Analisa Harga Satuan Sni BQ Rab Rekap
Analisa Harga Satuan Sni BQ Rab Rekap
In English
NO URAIAN
I PEKERJAAN PERSIAPAN
Pembulatan
Terbilang : Delapan Puluh Lima Juta Delapan Ratus Dua Puluh Ribu Rupiah
Belawan,
Dibuat Ole
STAF FASILI
RIZALDY HASIAN H
EKAPITULASI BIAYA
2,200,000.00
73,821,376.27
2,000,000.00
78,021,376.27
7,802,137.63
85,823,513.90
85,820,000.00
Belawan, 2012
Dibuat Oleh :
STAF FASILITAS
I PEKERJAAN PERSIAPAN
1 Survey lokasi 1.00 ls 200,000.00 0.00 200,000.00 200,000.00
2 Mobilisasi dan Demobilisasi Alat 1.00 ls 2,000,000.00 0.00 2,000,000.00 2,000,000.00
JUM
II PEKERJAAN PERBAIKAN DRAENASE DAERAH I
1 Pekerjaan perbaikan beton dudukan grill 1.00 ls 200,000.00 300,000.00 500,000.00 200,000.00
2 Pekerjaan bongkar beton 3.13 m³ 464,000.00 0.00 464,000.00 1,453,248.00
3 Pekerjaan bongkar pasangan bata 6.28 m² 165,500.00 0.00 165,500.00 1,039,298.63
4 Pekerjaan beton bertulang dinding drainase 13.46 m³ 508,679.60 2,866,161.24 3,374,840.84 6,849,040.17
5 Pekerjaan besi siku pinggir 40.40.4 309.33 kg 8,880.00 13,915.00 22,795.00 2,746,880.00
6 Pekerjaan besi pelat strip 5.30 128.00 kg 8,880.00 13,915.00 22,795.00 1,136,640.00
7 Pekerjaan besi kotak 40x40 t 1,2 676.45 kg 8,880.00 13,915.00 22,795.00 6,006,915.07
JUM
III PEKERJAAN LAIN-LAIN
1 Pembersihan akhir 1.00 ls 1,000,000.00 0.00 1,000,000.00 1,000,000.00
2 Dokumentasi dan laporan 1.00 ls 1,000,000.00 0.00 1,000,000.00 1,000,000.00
JUM
Belawan,
Dibua
STAF FA
Harga satuan (Rp) Jumlah ha
No. Uraian Satuan Volume Belawan,
Upah Bahan Upah + Bahan Upah
2 3 4 5 6 7 8 Dibua
STAF FA
RIZALDY HAS
OWNERS ESTIMATE (OE)
0.00 200,000.00
0.00 2,000,000.00
JUMLAH 2,200,000.00
300,000.00 500,000.00
0.00 1,453,248.00
0.00 1,039,298.63
38,590,998.09 45,440,038.26
4,304,373.33 7,051,253.33
1,781,120.00 2,917,760.00
9,412,862.98 15,419,778.05
JUMLAH 73,821,376.27
0.00 1,000,000.00
0.00 1,000,000.00
JUMLAH 2,000,000.00
Belawan, 2012
Dibuat Oleh :
STAF FASILITAS
Jumlah harga (Rp)
Belawan, 2012
Bahan Upah + Bahan
Dibuat
9 Oleh : 10
STAF FASILITAS
PEKERJAAN
LOKASI
TAHUN
UPH UPAH
UPH UPH1 Tukang kayu
UPH UPH2 Tukang batu
UPH UPH3 Tukang alumunium
UPH UPH4 Tukang besi
UPH UPH5 Tukang las
UPH UPH6 Tukang cat
UPH UPH7 Tukang plitur
UPH UPH8 Tukang bor
UPH UPH9 Tukang listrik
UPH UPH10 Tukang pipa ledeng
UPH UPH11 Tukang Pancang
UPH UPH12 Kepala tukang
UPH UPH13 Tukan gali/timbun
UPH UPH14 Pekerja
UPH UPH15 Mandor
UPH UPH16 Pengawas
UPH UPH17 Ahli ukur
UPH UPH18 Asisten ahli ukur
UPH UPH19 Sopir
UPH UPH20 Masinis
UPH UPH21 Kernet / pembantu sopir
UPH UPH22 Mekanik terlatih
UPH UPH23 Operator tak terlatih
UPH UPH24 Operator terlatih
UPH UPH25 Pembantu Operator
UPH UPH26 Operator semi terlatih
UPH UPH27 Penjaga
UPH UPH28 Penyelam
UPH UPH29 Tukang Grouting
UPH UPH30 Operator mesin sondir
UPH UPH31 Analis test sondir
ASB ASBES
ASB ASB1 Asbes plat ( 100 x 100 x 0,3 )
ASB ASB2 Asbes gelombang besar ( 225 x 92 x 0,5 )
KODE NO. NAMA BARANG / BAHAN / TENAGA
ASB ASB3 Asbes gelombang besar ( 200 x 92 x 0,5 )
ASB ASB4 Asbes gelombang besar ( 180 x 92 x 0,5 )
ASB ASB5 Asbes gelombang besar ( 240 x 108 x 0,6 )
ASB ASB6 Asbes gelombang besar ( 210 x 108 x 0,6 )
ASB ASB7 Asbes gelombang besar ( 180 x 108 x 0,6 )
ASB ASB8 Asbes gelombang kecil ( 210 x 105 x 0,4 )
ASB ASB9 Asbes gelombang kecil ( 180 x 105 x 0,4 )
ASB ASB10 Asbes gelombang kecil ( 150 x 105 x 0,4 )
ASB ASB11 Asbes gelombang kecil ( 240 x 105 x 0,4 )
ASB ASB12 Asbes nok gelombang besar
ASB ASB13 Asbes nok gelombang kecil
ASB ASB14 Nok paten (Rabung)
ASB ASB15 Nok stel rata
ASP ASPAL
ASP ASP1 Aspal cair
ASP ASP2 Aspal curah
ASP ASP3 Aspal drum
ASP ASP4 Aspal modifer / asphalt joint
ASP ASP5 Drum aspal bekas
ASP ASP6 Rubber Filler
ASP ASP7 Filler
ASP ASP8 Karosene
ATP GENTENG
ATP ATP1 Genteng beton besar natural 1m 9 biji
ATP ATP2 Genteng beton besar warna 1m 9 biji
ATP ATP3 Genteng beton kecil natural 1m 11 biji
ATP ATP4 Genteng beton kecil warna 1m 11 biji
ATP ATP5 Genteng beton kecil natural 1m 20 biji
ATP ATP6 Genteng beton kecil warna 1m 20 biji
ATP ATP7 Genteng metal
ATP ATP8 Genteng bubungan beton
ATP ATP9 Bubung stel gelombang
ATP ATP10 Genteng bubungan warna
ATP ATP11 GENTENG & RABUNG
ATP ATP12 Genteng keramik lengkung cekung / vlaams
ATP ATP13 Genteng keramik lengkung rata
ATP ATP14 Genteng keramik rata / kodok
ATP ATP15 Genteng keramik berglasir KIA, Kanmuri Natural
ATP ATP16 Nok metal
ATP ATP17 ATAP GENTENG METAL
ATP ATP18 Atap metal gelombang t 0,35 mm
KODE NO. NAMA BARANG / BAHAN / TENAGA
ATP ATP19 Nok standar 40 cm 18 SWG 22
ATP ATP20 Paku anti karat
ATP ATP21 Atap alumunium gelombang tebal 0,55
ATP ATP22 Atap polykarbonat
ATP ATP23 Paku skrup anti karat atap metal/polykarbonat
ATP ATP24 Rabung Atap spandek
ATP ATP25 Atap spandek
ATP ATP26 Baut + Hak Spandek
ATP ATP27 SENG BJLS
ATP ATP28 Seng BJLS 0,20 gelombang P = 180 cm
ATP ATP29 Seng BJLS 0,20 gelombang P = 240 cm
ATP ATP30 Seng plat 3" x 6" BJLS 28
ATP ATP31 Seng gelombang 2" - 5" BJLS 24
ATP ATP32 Alumunium gelombang tebal 0,55
ATP ATP33 Alumunium foil
ATP ATP34 Rabung alumunium standar 40 cm 18 SWG 22
CAT CAT
CAT CAT1 Cat dasar meni
CAT CAT2 Cat tembok melamin
KODE NO. NAMA BARANG / BAHAN / TENAGA
CAT CAT3 Cat dasar meni kayu
CAT CAT4 Cat alkali resisting primer
CAT CAT5 Cat ICI Weathershield
CAT CAT6 Cat penutup
CAT CAT7 Cat kayu
CAT CAT8 Cat Epoxy/Tar
CAT CAT9 Dempul kayu typa A (putih) Jago
CAT CAT10 Plamur Fuji
CAT CAT11 Kalkarium
CAT CAT12 Politur jadi
CAT CAT13 Teak oil Fuji
CAT CAT14 Pernis
CAT CAT15 Minyak cat
CAT CAT16 Thinner
CAT CAT17 Kuas roll
CAT CAT18 Kuas ukuran 3,5"
CAT CAT19 Kuas ukuran 2,5"
CAT CAT20 Kuas ukuran kecil 1"
