Professional Documents
Culture Documents
© RWE Innogy
Nordsee
©R
WE
In nogy Ost
OFFSHORE WIND
Build your success on solid foundations
Products
• Monopiles / Transition Pieces During the renewable energy boom at the Due to continuous investments in technology
• Pre-fabricated Components start of the 21st century, the wind energy and human resources, we can manufacture
for Jackets used for industry was brought into offshore areas. almost all types of foundations in accordance
Wind Turbines EEW recognised this trend early and develo- with our customers’ requirements. EEW
SB
O
©
Substations (HVAC) ped itself into a pioneer in the production manufactures monopiles, transition pieces
s
r
ie
u st
I nd
a dt
Bl
©
1,302.5 t
XL MONOPILES
Heaviest XL More metres today –
JACKET COMPONENTS
Monopile ever
produced more power tomorrow
The newest development in our product
portfolio for the offshore wind industry is
the manufacturing of XL Monopiles. Through Serial production of structural pipes for offshore foundations
extensive investments in special production
halls and facilities in our Rostock plant, we
are in the position to manufacture monopiles Besides monopiles, jacket constructions are of production facilities enables us to deliver
with diameters of up to 10 m (394") and another state-of-the-art foundation type serial production of jacket components for
piece weights of up to 1,500 tonnes. for offshore wind turbines. Having more large scale projects. Based on our extensive
than 40 years experience in the fabrication expertise, we are able to provide you with
So-called XL Monopiles are considered to be of structural pipes and pipe components for pipe components for all types of jacket
the most reasonable solution for the foun- offshore foundations, we can contribute foundations whether 3-leg or 4-leg designs,
dation of offshore wind farms with higher with technical support and perfect project pre-piled, post-piled or suction buckets.
301
©A
ndreas D rst / STUDIO
ue
turbine power in deeper waters. management skills. Our worldwide network
6 – 7
Conductor Guides
Conductor
Trunnion
Stub
Leg
Bracing
Elevation
Anode
Cone
Padeye
Pile
of EEW. Since the foundation in 1936, EEW chords for jack-up rigs or low-temperature
has constantly grown in this business. steels for the use in arctic environments
is our daily business.
With regard to our extensive experience in
the production of steel pipes, we are able As a special service for customers in the con-
to fulfil our customers’ highest requirements. struction branch, we offer our Point-to-Point Jacket structure
Apart from standard steel grades used in Construction Service.
Selection of jacket components 8 – 9
produced by EEW (not exclusive)
A MATTER OF EXPERTISE Burj
Khalifa More than 700 tonnes
of structural SAW
pipes have been pro-
Special products for our offshore customers duced for the world’s
tallest building.
Tension legs
As the offshore oil and gas industry is cons-
tantly moving into deeper waters in order to
tap into new sources, so-called tension legs
present an adequate alternative to conventi-
onal jacket foundations. Tendon pipes must
offer great resistance to fatigue and collapse.
C
CIVIL CONSTRUCTION
HM
©
10 – 11
POINT-TO-POINT
CONSTRUCTION SERVICE
Greater than the sum of its parts
Our Point-to-Point Construction Service
involves the pre-fabrication of piping com-
ponents from detailed engineering and pipe
Apart from single pipe lengths, construction
components with the following full or single
services can be supplied:
BENEFITS
production to the organisation of transport. With today’s rapid changes in market demands
At an early stage, EEW starts the pre-project • Cutting to fix length, bevelling and challenges in pricing, flexibility is a crucial
planning in close collaboration with the cus- and tapering factor. EEW’s Point-to-Point Construction Service
tomer. By detailed engineering, the optimal • Circumferential welding enables you to get one step ahead of the
piping solutions are mutually identified. • Production and assembly of attach- competition by a significant improvement of:
When pipe production starts, the key activity ments like cones, shim plates or ring
of our Point-to-Point Construction Service – stiffeners
the fabrication of ready for assembly piping • Weld beads (shear keys) Cost efficiency & schedule
components – is applied. • End profiling
• Reduced lead time in fabrication
• Enabling simultaneous construction work
• No interferences in the yard
• Minimal wastage
Quality
• Controlled production conditions
CNC cutting • Defined procedures and repetitive
processes
EEW is able to: • Highly skilled staff
• Perform all kinds of end cutting,
like profile cuts with weld edge
preparation
Safety & environment
• Cut nozzle openings with weld
• Elimination of weather conditions
edge preparation • Reduction of work at elevated heights
• Perform a wide range of contours, • Reduction of wastage and transport
e. g. square, rectangular or oval
• In dimensions up to 6,000 mm
diameter
• Detailed engineering
• Generation of BOM´s
(Bill of Materials)
based on 3D-drawings 12 – 13
© Kvaerner
FULL SERVICE Direct access
to quay
Complete solutions for your requirements
Secondary
steel As a special service for our customers,
we provide full logistical concepts and
supply chain management for storage,
transportation and load out (RoRo,
© Bla
dt I nd
ust
rie
s
Coating floating and crane concepts)
on request.
