangan Batu Kosong M 3


1.600 1.60 0.40

7 Pasangan Pondasi Batu Kali/Gunung 1 Pc : 3 Psr M3 5.328 26.91 2.34 0.59 6.39 1.60

8 Pasangan Batako 1 pc : 3 psr M3 2.1155 8.77 240 704

9 Pengadaan & Pemasangan Paving Blok M 2


13.906 0.70 0.17 700

10 Beton bertulang 1 semen : 2 Pasir : 3 Kerikil termasuk bagesting M3 2.38 13.50 1.47 0.37 1.77 0.44 34.81 28.34

11 Plesteran 1 pc : 3 psr M2 42.31 8.23 1.27 0.32

12 Acian M 2
68.82 5.59
13 Pengecatan dinding M2 68.82

14 Pengecatan besi M2 10.69

15 Kosen Pintu, Daun Pintu Ukuran 120 x 210 cm (Besi) Unit 1.00

16 Pemasangan Terali Besi M2 2.55

17 Gembok Bh 1.00

JUMLAH 1.1 63 7 2 8 2 240 704 700 2 0 35 28

2.1 PEKERJAAN PAGAR 42 M'

1 Galian Tanah M3

2 Galian Tanah berbatu M3 0


3 Timbunan Termasuk Perapihan M 3
0.00
4 Timbunan tanah rendom termasuk perapihan M3 0.00
5 Urugan Pasir M 3
0.00 2.016 0.504

6 Pasangan Batu Kosong M 3


9.98 0 0

7 Pasangan Batu Kali/Gunung 1Semen : 3 Pasir M3 0.00 81 7.02702 1.7568 19.1646 4.7912

8 Pasangan Batako 1 pc : 3 psr M3 21.86 22.00 5.38934 21.557 1,700

9 Beton Bertulang 1 Semen : 2 Pasir : 3 Kerikil Termasuk Bagestin M 3


32.91 30.00 2.65987 0.66 3.202 0.80 50.00 32.66

10 Plesteran 1 pc : 3 psr M2 3.86 40.00 4.17512 1.0438

11 Acian M2 159.40 15.00

12 Pengecatan Dinding M 2
123.20
13 Pekerjaan pagar kawat duri M1
159.40
14 Pekerjaan pintu pagar besi ukuran 120 x 120 Unit 252.00
15 Pengecatan Besi M2 1.00
16 Gembok Bh 3.78
Pipa Penyangga Dia 1.5" 1.00
Penyangga segitiga 99.84
JUMLAH 2.1 188 21 26 19 5 1,700 - 0 3 1 50 33
3.1 PEKERJAAN RESERVOAR 100 M3

1 Galian Tanah M3 0
2 Galian Tanah Berbatu M 3 0
3 Timbunan Termasuk Perapihan M3 0
4 Timbunan tanah rendom termasuk perapihan M3 47.264
5 Timbunan Pasir M3 0 7.81 1.95

6 Pasangan Batu Kosong M3 101.4 34.01 8.50

7 Pasangan Batu Kali/Gunung 1Semen : 3 Pasir M3 28.3375 200 80.6978 20.174 220.085 55.021

8 Beton Tak bertulang 1 Semen : 2 Pasir : 3 Kerikil termasuk bagesting M 3 60.44768 61.4 6.7 1.7 8.0 2.0

9 Beton bertulang K175 termasuk Pembesian dan bagesting M 3 10.811 200 19.1502 4.79 23.05 5.76 98.25 393.23

10 Plesteran 1 pc : 3 psr M2 27.87384 40 5.83736 1.4593

11 Acian M2 200.7905 23

12 Stop Kran dia 2" Bh 180.9088


13 Knie dia 2 " Bh 8
14 Water mur dia 2" Bh 10
15 Doble nepel dia 2" Bh 0
16 Plat besi penutup bak ukuran 60 x 60 cm Bh 2
17 Pipa udara Dia 1.5 " Bh 4
18 Pipa Penguras dia 2" Bh 2
19 Pengecatan Bak ( water prof) M2 1
20 Pengecatan Dinding M2 109.7785
21 Pengadaan dan Pemasangan Tangga dari pipa GIP dia. 1,5" Medium SNI M 200.7905
22 Pengadaan dan Pemasangan Tangga dari pipa GIP dia. 1" Medium SNI M 3.9
23 Pengadaan dan Pemasangan Pipa Inlet GIP dia. 2" Medium SNI M 5
JUMLAH 3.1 525 120 30 254 64 0 0 0 31 8 98 393