CAT CAT21 Soda api
CAT CAT22 Sabun deterjen
CAT CAT23 Amplas
CAT CAT24 Perekat
LAIN-LAIN
KODE NO. NAMA BARANG / BAHAN / TENAGA
DLL DLL1 Tiang bendera
DLL DLL2 -Pondasi umpak
DLL DLL3 -Ompak ornamen
DLL DLL4 -Tiang galvanis 3"
DLL DLL5 -Bendera 120 x 180
DLL DLL6 Rambu lalu lintas (terpasang)
DLL DLL7 Papan nama jalan (terpasang)
DLL DLL8 Sumur peresapan 5 m
DLL DLL9 Air minum, instalasi dalam dengan pipa pralon 1" medium, acesories dihitung sendir
DLL DLL10 Air minum, instalasi luar dengan pipa pralon 1" medium, acesoris dihitung sendiri
DLL DLL11 Asbuton
DLL DLL12 Tumpuan konstruksi
DLL DLL13 Geotextile Polyfelt. TS 70
DLL DLL14 Pelapisan kedap air lantai dengan coating ( terpasang )
DLL DLL15 Pelapisan kedap air lantai dengan membran ( terpasang )
KYU KAYU
KYU KYU1 Kayu Kelas III
KYU KYU2 Damar Laut (Kelas I)
KYU KYU3 Kayu meranti balok
KYU KYU4 Kayu meranti papan
KYU KYU5 Papan kayu damar laut
KYU KYU6 Papan cetakan / bekesting
KYU KYU7 Kayu dolken
KYU KYU8 Kayu dolken Ø 8 - 10/400 cm
KYU KYU9 Perancah kayu
KYU KYU10
KYU KYU11 LIST KAYU PROFIL
KYU KYU12 List kayu profil
KYU KYU13 Kayu plepet eternit 1/5 cm
KYU KYU14
KYU KYU15 KAYU LAPIS
KYU KYU16 Akustik soft board 60 x 120
KYU KYU17 Akustik soft board 40 x 60
KYU KYU18 Akustik soft board 30 x 60
KYU KYU19 Melamin wood 90 x 120 cm
KYU KYU20 Melamin wood 120 x 240 cm
KYU KYU21 Formika 4" x 8" x 0,3 cm
KYU KYU22 Triplek
KYU KYU23 Teak wood ( 90 x 240 )
KYU KYU24 Plywood 4 mm
KYU KYU25 Multiplek
KODE NO. NAMA BARANG / BAHAN / TENAGA
LNT TEGEL / KERAMIK
LNT LNT1 Plint tegel abu-abu 15/20
LNT LNT2 Plint tegel abu-abu 10/20
LNT LNT3 Plint tegel abu-abu 10/30
LNT LNT4 Plint tegel abu-abu 10/40
LNT LNT5 Plint tegel warna 10/20
LNT LNT6 Plint tegel warna 10/30
LNT LNT7 Plint tegel warna 10/40
LNT LNT8 Plint ubin teraso 10/30
LNT LNT9 Plint ubin teraso 10/40
LNT LNT10 Plint ubin granit 10/30
LNT LNT11 Plint ubin granit 10/40
LNT LNT12 Plint ubin teralux marmer 10/60
LNT LNT13 Plint ubin teralux marmer 10/40
LNT LNT14 Plint ubin teralux marmer 10/30
LNT LNT15 Tegel keramik 5/20 berglasir
LNT LNT16 Tegel keramik 10/20 berglasir
LNT LNT17 Tegel keramik 10/30 berglasir
LNT LNT18 Tegel keramik 20/20 berglasir
LNT LNT19 Tegel keramik 30/30 berglasir
LNT LNT20 Tegel keramik 40/40 berglasir
LNT LNT21 Tegel keramik mosaik
LNT LNT22 Marmer
LNT LNT23 Tegel porselin
LNT LNT24 Stepnosing granito
LNT LNT25 List keramik dinding motif 5/20
LNT LNT26 Plint keramik artistik
LNT LNT27 Keramik dinding 20/25
LNT LNT28 Internal cove
LNT LNT29 Bahan teraso cor
LST LISTRIK
LST LST1 Pasang instalasi / titik
LST LST2 Penyambungan beban
LST LST3 Kabel Snoor 2 x 0,23 "Supreme"
LST LST4 Kabel NYA 2,5 sqmm "Supreme"
LST LST5 Kabel NYA 1,5 sqmm "Supreme"
LST LST6 Kabel NYA 2,5 sqmm "Supreme"
LST LST7 Kabel NYA 1,5 sqmm "Supreme"
LST LST8 Kabel NYM 2 x 1,5 sqmm "Supreme"
LST LST9 Kabel NYM 2 x 2,5 sqmm "Supreme"
LST LST10 Kabel NYM 2 x 4 sqmm "Supreme"
KODE NO. NAMA BARANG / BAHAN / TENAGA
PKU PAKU
PKU PKU1 Paku gording 125 x 5,1 mm
PKU PKU2 Paku usuk 80 x 3,8 mm
PKU PKU3 Paku reng 55 x 3,1 mm
PKU PKU4 Paku eternit 20 x 1,5 mm
PKU PKU5 Water mur
PKU PKU6 Angkur / baut
PKU PKU7 Paku biasa
PKU PKU8 Paku asbes
PKU PKU9 Paku sumbat
PKU PKU10 Paku sekrup 3.5"
PKU PKU11 Paku skrup
PKU PKU12 Paku triplek
PKU PKU13 Paku gypsum
PKU PKU14 Paku hak panjang 15 cm
PKU PKU15 Paku biasa 1/2" - 1"
PIPA
PPA PPA1 Pipa beton 20 x 30 Panjang 1 m
PPA PPA2 Pipa beton 15 x 30 Panjang 1 m
PPA PPA3 Pipa tanah dia. 15 cm
PPA PPA4 Pipa tanah dia. 20 cm
PPA PPA5 Pipa galvanis dia. 1/2"
PPA PPA6 Pipa galvanis dia. 3/4"
PPA PPA7 Pipa galvanis dia. 1"
PPA PPA8 Pipa galvanis dia. 1 1/2"
PPA PPA9 Pipa galvanis dia. 3"
PPA PPA10 Pipa galvanis dia. 4"
PPA PPA11 Riol 20 cm
PPA PPA12 Riol RCP Ø 60 t 10 cm
PPA PPA13 BAHAN PLASTIK
PPA PPA14 Pipa PVC abu-abu dia. 1/2" Wavin
PPA PPA15 Pipa PVC abu-abu dia. 3/4" Wavin
PPA PPA16 Pipa PVC abu-abu dia. 1" Wavin
PPA PPA17 Pipa PVC abu-abu dia. 1 1/2" Wavin
PPA PPA18 Pipa PVC abu-abu dia. 2" Wavin
KODE NO. NAMA BARANG / BAHAN / TENAGA
PPA PPA19 Pipa PVC abu-abu dia. 2 1/2" Wavin
PPA PPA20 Pipa PVC abu-abu dia. 3" Wavin
PPA PPA21 Pipa PVC abu-abu dia. 4" Wavin
ALT ALAT
ALT ALT1 Crane Kap. 35 ton
ALT ALT2 Crane Kap. 10-15 Ton
ALT ALT3 Hammer + Pile driver
ALT ALT4 Crawler Crane Kap. 35 ton
ALT ALT5 Alat Pancang Pile Compactor
ALT ALT6 Generator 150 kVA
ALT ALT7 Piling Barge Driving
ALT ALT8 Ponton Kap. 1000 ton
ALT ALT9 Work Boat
ALT ALT10 Kotrek 2,5 ton
ALT ALT11 Kunci
ALT ALT12 Perancah
ALT ALT13 Waterpass
ALT ALT14 Theodolite
ALT ALT15 Genset
ALT ALT16 Bor beton
ALT ALT17 Sewa alat las
ALT ALT18 Sewa alat sondir
ALT ALT19 Sewa alat perakitan tulangan
ALT ALT20 Sewa Scaffolding
ALT ALT21 Biaya tes beton per benda uji
ALT ALT22 Vienetions dan vertikal blinds (tirai)
ALT ALT23 Karpet
ALT ALT24 Biaya analisis tes beton perbeda uji
ALT ALT25 Sewa Compressor untuk pekerjaan grouting
ALT ALT26 Sewa Mesin Grouting
ALT ALT27 Sewa mesin gerinda untuk pekerjaan grouting
ALT ALT28 Sewa mixer ubtuk pekerjaan grouting
ALT ALT29 Sewa alar bor
ALT ALT30 Sewa Alat Ukur
ALT ALT31 Sewa Motor Walls
ALT ALT32 Alat bantu pekerjaan grouting
ALT ALT33 Alat bantu pekerjaan pekerjaan marka
ALT ALT34 Alat bantu pekerjaan pekerjaan expantion joint
ALT ALT35 Waterstop lebar 230 mm - 320 mm
ALT ALT36 Waterstop lebar 200 mm
ALT ALT37 Waterstop lebar 150 mm
ALT37
HARGA SATUAN
SATUAN
(Rp.)
OH 80,000
OH 80,000
OH 80,000
OH 80,000
OH 80,000
OH 80,000
OH 80,000
OH
OH
OH
OH
OH 90,000
OH
OH 55,000
OH 80,000
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
lbr
lbr
HARGA SATUAN
SATUAN
(Rp.)