Logistical
Various techniques of corrosion
protection can be carried out
support
TSA according to all well-known
standards e. g. NORSOK M-501.
coating
s/
eb
u.
ko allows to omit additional cathodic anodes.
ch
@m
bu
- gm
This leads to cost-effectiveness and environ-
bh.d
e mental benefits.
14 – 15
total tonnage
4 customers 6 EEW mills
10 delivery 7,432 no. of items
destinations 256 deliveries
6 countries
CHAIN CONCEPTS
our ability as well as our willingness to adapt
to customer’s individual requirements as well
as our flexibility in developing customised
technical and commercial solutions.
Mobile
Creating win-win situations production &
logistics hub
In close cooperation with our customers and part- industry worldwide. Additionally, EEW has mobile
ners, we develop individual supply chain concepts. production facilities available, which can be installed
These concepts do not only include the fabrication in a short period of time to enable the final assembly
of complete offshore components in ready-to- of pipe components everywhere our customers wish.
install condition but also full logistical support
inclusive load out and sea fastening.
Project management
Mobile production Our top performance in production, our flexibility
as well as our ability to adhere to delivery appoint-
Being close to our customers and their projects – ments and budgets are united in our technical
for EEW, this is more than just a promise, it is a and commercial project management. We have
pledge. With our unique production network developed excellent skills in project management
consisting of nine strategically well-located pipe and established standardised processes in order
mills, we are ideally prepared to serve the offshore to handle large scale projects.
16 – 17
PRODUCTION PROGRAMME Product
certifications
• EN 1090-2
406 – 10,000 mm O. D.
CERTIFICATES We are able to process all
common offshore grades
starting at S355 up to
S690 and above.
A matter of trust
8 – 300 mm W. T.
High quality and reliability have top priority at
EEW. We make no compromise where material,
workmanship and quality control are concerned.
18 – 19
‘It is EEW‘s core interest
to fully comply with Ørsted’s
HSE Policy and way of living it.’
Kennet Majlund Larsen,
Lead HSE Advisor, Ørsted
HSE CSR
Working together for safety Taking responsibility
We are aware of our responsibility for the It is our own approach to ensure that our in-
community, the environment and the health ternational activities conform to the required
and safety of our more than 2,100 employees OUR Working together laws and regulations as well as to the expecta-
worldwide. That‘s why we are convinced APPROACH for safety tions of our customers and community.
that HSE is an essential aspect of a successful
project delivery as well as a necessary part of
a strongly-integrated group management.
We have established an integrated manage-
ment system within the EEW Group containing
QHSE
Through regular self-evaluation, assessments the internationally recognised certifications certifications
of learning process and training programmes, in accordance with ISO 9001, OHSAS 18001,
we always improve our HSE performance. ISO 14001 and ISO 50001.
MP‘S / TP‘S
2015 Sandbank Vattenfall Germany 78,000 t
2010 & 2013 / 2014 EnBW Baltic I + II EnBW / ArGe Baltic 2 Foundations Germany 41,860 t
m
da
2013 Butendiek Ballast Nedam Germany 73,000 t
Ne
st
2012 / 2013 Gwynt y Môr RWE UK 110,020 t
lla
Ba
©
2010 / 2011 London Array Aarsleff/Bilfinger Berger JV UK 69,840 t
JACKETS
2015 Wikinger Bladt Industries, Navantia Germany 24,600 t
REFERENCES
2013 EnBW Baltic II EnBW Germany 42,090 t
SUBSTATIONS
2017 Deutsche Bucht Iemants Germany 2,400 t
2012
Sandbank Jacket
Nordic Yards
Germany
Germany
2,430 t
4,940 t
2015 Culzean WHP & CPF & ULQ Jacket Heerema / Maersk UK 10,630 t
EUROPE
2013 Martin Linge Jacket Kvaerner / Total Norway 15,630 t
2012 Eldfisk II 2/7 S Jacket and Bridge Support Jacket Dragados / ConocoPhillips Norway 5,760 t
2014 Ewing Bank 834 Gulf Marine Fabricators / Walter Oil & Gas USA 13,430 t
22 – 23
EEW Structural Pipes are produced by:
Im Grünewald 2 Phone +49 27 53 609-0 Am Eisenwerk 1 Phone +49 381 8 17 16-0
57339 Erndtebrück Fax +49 27 53 609-190 18147 Rostock Fax +49 381 8 17 16-110
Germany E-Mail info@eew-group.com Germany E-Mail info@eewspc.de
www.eew-group.com