JUMLAH II

III PEKERJAAN BAK HIDRAN 2.25 M3 MENJADI KRAN UMUM 200 UNIT

1 Galian Tanah M3

2 Galian Tanah berbatu M3 0.00

3 Timbunan Termasuk Perapihan M3 40.00

4 Pasangan Batu Kali/Gunung 1Semen : 3 Pasir M3 47.26 112 35.2 8.8 30 24

5 Pasangan batu kosong M 3

6 Pasangan Batako 1 pc : 3 psr M3


7 Plesteran 1 Semen : 3 Pasir M2 0.00 200 16.56 4.14

8 Acian M2 552.00 25

9 Pengadaan & Pemasangan Paving Blok M 2

10 Beton Bertulang 1 Semen : 2 Pasir : 3 Kerikil termasuk bekesting M3

11 Tee dia. 1,5" Bh 0.00

12 Reduser 1.5 - 1 " Bh 200.00

13 Stop Kran dia 1 " Bh

14 Kran dia 1/2 " Bh 0.00

15 Socket dia. 1 " Bh

16 Socket dia.1/2" Bh 0.00

17 Knee dia.1" Bh

18 Pipa GIP dia.1/2" Medium SNI M1 200.00

19 Pipa GIP dia.1" Medium SNI M 1

20 Kran Pelampung dia. 1 " Bh

21 Double nipel dia.1" Bh 0.00

22 Plat besi penutup bak ukuran 60 x 60 cm Bh

23 Pipa udara Bh

24 Pipa Penguras dia 1.5 M1

25 Pengecatan ( water prof) M2 0.00

26 Pengecatan dinding M2 0.00

Beton Tanpa Tulangan 1 : 3 : 5 M3 552.00 0.23 5.562 1.3905 6.696 1.674

Timbunan pasir M 3
9.00 12.288 3.072

JUMLAH III 337.23 69.61 ### 30.00 ### - - - 6.70 1.67 - -


TIMBUNAN KAWAT CAT PLAMIR KERTAS CAT CAT MINYAK HENGSEL GRENDEL KAWAT BESI TRIPLEKS
BESI
TANAH BETON DIN DIN PASIR BESI DASAR CAT BESI PINTU BESI DURI SIKU 9 MIL

12 m3 ret (kg) (kg) (kntng) (lmbr) (kg) (kg) (kg) (bh) (bh) (m) (nh) (lmbr)

6.08 1.52

4.8 22.26
27 1.38 3.9

1.283 3.01 4.30

- 6 2 5 27 1 4 1 3 4 - - - - 22

0 0

8.608 37.11

68.0247 3.49 9.94

158 6.0
2 1
0.454 1.07 1.52

0 0 0 9 68 3 10 0 1 2 2 1 158 6 37
50

114.40 61.9748 142.79

75.8856 3.89 11.091

75.8856 3.89 11.091

114 50 0 62 152 8 22 0 0 0 0 0 0 0 143

40.00 13.33
215.28 31.46 11.04

3.51 0.18 0.513

- 40.00 ### - ### ### ### - - - - - - - -


ESTIMASI BAHAN BAK MOA

NO URAIAN SATUAN JUMLAH 1 ESTIMASI SATUAN MASUK SATUAN SISA SATUAN


1 SEMEN SAK 525 150 SAK 374.62 SAK
2 PASIR M3 120 30 M3 17 M3 103.18 RET
3 BATU PONDASI M3 254 64 M3 14 M3 240.09 RET
4 BATU KERIKIL M3 31.10 933 KARUNG 7.4 M3 23.70 M3 280.00
5 BESI 8 STAP 98.3 20 STAP 78.25 STAP
6 BESI 10 STAP 393 235 STAP 158.23 STAP
7 BESI 12 STAP 114 105 STAP
8 KAWAT BETON KG 25 25 KG -
9 PAVING BLOK BH 4,056 -
10 KAYU 5/10 X 4M M3 8
11 PAPAN 3/25 X 4M M3 4
ESTIMASI BAHAN PAGAR MOA

NO URAIAN SATUAN JUMLAH 1 ESTIMASI SATUAN MASUK SATUAN SISA SATUAN KETERANGAN
1 SEMEN SAK 188 100 SAK 87.65 SAK
2 PASIR M3 21.27 5 RET 8 RET 13.27 RET
3 BATU PONDASI M3 19 5 RET 14 RET 5.16 RET
4 BATU KERIKIL M3 3.2 3.63 M3 3.6 M3 (0.43) M3 (12.93)
5 BESI 8 STAP 50.0 50 STAP - STAP
6 BESI 10 STAP 33 30 STAP 2.66 STAP
7 TIMBUNAN M3 50 48.00 2.00 M3 SELESAI KERJA
ESTIMASI BAHAN PAGAR MOA

NO URAIAN SATUAN JUMLAH 1 ESTIMASI SATUAN MASUK SATUAN SISA SATUAN KETERANGAN
1 SEMEN SAK 337 0 SAK
2 PASIR M3 69.61 17 RET 0 RET
3 BATU PONDASI M3 30 8 RET 0 RET
4 BATU KERIKIL M3 6.7 3.63 M3 0.0 M3 -