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
kg 9,400
kg
kg
kg
bh
m1
kg
ltr
bh
bh
bh
bh
bh
bh
m2
bh
lbr
bh
bh
bh
bh
bh
bh
m2
HARGA SATUAN
SATUAN
(Rp.)
m'
kg
m2
m2
bh
m'
m2
bh
lbr 51,000.00
lbr
lbr
lbr
m2
m2
m1
ltr
ltr 18,900.00
ltr 6,000
ltr
ltr
ltr
kg
kg
ltr
kg
kg
box
ltr
ltr
kg 11,600
kg 12,300
kg
kg
HARGA SATUAN
SATUAN
(Rp.)
kg 12,500.00
ml
ml
kg 12,100
kg
kg 13,300
kg 12,100
kg 13,300
kg
Kg
bh
unit
m1
bh
tube 7,500.00
ml
kg
m2 239,400.00
kg 20,000
kg
m2
m2
kg
kg
kg
kg
m2 20,000
m1
m1
m2
m1
m1
bh
m2
m2
m2
m2
m2
m2
HARGA SATUAN
SATUAN
(Rp.)
m2
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
m3
m3
kg
m1
lbr
btg
m'
m'
m3 195,300.00
Kg
m3
m2
m3
m2 72,000
m2 66,000
m2
m2
m2
m2
bh
bh
kg
HARGA SATUAN
SATUAN
(Rp.)
m3 288,000
m3 276,000
m 3
m2
m2
bh 600
m 3
214,200
m3 214,200
m3 214,200
m 3
214,200
m3 214,200
m3
m3
m3
m3
m3 94,500
m3 120,000
m3 120,000
m3
m3 170,100
m3
m3
m3 214,200
m3 214,200
bj
bj
m3
m3 100,800
m3 100,800
m3 110,900.00
bh
bh
bh
bh
kg 35,300
kg 24,000
HARGA SATUAN
SATUAN
(Rp.)
kg 35,300
kg
kg
kg 51,800
kg 59,200
kg
kg 22,700.00
kg
kg
ltr
ltr
ltr 44,100.00
ltr 12,000
ltr 12,000
bh
bh
bh 7,800
bh 4,800
kg
kg
lbr
kg
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
m2 193,600.00
m2
m2
HARGA SATUAN
SATUAN
(Rp.)
buah
buah
m'
buah
buah
buah
buah
m1
m1
kg
m
m2
m2
m2
m2 60,900.00
m2
lbr
ml
bh 31,500.00
bh 22,100.00
bh 16,800.00
bh 12,600.00
bh
bh
bh
bh
bh
bh 69,300.00
bh 157,500.00
bh 69,300.00
bh 69,300.00
bh 8,200.00
bh
bh
bh
bh
bh
HARGA SATUAN
SATUAN
(Rp.)
bh
m3
m3
kg
lbr 68,000.00
roll
m1
m1
m1
lbr 63,000.00
lbr 78,800.00
m3 5,937,500
m 3
15,625,000
m3 9,200,000
m3 9,200,000
m 3
m3 5,937,500
btg 15,800
btg
m3
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr 56,100.00
lbr 62,400.00
lbr
lbr
lbr 79,200
HARGA SATUAN
SATUAN
(Rp.)
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
bh
m2
bh
bh
bh
m2
bh
m3
titik
ls
roll
roll 498,800.00
roll 354,400.00
m' 498,800.00
m' 354,400.00
m1
m1
m1
HARGA SATUAN
SATUAN
(Rp.)
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
buah
buah
buah
buah
m'
unit / ls
titik
set
unit
jam
bh
bh
bh
bh 3,900.00
bh 17,100.00
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
HARGA SATUAN
SATUAN
(Rp.)
hr
tb
bh
kg
kg
kg
kg
kg
kg
kg
bh
kg 16,300
bh
bh
bh
kg
kg
kg
kg
kg 16,300.00
m
m
bh
bh
m1
m1
m1
m1
m1
m1
bh
bh 820,000.00
btg 13,700.00
btg 18,900.00
btg 25,900.00
btg 44,500.00
btg 56,900.00
HARGA SATUAN
SATUAN
(Rp.)
btg 83,100.00
btg 112,100.00
btg 185,800.00
kg 1,375
kg 1,875
kg
kg
kg
kg
kg
m3
bh 459,400.00
bh 360,900.00
bh
bh
set 1,890,000.00
bh 113,400.00
set 535,500.00
bh
bh
bh
set
set
set
bh 19,700.00
bh
bh 78,100.00
bh 206,700.00
set
bh 52,500.00
btg
m2
m2
m3
HARGA SATUAN
SATUAN
(Rp.)
kg
m2
hari 3,900,000.00
hari 2,800,000.00
hari 1,850,000.00
hari
hari
hari
hari
hari 4,000,000.00
hari 1,000,000.00
bh 200,000.00
set 125,000.00
hari 350,000.00
unit
unit
hari 275,000.00
hari
hr
hr
hr
unit
bh
m2
m2
bh
hr
hr
hr
hr
hr
hr
hr
ls
ls
ls
m'
m'
m'
PEKERJAAN
LOKASI
TAHUN
PEKERJAAN PERSIAPAN
PPS2 1 M' Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
Kayu meranti balok 0.0120 m3 X Rp. 9,200,000.00 110,400.00
Paku reng 55 x 3,1 mm 0.0200 kg X Rp. - 0.00
Kayu meranti papan 0.0070 m3 X Rp. 9,200,000.00 64,400.00
Tukang kayu 0.1000 OH X Rp. 80,000.00 8,000.00
Kepala tukang 0.0100 OH X Rp. 90,000.00 900.00
Pekerja 0.1000 OH X Rp. 55,000.00 5,500.00
Mandor 0.0050 OH X Rp. 80,000.00 400.00
JUMLAH 14,800.00 174,800.00 189,600.00
PPS7 1 M' Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
Kayu dolken Ø 8 - 10 /4 00 cm 1.2500 btg X Rp. - 0.00
Portland Cement (PC) 2.5000 kg X Rp. 1,375.00 3,437.50
Seng gelombang 2" - 5" BJLS 24 1.2000 lbr X Rp. - 0.00
Pasir beton 0.0050 m3 X Rp. 120,000.00 600.00
Krikil beton 0.0090 m3 X Rp. 170,100.00 1,530.90
Kayu meranti balok 0.0250 m3 X Rp. 9,200,000.00 230,000.00
Paku biasa 0.0600 kg X Rp. 16,300.00 978.00
Cat dasar meni 0.4000 kg X Rp. 35,300.00 14,120.00
Tukang kayu 0.2000 OH X Rp. 80,000.00 16,000.00 16,000.00
Kepala tukang 0.0200 OH X Rp. 90,000.00 1,800.00 1,800.00
Pekerja 0.4000 OH X Rp. 55,000.00 22,000.00 22,000.00
Mandor 0.0200 OH X Rp. 80,000.00 1,600.00 1,600.00
JUMLAH 41,400.00 292,066.40 333,466.40
PPS8 1 M' Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter
Kayu dolken Ø 8 - 10 /4 00 cm 1.0000 btg X Rp. - 0.00
Portland Cement (PC) 2.0000 kg X Rp. 1,375.00 2,750.00
Kawat duri 25.0000 kg X Rp. - 0.00
Pasir beton 0.0050 m3 X Rp. 120,000.00 600.00
Krikil beton 0.0090 m3 X Rp. 170,100.00 1,530.90
Paku biasa 0.0600 kg X Rp. 16,300.00 978.00
Tukang kayu 0.2000 OH X Rp. 80,000.00 16,000.00
Kepala tukang 0.0200 OH X Rp. 90,000.00 1,800.00
Pekerja 0.3000 OH X Rp. 55,000.00 16,500.00
Mandor 0.0200 OH X Rp. 80,000.00 1,600.00
JUMLAH 35,900.00 5,858.90 41,758.90
PEKERJAAN TANAH
PTN10 1 m3 Urug kembali bekas galian (dihitung 1/3 kali galian tanah)
Pekerja 0.2500 org X Rp. 55,000.00 13,750.00
Mandor 0.0083 org X Rp. 80,000.00 664.00
JUMLAH 14,414.00 14,414.00
PEKERJAAN PASANGAN
Pasangan pondasi
PPO14 1 M3 Beton cyclope 60% beton camp. 1pc:2ps:3kr, 40% batu belah
Batu belah putih 0.4800 m3 X Rp. - 0.00
Portland Cement (PC) 194.0000 kg X Rp. 1,375.00 266,750.00
Pasir beton 0.3120 m3 X Rp. 120,000.00 37,440.00
Krikil beton 0.4680 m3 X Rp. 170,100.00 79,606.80
Besi beton polos 126.0000 kg X Rp. 11,600.00 1,461,600.00
Kawat beton / bindrat 1.8000 kg X Rp. 20,000.00 36,000.00
Tukang batu 0.8500 org X Rp. 80,000.00 68,000.00
Kepala Tukang 0.0850 org X Rp. 90,000.00 7,650.00
Pekerja 3.4000 org X Rp. 55,000.00 187,000.00
Mandor 0.1700 org X Rp. 80,000.00 13,600.00
JUMLAH 276,250.00 1,881,396.80 2,157,646.80
PASANGAN DINDING
PEKERJAAN BETON
PBT3 1 M3 Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Portland Cement (PC) 247.000 kg X Rp. 1,375.00 339,625.00
Pasir beton 0.621 m3 X Rp. 120,000.00 74,485.71
Split D 1 - 2 cm 0.740 m3 X Rp. 214,200.00 158,508.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 572,618.71 694,443.71
PBT4 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Portland Cement (PC) 276.000 kg X Rp. 1,375.00 379,500.00
Pasir beton 0.591 m3 X Rp. 120,000.00 70,971.43
Split D 1 - 2 cm 0.750 m3 X Rp. 214,200.00 160,570.67
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 611,042.10 732,867.10
PBT5 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Portland Cement (PC) 299.000 kg X Rp. 1,375.00 411,125.00
Pasir beton 0.571 m3 X Rp. 120,000.00 68,485.71
Split D 1 - 2 cm 0.753 m3 X Rp. 214,200.00 161,364.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 640,974.71 762,799.71
PBT6 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87
Portland Cement (PC) 230.000 kg X Rp. 1,375.00 316,250.00
Pasir beton 0.638 m3 X Rp. 120,000.00 76,542.86
Split D 1 - 2 cm 0.761 m3 X Rp. 214,200.00 162,950.67
Pekerja 1.200 OH X Rp. 55,000.00 66,000.00
Tukang Batu 0.200 OH X Rp. 80,000.00 16,000.00
Kepala Tukang 0.020 OH X Rp. 90,000.00 1,800.00
Mandor 0.060 OH X Rp. 80,000.00 4,800.00
JUMLAH 88,600.00 555,743.52 644,343.52
PBT7 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Portland Cement (PC) 326.000 kg X Rp. 1,375.00 448,250.00
Pasir beton 0.543 m3 X Rp. 120,000.00 65,142.86
Split D 1 - 2 cm 0.762 m3 X Rp. 214,200.00 163,268.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 676,660.86 798,485.86
PBT8 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Portland Cement (PC) 352.000 kg X Rp. 1,375.00 484,000.00
Pasir beton 0.522 m3 X Rp. 120,000.00 62,657.14
Split D 1 - 2 cm 0.764 m3 X Rp. 214,200.00 163,585.33
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 710,242.48 832,067.48
PBT9 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Portland Cement (PC) 371.000 kg X Rp. 1,375.00 510,125.00
Pasir beton 0.499 m3 X Rp. 120,000.00 59,828.57
Split D 1 - 2 cm 0.776 m3 X Rp. 214,200.00 166,124.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 736,077.57 857,902.57
PBT10 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Portland Cement (PC) 384.000 kg X Rp. 1,375.00 528,000.00
Pasir beton 0.494 m3 X Rp. 120,000.00 59,314.29
Split D 1 - 2 cm 0.770 m3 X Rp. 214,200.00 164,854.67
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 752,168.95 873,993.95
PBT11 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Portland Cement (PC) 406.000 kg X Rp. 1,375.00 558,250.00
Pasir beton 0.489 m3 X Rp. 120,000.00 58,628.57
Split D 1 - 2 cm 0.760 m3 X Rp. 214,200.00 162,792.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 779,670.57 901,495.57
PBT12 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Portland Cement (PC) 413.000 kg X Rp. 1,375.00 567,875.00
Pasir beton 0.486 m3 X Rp. 120,000.00 58,371.43
Split D 1 - 2 cm 0.756 m3 X Rp. 214,200.00 161,998.67
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00 788,245.10 910,070.10
PBT13 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Portland Cement (PC) 439.000 kg X Rp. 1,375.00 603,625.00
Pasir beton 0.479 m3 X Rp. 120,000.00 57,428.57
Split D 1 - 2 cm 0.745 m3 X Rp. 214,200.00 159,618.67
Pekerja 2.100 OH X Rp. 55,000.00 115,500.00
Tukang Batu 0.350 OH X Rp. 80,000.00 28,000.00
Kepala Tukang 0.035 OH X Rp. 90,000.00 3,150.00
Mandor 0.105 OH X Rp. 80,000.00 8,400.00
JUMLAH 155,050.00 820,672.24 975,722.24
PBT14 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Portland Cement (PC) 448.000 kg X Rp. 1,375.00 616,000.00
Pasir beton 0.476 m3 X Rp. 120,000.00 57,171.43
Split D 1 - 2 cm 0.741 m3 X Rp. 214,200.00 158,666.67
Pekerja 2.100 OH X Rp. 55,000.00 115,500.00
Tukang Batu 0.350 OH X Rp. 80,000.00 28,000.00
Kepala Tukang 0.035 OH X Rp. 90,000.00 3,150.00
Mandor 0.105 OH X Rp. 80,000.00 8,400.00
JUMLAH 155,050.00 831,838.10 986,888.10
PBT37 1 m' Pembuatan tiang pancang (40 x 40) cm, beton bertulang
Pasir urug darat 0.0190 m3 X Rp. 94,500.00 1,795.50
Pasir beton 0.0940 m3 X Rp. 120,000.00 11,280.00
Batu pecah 2/3 ( split ) 0.1500 m3 X Rp. 214,200.00 32,130.00
Portland Cement (PC) 60.5000 kg X Rp. 1,375.00 83,187.50
Besi beton polos 45.0000 kg X Rp. 11,600.00 522,000.00
Kawat beton / bindrat 0.9000 kg X Rp. 20,000.00 18,000.00
Kayu meranti balok 0.0320 m3 X Rp. 9,200,000.00 294,400.00
Paku reng 55 x 3,1 mm 0.1200 kg X Rp. - 0.00
Minyak bekisting 0.0900 ltr X Rp. - 0.00
Plamur Fuji 0.2400 kg X Rp. - 0.00
Tukang batu 0.6700 org X Rp. 80,000.00 53,600.00
Kepala tukang 0.0670 org X Rp. 90,000.00 6,030.00
Pekerja 1.0000 org X Rp. 55,000.00 55,000.00
Mandor 0.0500 org X Rp. 80,000.00 4,000.00
JUMLAH 118,630.00 962,793.00 1,081,423.00
PBT38 1 m' Pembuatan tiang pancang (35 x 35) cm, beton bertulang
Pasir urug darat 0.0160 m3 X Rp. 94,500.00 1,512.00
Pasir beton 0.0800 m3 X Rp. 120,000.00 9,600.00
Batu pecah 2/3 ( split ) 0.1250 m3 X Rp. 214,200.00 26,775.00
Portland Cement (PC) 49.0000 kg X Rp. 1,375.00 67,375.00
Besi beton polos 34.5000 kg X Rp. 11,600.00 400,200.00
Kawat beton / bindrat 0.7000 kg X Rp. 20,000.00 14,000.00
Kayu meranti balok 0.0270 m3 X Rp. 9,200,000.00 248,400.00
Paku reng 55 x 3,1 mm 0.1200 kg X Rp. - 0.00
Minyak bekisting 0.0900 ltr X Rp. - 0.00
Plamur Fuji 0.2000 kg X Rp. - 0.00
Tukang batu 0.5000 org X Rp. 80,000.00 40,000.00
Kepala tukang 0.0500 org X Rp. 90,000.00 4,500.00
Pekerja 0.8000 org X Rp. 55,000.00 44,000.00
Mandor 0.0400 org X Rp. 80,000.00 3,200.00
JUMLAH 91,700.00 767,862.00 859,562.00
PEKERJAAN PELESTERAN
PPT16 1 m2 Acian
Portland Cement (PC) 3.2500 kg X Rp. 1,375.00 4,468.75
Tukang Batu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.2000 org X Rp. 55,000.00 11,000.00
Mandor 0.0100 org X Rp. 80,000.00 800.00
JUMLAH 20,700.00 4,468.75 25,168.75
PEKERJAAN KERAMIK
PPL44 1 m' Pasang plint kayu klas II tebal 2cm, lebar 10cm
Papan kayu damar laut 0.0030 m3 X Rp. - 0.00
Paku skrup 0.0500 kg X Rp. - 0.00
Tukang Kayu 0.1200 org X Rp. 80,000.00 9,600.00
Kepala Tukang 0.0120 org X Rp. 90,000.00 1,080.00
Pekerja 0.1200 org X Rp. 55,000.00 6,600.00
Mandor 0.0060 org X Rp. 80,000.00 480.00
JUMLAH 17,760.00 0.00 17,760.00
PCB1 1 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
Tipe segi empat, uni, segi 6 tebal = 8 cm K 400 1.0000 m2 X Rp. - 0.00
Pasir urug darat 0.0500 m3 X Rp. 94,500.00 4,725.00
Tukang batu 0.2500 org X Rp. 80,000.00 20,000.00
Kepala Tukang 0.0250 org X Rp. 90,000.00 2,250.00
Pekerja 0.5000 org X Rp. 55,000.00 27,500.00
Mandor 0.0250 org X Rp. 80,000.00 2,000.00
JUMLAH 51,750.00 4,725.00 56,475.00
PCB3 1 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400
Tipe segi empat, uni, segi 6 tebal = 8 cm K 400 1.0000 m2 X Rp. - 0.00
Pasir urug darat 0.0500 m3 X Rp. 94,500.00 4,725.00
Tukang batu 0.2500 org X Rp. 80,000.00 20,000.00
Kepala Tukang 0.0250 org X Rp. 90,000.00 2,250.00
Pekerja 0.5000 org X Rp. 55,000.00 27,500.00
Mandor 0.0250 org X Rp. 80,000.00 2,000.00
JUMLAH 51,750.00 4,725.00 56,475.00
PEKERJAAN KAYU
Pasang gording
PKY3 1 m2 Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar laut
Kayu meranti balok 0.0140 m3 X Rp. 9,200,000.00 128,800.00
Damar Laut (Kelas I) 0.0036 m3 X Rp. 15,625,000.00 56,250.00
Paku biasa 1/2" - 1" 0.1500 kg X Rp. 16,300.00 2,445.00
Paku reng 55 x 3,1 mm 0.1000 kg X Rp. - 0.00
Tukang Kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.1000 org X Rp. 55,000.00 5,500.00
Mandor 0.0050 org X Rp. 80,000.00 400.00
JUMLAH 14,800.00 187,495.00 202,295.00
PKY4 1 m2 Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar laut
Kayu meranti balok 0.0140 m3 X Rp. 9,200,000.00 128,800.00
Damar Laut (Kelas I) 0.0072 m3 X Rp. 15,625,000.00 112,500.00
Paku usuk 80 x 3,8 mm 0.1500 kg X Rp. - 0.00
Paku reng 55 x 3,1 mm 0.1000 kg X Rp. - 0.00
Tukang Kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.1000 org X Rp. 55,000.00 5,500.00
Mandor 0.0050 org X Rp. 80,000.00 400.00
JUMLAH 14,800.00 241,300.00 256,100.00
Rangka langit-langit
Pasang Listplank
PKY24 1 m2 Membuat daun pintu kayu lapis plywood rangkap, rangka tertutup kayu
Kayu meranti papan 0.0250 m3 X Rp. 9,200,000.00 230,000.00
Paku biasa 1/2" - 1" 0.0300 kg X Rp. 16,300.00 489.00
Lem kayu (putih) Fox 0.5000 kg X Rp. - 0.00
Plywood 4 mm 1.0000 lbr X Rp. - 0.00
Tukang kayu 2.1000 org X Rp. 80,000.00 168,000.00
Kepala tukang 0.2100 org X Rp. 90,000.00 18,900.00
Pekerja 0.7000 org X Rp. 55,000.00 38,500.00
Mandor 0.0350 org X Rp. 80,000.00 2,800.00
JUMLAH 228,200.00 230,489.00 458,689.00
PBS9 1 unit Grill dari besi beton Ǿ 16mm rangka baja 50.50.5 uk 1 x 1 m
Besi siku rata-rata 24.1280 kg X Rp. 13,300.00 320,902.40
Besi beton polos 31.6000 kg X Rp. 11,600.00 366,560.00
Besi angkur dia. 8mm 2.0000 bh X Rp. - 0.00
Cat dasar meni 1.8850 m2 X Rp. 35,300.00 66,540.50
Tukang Las 0.1000 oh X Rp. 80,000.00 8,000.00
Pekerja 1.0000 oh X Rp. 55,000.00 55,000.00
JUMLAH 63,000.00 754,002.90 817,002.90
PBS11 1 m2 Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Besi siku rata-rata 15.0000 kg X Rp. 13,300.00 199,500.00
Plat baja t = 3 mm 32.8000 kg X Rp. - 0.00
Kawat las 0.0500 kg X Rp. - 0.00
Tukang las 1.0500 org X Rp. 80,000.00 84,000.00
Kepala tukang 0.1050 org X Rp. 90,000.00 9,450.00
Pekerja 1.0500 org X Rp. 55,000.00 57,750.00
Mandor 0.0520 org X Rp. 80,000.00 4,160.00
JUMLAH 155,360.00 199,500.00 354,860.00
PBS25 1 m' Pasang talang datar/jurai, seng plat BJLS 28 lebar 90 cm, papan Kayu jati
Seng plat 3" x 6" BJLS 28 1.0500 m1 X Rp. - 0.00
Paku biasa 1/2" - 1" 0.0150 kg X Rp. 16,300.00 244.50
Kayu meranti papan 0.0190 m3 X Rp. 9,200,000.00 174,800.00
Tukang kayu 0.4000 org X Rp. 80,000.00 32,000.00
Kepala tukang 0.0250 org X Rp. 90,000.00 2,250.00
Pekerja 0.2000 org X Rp. 55,000.00 11,000.00
Mandor 0.0100 org X Rp. 80,000.00 800.00
JUMLAH 46,050.00 175,044.50 221,094.50
PBS26 1 m' Pasang talang ½ lingkaran D - 15 cm, seng plat BJLS 30 lebar 45 cm
Seng plat 3" x 6" BJLS 28 1.0500 lbr X Rp. - 0.00
Paku biasa 1/2" - 1" 0.0100 kg X Rp. 16,300.00 163.00
Besi strip 0.5000 kg X Rp. 13,300.00 6,650.00
Tukang kayu 0.3000 org X Rp. 80,000.00 24,000.00
Kepala tukang 0.0300 org X Rp. 90,000.00 2,700.00
Pekerja 0.1500 org X Rp. 55,000.00 8,250.00
Mandor 0.0075 org X Rp. 80,000.00 600.00
JUMLAH 35,550.00 6,813.00 42,363.00
PEKERJAAN ATAP
PAT6 1 m2 Langit-langit triplek ukuran (120 x 240) cm tebal 3mm, 4mm, dan 6 mm
Triplek 0.3750 lbr X Rp. 62,400.00 23,400.00
Paku triplek 0.0300 kg X Rp. - 0.00
Tukang kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.1000 org X Rp. 55,000.00 5,500.00
Mandor 0.0050 org X Rp. 80,000.00 400.00
JUMLAH 14,800.00 23,400.00 38,200.00
PAT16 1 m 2 P asang gent eng bet on besar Nat ural ( i si 9 / m 2 ) unt uk rumah ti ngkat
Genteng beton besar natural 1m 9 biji 9.0000 bh X Rp. - 0.00
Tukang batu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.3000 org X Rp. 55,000.00 16,500.00
Mandor 0.0150 org X Rp. 80,000.00 1,200.00
JUMLAH 26,600.00 0.00 26,600.00
PAT18 1 m 2 P asang gent eng bet on besar Warna ( i si 9 / m2 ) untuk rumah ti ngkat
Genteng beton besar warna 1m 9 biji 9.0000 bh X Rp. - 0.00
Tukang batu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.3000 org X Rp. 55,000.00 16,500.00
Mandor 0.0150 org X Rp. 80,000.00 1,200.00
JUMLAH 26,600.00 0.00 26,600.00
PAT20 1 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
Genteng beton besar natural 1m 9 biji 14.5000 bh X Rp. - 0.00
Tukang batu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.3000 org X Rp. 55,000.00 16,500.00
Mandor 0.0150 org X Rp. 80,000.00 1,200.00
JUMLAH 26,600.00 0.00 26,600.00
PAT36 1 m2 Pasang atap genteng metal zinc alume type prima roof
Genteng metal 1.0200 m2 X Rp. - 0.00
Paku anti karat 0.2000 kg X Rp. - 0.00
Tukang kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.2000 org X Rp. 55,000.00 11,000.00
Mandor 0.0010 org X Rp. 80,000.00 80.00
JUMLAH 19,980.00 0.00 19,980.00
PEKERJAAN PENGECATAN
PPC3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
Sabun deterjen 0.0500 kg X Rp. - 0.00
Pekerja 0.1500 org X Rp. 55,000.00 8,250.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 8,450.00 0.00 8,450.00
PPC6 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Cat dasar meni kayu 0.2000 kg X Rp. 35,300.00 7,060.00
Plamur Fuji 0.1500 kg X Rp. - 0.00
Cat dasar meni kayu 0.1700 kg X Rp. 35,300.00 6,001.00
Cat penutup 0.2600 kg X Rp. 51,800.00 13,468.00
Tukang cat 0.0900 org X Rp. 80,000.00 7,200.00
Kepala tukang 0.0060 org X Rp. 90,000.00 540.00
Pekerja 0.0700 org X Rp. 55,000.00 3,850.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 4,590.00 33,729.00 38,319.00
PPC7 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
Cat dasar meni kayu 0.2000 kg X Rp. 35,300.00 7,060.00
Plamur Fuji 0.1500 kg X Rp. - 0.00
Cat kayu 0.1700 kg X Rp. 59,200.00 10,064.00
Cat penutup 0.3500 kg X Rp. 51,800.00 18,130.00
Tukang cat 0.1050 org X Rp. 80,000.00 8,400.00
Kepala tukang 0.0040 org X Rp. 90,000.00 360.00
Pekerja 0.0700 org X Rp. 55,000.00 3,850.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 12,810.00 35,254.00 48,064.00
PPC12 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Plamur Fuji 0.1000 kg X Rp. - 0.00
Cat dasar meni kayu 0.1000 kg X Rp. 35,300.00 3,530.00
Cat penutup 0.2600 kg X Rp. 51,800.00 13,468.00
Tukang cat 0.0630 org X Rp. 80,000.00 5,040.00
Kepala tukang 0.0063 org X Rp. 90,000.00 567.00
Pekerja 0.0200 org X Rp. 55,000.00 1,100.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 6,907.00 16,998.00 23,905.00
PPC13 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Cat dasar meni kayu 0.1200 kg X Rp. 35,300.00 4,236.00
Cat penutup 0.1800 kg X Rp. 51,800.00 9,324.00
Tukang cat 0.0420 org X Rp. 80,000.00 3,360.00
Kepala tukang 0.0042 org X Rp. 90,000.00 378.00
Pekerja 0.0280 org X Rp. 55,000.00 1,540.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 5,478.00 13,560.00 19,038.00
PPC17 1 m2 Melamin
Cat tembok melamin 0.2000 kg X Rp. 24,000.00 4,800.00
Kuas ukuran 3,5" 0.0150 bh X Rp. - 0.00
Pekerja 0.2000 org X Rp. 55,000.00 11,000.00
Tukang cat 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0050 org X Rp. 90,000.00 450.00
Mandor 0.0005 org X Rp. 80,000.00 40.00
JUMLAH 19,490.00 4,800.00 24,290.00
PEKERJAAN BONGKARAN
PBK10 1 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
Tukang kayu 6.0000 org X Rp. 80,000.00 480,000.00
Kepala Tukang 0.6000 org X Rp. 90,000.00 54,000.00
Pekerja 4.0000 org X Rp. 55,000.00 220,000.00
Mandor 0.2000 org X Rp. 80,000.00 16,000.00
JUMLAH 770,000.00 0.00 770,000.00
PBK11 1 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
Pekerja 1.0000 org X Rp. 55,000.00 55,000.00
Mandor 0.2000 org X Rp. 80,000.00 16,000.00
JUMLAH 71,000.00 0.00 71,000.00
PEKERJAAN SANITASI
PSI9 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
Pipa tanah dia. 15 cm 1.6000 bh X Rp. - 0.00
Portland Cement (PC) 0.6800 kg X Rp. 1,375.00 935.00
Pasir pasang ( progo ) 0.0130 m3 X Rp. 120,000.00 1,560.00
Pasir urug darat 0.0110 m3 X Rp. 94,500.00 1,039.50
Tukang batu 0.0300 org X Rp. 80,000.00 2,400.00
Kepala tukang 0.0030 org X Rp. 90,000.00 270.00
Pekerja 0.0600 org X Rp. 55,000.00 3,300.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 6,170.00 3,534.50 9,704.50
PSI10 1 m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
Pipa tanah dia. 20 cm 1.6000 bh X Rp. - 0.00
Portland Cement (PC) 0.8700 kg X Rp. 1,375.00 1,196.25
Pasir pasang ( progo ) 0.0140 m3 X Rp. 120,000.00 1,680.00
Pasir urug darat 0.1400 m3 X Rp. 94,500.00 13,230.00
Tukang batu 0.0400 org X Rp. 80,000.00 3,200.00
Kepala tukang 0.0040 org X Rp. 90,000.00 360.00
Pekerja 0.0800 org X Rp. 55,000.00 4,400.00
Mandor 0.0070 org X Rp. 80,000.00 560.00
JUMLAH 8,520.00 16,106.25 24,626.25
PSI13 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
Batu merah ( 5x11x23 ) 87.0000 bh X Rp. - 0.00
Portland Cement (PC) 44.0000 kg X Rp. 1,375.00 60,500.00
Pasir pasang ( progo ) 0.0700 m3 X Rp. 120,000.00 8,400.00
Krikil beton 0.0700 m3 X Rp. 170,100.00 11,907.00
Besi beton polos 1.6000 kg X Rp. 11,600.00 18,560.00
Pasir beton 0.0600 m3 X Rp. 120,000.00 7,200.00
Tukang batu 1.0150 org X Rp. 80,000.00 81,200.00
Kepala tukang 0.0015 org X Rp. 90,000.00 135.00
Pekerja 3.2000 org X Rp. 55,000.00 176,000.00
Mandor 0.0160 org X Rp. 80,000.00 1,280.00
JUMLAH 258,615.00 106,567.00 365,182.00
PSI14 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Batu merah ( 5x11x23 ) 150.0000 bh X Rp. - 0.00
Portland Cement (PC) 77.0000 kg X Rp. 1,375.00 105,875.00
Pasir pasang ( progo ) 0.1300 m3 X Rp. 120,000.00 15,600.00
Krikil beton 0.0200 m3 X Rp. 170,100.00 3,402.00
Besi beton polos 2.6000 kg X Rp. 11,600.00 30,160.00
Pasir beton 0.0900 m3 X Rp. 120,000.00 10,800.00
Tukang batu 0.4730 org X Rp. 80,000.00 37,840.00
Kepala tukang 0.0470 org X Rp. 90,000.00 4,230.00
Pekerja 1.4200 org X Rp. 55,000.00 78,100.00
Mandor 0.0710 org X Rp. 80,000.00 5,680.00
JUMLAH 125,850.00 165,837.00 291,687.00
PSI15 1 bh Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm
Batu merah ( 5x11x23 ) 222.0000 bh X Rp. - 0.00
Portland Cement (PC) 114.0000 kg X Rp. 1,375.00 156,750.00
Pasir pasang ( progo ) 0.1840 m3 X Rp. 120,000.00 22,080.00
Krikil beton 0.0330 m3 X Rp. 170,100.00 5,613.30
Besi beton polos 4.8500 kg X Rp. 11,600.00 56,260.00
Pasir beton 0.1200 m3 X Rp. 120,000.00 14,400.00
Tukang batu 0.7200 org X Rp. 80,000.00 57,600.00
Kepala tukang 0.0720 org X Rp. 90,000.00 6,480.00
Pekerja 2.1600 org X Rp. 55,000.00 118,800.00
Mandor 0.1000 org X Rp. 80,000.00 8,000.00
JUMLAH 190,880.00 255,103.30 445,983.30
PEKERJAAN TAMAN
PTM1 10 m2 Penyapuan Jalan Dan Trotoar
Sapu lidi 447.00 bh X Rp. - 0.00
Tangkai Sapu 14.00 bh X Rp. - 0.00
Serok 8.0000 bh X Rp. - 0.00
Seragam 16.00 bh X Rp. - 0.00
Sarung tangan 14.00 bh X Rp. 3,900.00 54,600.00
Masker 14.00 bh X Rp. 17,100.00 239,400.00
Gerobak (sewa) 4.00 bh X Rp. - 0.00
Pekerja 2,555.00 org X Rp. 55,000.00 140,525,000.00
Mandor 365.00 org X Rp. 80,000.00 29,200,000.00
JUMLAH 169,725,000.00 294,000.00 170,019,000.00
BIAYA TI AP 1M2 / HA RI :
/ 3,650,000.00 46.50 0.08 46.58
SPL9 1 M2 Mengerjakan lantai jembatan (papan yang dipakukan diatas gelagar kayu) :
Paku biasa 1/2" - 1" 0.075 kg X Rp. 16,300.00 1,222.50
Papan kayu damar laut 0.025 X Rp. - 0.00
Tukang kayu 0.500 org/hr X Rp. 80,000.00 40,000.00
Kepala tukang 0.050 org/hr X Rp. 90,000.00 4,500.00
Pekerja 0.200 org/hr X Rp. 55,000.00 11,000.00
Mandor 0.010 org/hr X Rp. 80,000.00 800.00
JUMLAH 56,300.00 1,222.50 57,522.50
SPL11 1 M2 memasang lantai cone block t.10 cm dipadatkan denganVibratory Roller kapasitas 10-15 ton
Conblock t=10 cm 44.000 Bh X Rp. - 0.00
Pasir pasang ( progo ) 0.050 M3 X Rp. 120,000.00 6,000.00
Pasir pasang ( krasak ) 0.015 M3 X Rp. - 0.00
Tukang batu 0.100 org/hr X Rp. 80,000.00 8,000.00
Pekerja 0.400 org/hr X Rp. 55,000.00 22,000.00
Kepala tukang 0.010 org/hr X Rp. 90,000.00 900.00
Mandor 0.040 org/hr X Rp. 80,000.00 3,200.00
Mesin Gilas getar otomatis 5 - 8 T 0.002 hr X Rp. 236,640.05 473.28
JUMLAH 34,573.28 6,000.00 40,573.28
SPL15 1 m2 Pasang Aluminium Composite Panel (Alucopan) : (Jumlah volume besi disesuaikan terhadap rencana design)
Al. Composite Panel (Alucopan) 1.05 m2 X Rp. 239,400.00 251,370.00
Besi Profil 30 Kg X Rp. 12,100.00 363,000.00
Ramset / dina bolt 8 Bh X Rp. - 0.00
Sewa alat las 1 ls X Rp. - 0.00
Tukang alumunium 0.5 org/hr X Rp. 80,000.00 40,000.00
Kepala Tukang 0.05 org/hr X Rp. 90,000.00 4,500.00
Pekerja 1 org/hr X Rp. 55,000.00 55,000.00
Mandor 0.05 org/hr X Rp. 80,000.00 4,000.00
JUMLAH 103,500.00 614,370.00 717,870.00
SPL19 1 bh Handling dan Transport tiang pancang dan penimbunan ke titik pancang
Pekerja 8.400 oh X Rp. 55,000.00 462,000.00
Tukang Pancang 0.800 oh X Rp. - 0.00
Alat Bantu 1.000 ls X Rp. - 0.00
JUMLAH 462,000.00 0.00 462,000.00
SPL28 1 m' Pembuatan tiang pancang (40 x 40) cm, beton bertulang
Beton mutu f’'c = 26,4 MPa (K 300) 0.1760 m3 X Rp. 910,070.10 160,172.34
Besi beton polos 30.0000 kg X Rp. 13,516.00 405,480.00
Bekisting 1.6000 m2 X Rp. 220,010.00 352,016.00
Minyak bekisting 0.1600 ltr X Rp. - 0.00
Bongkar bekisting 1.0000 ls X Rp. 220,000.00 220,000.00
JUMLAH 0.00 1,137,668.34 1,137,668.34
SPL29 1 m' Pembuatan tiang pancang (35 x 35) cm, beton bertulang
Beton mutu f’'c = 26,4 MPa (K 300) 0.1348 m3 X Rp. 910,070.10 122,631.95
Besi beton polos 20.0000 kg X Rp. 13,516.00 270,320.00
Bekisting 1.4000 m2 X Rp. 220,010.00 308,014.00
Minyak bekisting 0.1400 ltr X Rp. - 0.00
Bongkar bekisting 1.0000 ls X Rp. 220,000.00 220,000.00
JUMLAH 0.00 920,965.95 920,965.95
SPL32 1 Bh Mengebor beton dermaga untuk lobang baut fender '(dihitung 120 menit).
Tukang besi 0.250 org/hr X Rp. 80,000.00 20,000.00
Kepala tukang 0.025 org/hr X Rp. 90,000.00 2,250.00
Pekerja 0.250 org/hr X Rp. 55,000.00 13,750.00
Mandor 0.025 org/hr X Rp. 80,000.00 2,000.00
Mekanik terlatih 1.000 org/hr X Rp. - 0.00
Genset 0.250 hr X Rp. 275,000.00 68,750.00
Bor beton 0.250 hr X Rp. - 0.00
Perancah 0.250 hr X Rp. 350,000.00 87,500.00
JUMLAH 194,250.00 0.00 194,250.00
SPL38 1 m' Pekerjaan Grouting / Injeksi retakan dinding bata dengan Semen Slurry (Cebex 100)
Pipa PVC abu-abu dia. 1/2" Wavin 3.000 bh X Rp. 13,700.00 41,100.00
Nitobond EC 0.050 kg X Rp. - 0.00
Sewa Mesin Grouting 0.150 hr X Rp. - 0.00
Sewa mesin gerinda untuk pekerjaan grouting 0.075 hr X Rp. - 0.00
Alat bantu 1.000 ls X Rp. - 0.00
Tukang grouting 0.3125 org X Rp. - 0.00
Kepala Tukang 0.0312 org X Rp. 90,000.00 2,808.00
Pekerja 1.2500 org X Rp. 55,000.00 68,750.00
Mandor 0.1562 org X Rp. 80,000.00 12,496.00
JUMLAH 84,054.00 41,100.00 125,154.00
Belawan, 2012
REKAPITULASI
KODE SATUAN
PP 0
PPS1 1 M2
PPS2 1 M1
PPS3 1 M2
PPS4 1 buah
PPS5 1 M2
PPS6 1 M2
PPS7 1 M1
PPS8 1 M1
PPS9 1 M2
PPS10 1 M2
PPS11 1 M2
PPS12 1 M2
PPS13 1 M1
PTN
PTN1 1 M3
PTN2 1 M3
PTN3 1 M3
PTN4 1 M3
PTN5 1 M3
PTN6 1 M3
PTN7 1 M3
PTN8 1 M3
PTN9 1 M3
PTN10 1 M3
PTN11 1 M3
PTN12 1 M3
PTN13 1 M3
PTN14 1 M2
PTN15 1 M2
PTN16 1 M3
PTN17 1 M3
PTN18 1 Ttk
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :47
PT Pelabuhan Indonesia I (Persero)
KODE SATUAN
PTN19 1 M3
PTN20 1 M3
PPO
PPO1 1 M3
PPO2 1 M3
PPO3 1 M3
PPO4 1 M3
PPO5 1 M3
PPO6 1 M3
PPO7 1 M3
PPO8 1 M3
PPO9 1 M3
PPO10 1 M3
PPO11 1 M2
PPO12 1 M2
PPO13 1 M2
PPO14 1 M2
PPO15 1 M2
PPD
PPD1 1 M2
PPD2 1 M2
PPD3 1 M2
PPD4 1 M2
PPD5 1 M2
KODE SATUAN
PPD6 1 M2
PPD7 1 M2
PPD8 1 M2
PPD9 1 M2
PPD10 1 M2
PPD11 1 M2
PPD12 1 M2
PPD13 1 M2
PPD14 1 M2
PPD15 1 M2
PPD16 1 M2
PPD17 1 M2
PPD18 1 M2
PPD19 1 M2
PPD20 1 M2
PPD21 1 M2
PPD22 1 M2
PPD23 1 M2
PPD24 1 M2
PPD25 1 M2
PPD26 1 M2
PBT
PBT1 1 M3
PBT2 1 M3
PBT3 1 M3
PBT4 1 M3
PBT5 1 M3
PBT6 1 M3
PBT7 1 M3
PBT8 1 M3
PBT9 1 M3
PBT10 1 M3
PBT11 1 M3
PBT12 1 M3
PBT13 1 M3
KODE SATUAN
PBT14 1 M3
PBT15 1 M3
PBT16 1 M3
PBT17 1 M3
PBT18 1 M1
PBT19 1 M1
PBT20 1 M1
PBT21 1 KG
PBT22 1 KG
PBT23 1 KG
PBT24 1 KG
PBT25 1 M2
PBT26 1 M2
PBT27 1 M2
PBT28 1 M2
PBT29 1 M2
PBT30 1 M2
PBT31 1 M2
PBT32 1 M2
PBT33 1 M2
PBT34 1 M1
KODE SATUAN
PBT35 1 M1
PBT36 1 M1
PBT37 1 M1
PBT38 1 M1
PPT
PPT1 1 M2
PPT2 1 M2
PPT3 1 M2
PPT4 1 M2
PPT5 1 M2
PPT6 1 M2
PPT7 1 M2
PPT8 1 M2
PPT9 1 M2
PPT10 1 M2
PPT11 1 M2
PPT12 1 M2
PPT13 1 M2
PPT14 1 M2
PPT15 1 M2
PPT16 1 M2
PPT17 1 M2
PPT18 1 M2
PPT19 1 M2
PPL
PPL1 1 M2
PPL2 1 M2
PPL3 1 M1
PPL4 1 M1
PPL5 1 M1
PPL6 1 M1
PPL7 1 M1
PPL8 1 M1
PPL9 1 M1
KODE SATUAN
PPL10 1 M1
PPL11 1 M1
PPL12 1 M1
PPL13 1 M1
PPL14 1 M1
PPL15 1 M1
PPL16 1 M1
PPL17 1 M2
PPL18 1 M2
PPL19 1 M2
PPL20 1 M2
PPL21 1 M2
PPL22 1 M2
PPL23 1 M2
PPL24 1 M2
PPL25 1 M2
PPL26 1 M2
PPL27 1 M1
PPL28 1 M1
PPL29 1 M1
PPL30 1 M1
PPL31 1 M2
PPL32 1 M2
PPL33 1 M2
PPL34 1 M2
KODE SATUAN
PPL35 1 M2
PPL36 1 M2
PPL37 1 M2
PPL38 1 M2
PPL39 1 M2
PPL40 1 M2
PPL41 1 M2
PPL42 1 M2
PPL43 1 M1
PPL44 1 M1
PCB
PCB1 1 M2
PCB2 1 M2
PCB3 1 M2
PCB4 1 M2
PCB5 1 M2
PCB6 1 M2
PCB7 1 M3
PCB8 1 bh
PCB9 1 M3
PCB10 1 M3
PCB11 1 M3
PKY
PKY1 1 M3
PKY2 1 M3
PKY3 1 M2
PKY4 1 M2
PKY5 1 M2
PKY6 1 M2
PKY7 1 M'
PKY8 1 M'
PKY9 1 M'
PKY10 1 M'
PKY11 1 M'
PKY12 1 M'
PKY13 1 M'
PKY14 1 M2
PKY15 1 M2
PKY16 1 M2
PKY17 1 M2
KODE SATUAN
PKY18 1 M2
PKY19 1 M2
PKY20 1 M2
PKY21 1 M2
PKY22 1 M2
PKY23 1 M2
PKY24 1 M2
PKY25 1 M2
PKY26 1 M2
PKY27 1 M2
PKY28 1 M2
PBS
PBS1 1 Kg
PBS2 1 Kg
PBS3 1 Kg
PBS4 1 Kg
PBS5 1 Kg
PBS6 1 Kg
PBS7 1 Kg
PBS8 1 Unit
PBS9 1 Unit
PBS10 1 Kg
PBS11 1 M2
PBS12 1 Cm
PBS13 1 M2
PBS14 1 M2
PBS15 1 M2
PBS16 1 M2
PBS17 1 M2
PBS18 1 M2
PBS19 1 M2
PBS20 1 M2
PBS21 1 M2
PBS22 1 M2
PBS23 1 M2
PBS24 1 M2
PBS25 1 M'
KODE SATUAN
PBS26 1 M'
PAT
PAT1 1 M2
PAT2 1 M2
PAT3 1 M2
PAT4 1 M2
PAT5 1 M2
PAT6 1 M2
PAT7 1 M2
PAT8 1 M2
PAT9 1 M'
PAT10 1 M2
PAT11 1 M'
PAT12 1 M2
PAT13 1 M2
PAT14 1 M2
PAT15 1 M2
PAT16 1 M2
PAT17 1 M2
PAT18 1 M2
PAT19 1 M2
PAT20 1 M2
PAT21 1 M1
PAT22 1 M1
PAT23 1 M2
PAT24 1 M2
PAT25 1 M2
PAT26 1 M2
PAT27 1 M2
PAT28 1 M2
PAT29 1 M2
PAT30 1 M2
PAT31 1 M2
PAT32 1 M1
PAT33 1 M1
PAT34 1 M1
KODE SATUAN
PAT35 1 M1
PAT36 1 M1
PAT37 1 M1
PAT38 1 M1
PAT39 1 M1
PAT40 1 M1
PAT41 1 M2
PAT42 1 M2
PAT43 1 M2
PAT44 1 M2
PAT45 1 M'
PPC
PPC1 1 M2
KODE SATUAN
PPC2 1 M2
PPC3 1 M2
PPC4 1 M2
PPC5 1 M2
PPC6 1 M2
PPC7 1 M2
PPC8 1 M2
PPC9 1 M2
PPC10 1 M2
PPC11 1 M2
PPC12 1 M2
PPC13 1 M2
PPC14 1 M2
PPC15 1 M2
PPC16 1 M2
PPC17 1 M2
PPC18 1 M2
PPC19 1 M2
PPC20 1 M2
PPC21 1 M2
PPC22 1 M2
PPC23 2 M2
PBK
PBK1 1 M3
PBK2 1 M3
PBK3 1 M3
PBK4 1 M2
PBK5 1 M2
PBK6 1 M2
PBK7 1 M2
PBK8 1 M2
PBK9 1 M2
PBK10 1 M3
PBK11 1 M3
PBK12 1 M3
KODE SATUAN
PSN
PSN1 1 bh
PSN2 1 bh
PSN3 1 bh
PSN4 1 bh
PSN5 1 bh
PSN6 1 bh
PSN7 1 bh
PSN8 1 bh
PSN9 1 M1
PSN10 1 M1
PSN11 1 M1
PSN12 1 M1
PSN13 1 bh
PSN14 1 bh
PSN15 1 bh
PSN16 1 M1
PSN17 1 M1
PSN18 1 M1
PSN19 1 M1
PSN20 1 M1
PSN21 1 M1
PSN22 1 M1
PSN23 1 M1
PSN24 1 M1
PSN25 1 M1
KODE SATUAN
PSN26 1 M1
PSN27 1 M1
PSN28 1 M1
PSN29 1 M1
PSN30 1 bh
PSN31 1 bh
PSN32 1 bh
PSN33 1 bh
PSN34 1 bh
PSN35 1 bh
PSN36 1 bh
PPG
PPG1 1 bh
PPG2 1 bh
PPG3 1 bh
PPG4 1 bh
PPG5 1 bh
PPG6 1 bh
PPG7 1 bh
PPG8 1 bh
PPG9 1 bh
PPG10 1 bh
PPG11 1 bh
PPG12 1 bh
PPG13 1 bh
PPG14 1 bh
PPG15 1 bh
PPG16 1 M2
PPG17 1 M'
PTM
PTM1 1 M2/Hari
PTM2 1 M2/Hari
PTM3 1 M2/Hari
PTM4 1 M2/Hari
PTM5 1 M2/Hari
PTM6 1 M2/Hari
SPL
SPL1 1 M2
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :59
PT Pelabuhan Indonesia I (Persero)
KODE SATUAN
SPL2 1 M2
SPL3 1 M3
SPL4 1 M3
SPL5 1 M3
SPL6 1 M3
SPL7 1 KG
SPL8 1 KG
SPL9 1 M2
SPL10 1 KG
SPL11 1 M2
SPL12 1 M'
SPL13 1 M2
SPL14 1 M2
SPL15 1 M2
SPL16 1 M'
SPL17 1 M'
SPL18 1 M'
SPL19 1 M'
SPL20 1 M'
SPL21 1 M'
SPL22 1 M'
SPL23 1 M'
SPL24 1 M'
SPL25 1 Bh
SPL26 1 Bh
SPL27 1 Bh
SPL28 1 M'
SPL29 1M
SPL30 1 M'
SPL31 1 bh
KODE SATUAN
SPL32 1 M'
SPL33 1 BH
SPL34 1 M'
SPL35 1 M'
SPL36 1 M2
SPL37 1 M2
SPL38 1 M'
SPL39 1 M'
SPL40 1 M'
SPL41 1 M'
SPL42 1 M2
SPL43 1 M'
SPL44 1 M2
SPL45 1 M2
SPL46 1 M3
SPL47 1 M3
SPL48 1 M3
SPL49 1 M3
SPL50 1 M3
SPL51 1 M3
PLS
PLS1 1 M1
PLS2 1 M1
PLS3 1 M1
PLS4 1 M1
PLS5 1 M1
PLS6 1 M1
PLS7 1 M1
PLS8 1 M1
PLS9 1 Unit
PLS10 1 Unit
PLS11 1 Unit
PLS12 1 Unit
PLS13 1 Set
PLS14 1 Unit
PLS15 1 Set
KODE SATUAN
PLS16 1 Unit
PLS17 1 Set
PLS18 1 Set
PLS19 1 M1
PLS20 1 M1
PLS21 1 M1
PLS22 1 bh
PLS23 1 bh
PLS24 1 bh
PLS25 1 Set
PLS26 1 Set
PLS27 1 Set
PLS28 1 Set
PLS29 1 Set
PLS30 1 Set
PLS31 1 Set
PLS32 1 Set
PLS33 1 Set
PLS34 1 Set
PLS35 1 Set
PLS36 1 Set
ABS
ABS1 1 M2
ABS2 1 M3
ABS3 1 M2
ABS4 1 M2
ABS5 1 M2
ABS6 1 M2
ABS7 1 M2
ABS8 1 M2
ABS9 1 M2
ABS10 1 M2
ABS11 1 M2
ABS12 1 M2
ABS13 1 M2
ABS14 1 M2
ABS15 1 M1
ABS16 1 M2
KODE SATUAN
ASP
ASP1 1 M2
ASP2 1 M2
ASP3 1 M3
ASP4 1 liter
ASP5 1 M3
ASP6 1 M3
ASP7 1 liter
ASP8 1 M2
ALT
ALT1 1 Jam
ALT2 1 Jam
ALT3 1 Jam
ALT4 1 Jam
ALT5 1 Jam
ALT6 1 Jam
ALT7 1 Jam
ALT8 1 Jam
ALT9 1 Jam
ALT10 1 Jam
ALT11 1 Jam
ALT12 1 Jam
ALT13 1 Jam
ALT14 1 Jam
ALT15 1 Jam
ALT16 1 Jam
ALT17 1 Jam
ALT18 1 Jam
ALT19 1 Jam
ALT20 1 Jam
ALT21 1 Jam
ALT22 1 Jam
ALT23 1 Jam
ALT24 1 Jam
ALT25 1 Jam
ALT26 1 Jam
ALT27 1 Jam
ALT28 1 Jam
ALT29 1 Jam
ALT30 1 Jam
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :63
PT Pelabuhan Indonesia I (Persero)
KODE SATUAN
ALT31 1 Jam
ALT32 1 Jam
ALT33 1 Jam
ALT34 1 Jam
ALT35 1 Jam
ALT36 1 Jam
ALT37 1 Jam
ALT38 1 Jam
ALT39 1 Jam
ALT40 1 Jam
ALT41 1 Jam
MACAM PEKERJAAN
PEKERJAAN PERSIAPAN
Pekerjaan Pengukuran Gedung
Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
Membersihkan lapangan dan perataan
Membuat Papan Nama Proyek 80x120 cm
Pembuatan jalan sementara, tebal 25 cm
Pembuatan kantor sementara, dengan lantai plesteran
Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter
Pembuatan gudang semen dan alat-alat
Pembuatan rumah jaga/konstruksi kayu
Pembuatan bedeng buruh
Pasang pagar kawat jaring galvanis, tinggi 1,00 m
Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm
PEKERJAAN TANAH
Galian tanah biasa sedalam sampai 1 meter
Galian tanah biasa sedalam 1 - 2 meter
Galian tanah biasa sedalam 2 - 3 meter
Galian tanah keras sedalam sampai 1 meter
Galian tanah cadas sedalam sampai 1 meter
Galian tanah lumpur sedalam 1 meter
Stripping tebing setinggi 1 meter
Pengangkutan tanah sejauh 15 meter
Pemadatkan tanah per 20 cm
Urug kembali bekas galian (dihitung 1/3 kali galian tanah)
Urugan pasir
Urugan sirtu padat untuk peninggian lantai bangunan
Urug tanah mendatangkan
Memasang Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi
Gebalan rumput
Pemasangan lapisan ijuk tebal 10cm untuk peresapan
Pembuangan Tanah sampai dengan sejauh 150 meter
Mengerjakan Sondir Tanah
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :65
PT Pelabuhan Indonesia I (Persero)
MACAM PEKERJAAN
PASANGAN DINDING
Pasangan dinding HB/CB 10, camp. 1pc : 4ps
Pasangan dinding HB/CB 10, camp. 1pc : 3ps
Pasangan dinding HB/CB 15, camp. 1pc : 4ps
Pasangan dinding HB/CB 15, camp. 1pc : 3ps
Pasangan dinding HB/CB 20, camp. 1pc : 4ps
MACAM PEKERJAAN
PEKERJAAN BETON
Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87
Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
MACAM PEKERJAAN
Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Membongkar cetakan
Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )
Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )
PVC Waterstop lebar 150 mm
PVC Waterstop lebar 200 mm
PVC Waterstop lebar 230 mm - 320 mm
Pembesian dengan besi polos
Pembesian dengan besi ulir
Memasang kabel presstressed polos/strands
Memasang jaring kawat baja/wire mesh
Cetakan beton / begisting memakai papan
Cetakan beton / begisting memakai multiplek
Begesting untuk pondasi
Begesting untuk sloof
Begesting untuk kolom
Begesting untuk balok
Begesting untuk lantai
Begesting untuk dinding
Begesting untuk tangga
Jembatan untuk pengecoran beton
MACAM PEKERJAAN
PEKERJAAN PLESTERAN
Plesteran 1 Sm : 1 Kp : 1 Ps, tebal 15 mm
Plesteran 1 Sm : 1 Kp : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 1/2 Kp : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm
Plesteran 1 Pc : 1 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 4 Ps, tebal 15 mm
Plesteran 1 Pc : 5 Ps, tebal 15 mm
Plesteran 1 Pc : 6 Ps, tebal 15 mm
Plesteran granit 1 Pc : 2 Batu granit, tebal 10 mm
Plesteran traso 1 Pc : 2 Batu traso, tebal 10 mm
1 m2 Finishing siar pas. Bata merah (=20m')
Finishing siar pas. Batu kali 1 pc : 2 ps
Plesteran Ciprat, 1 Pc : 2 Ps
Acian
Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm
Plesteran batu kali 1pc:3ps
Plesteran batu kali 1pc:4ps
MACAM PEKERJAAN
PEKERJAAN KERAMIK
Pasang lantai keramik artistik uk. 10 x 20 cm
Pasang lantai keramik artistik uk. 10 x 10 cm atau 5 x 20 cm
Pasang ubin porselin uk. 11 x 11 cm
Pasang ubin porselin uk. 10 x 20 cm
Pasang ubin porselin uk. 20 x 20 cm
Pasang tegel keramik uk. 33/33
Pasang tegel keramik uk. 30/30
Pasang tegel keramik uk. 20/20
Pasang tegel keramik uk. 10 x 33 cm (variasi/border)
Pasang lantai mozaik uk. 30 x 30 cm, camp. 1pc : 3ps
Pasang plint keramik ukuran 10 x 30 cm
Pasang plint keramik ukuran 10 x 40 cm
Pasang plint keramik 5 x 20 cm
Pasang plint internal cove artistik 5 x 5 x 20 cm
Pasang lantai marmer uk. 100 x 100 cm
Pasang lantai karpet
Pasang keramik dinding artistik 10 x 20 cm
Pasang keramik dinding artistik 5 x 20 cm
MACAM PEKERJAAN
PEKERJAAN KAYU
Pasang konstruksi kuda-kuda konvensional
Pasang gording Kayu meranti
Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar (laut)
Pasang usuk 5/7 Kayu meranti, reng 3/4 Kayu damar (laut)
Pasang rangka atap sirap
Pasang rangka langit-langit (50 x 100) c
Pasang lisplank ukuran (3 x 20) cm
Pasang lisplank ukuran (3 x 30) cm,
Pasang lisplank ukuran (2 x 20) cm
Pasang lisplank ukuran (2 x 25) cm
Pasang lisplank ukuran 2 x (3 x 20) cm
Pasang lisplank ukuran 2 x (2 x 20) cm
Mengerjakan papan ruiter 2/20
Pasang rangka dinding pemisah ukuran (60 x 120) cm
Pasang dinding pemisah teakwood rangkap
Pasang dinding pemisah plywood rangkap
Pasang dinding lambiziring, dari Kayu jati papan
MACAM PEKERJAAN
MACAM PEKERJAAN
PEKERJAAN ATAP
Langit-langit asbes semen tebal 4, 5 dan 6 mm
Langit-langit asbes (1,00 x 1,00) m memakai plepet
Langit-langit akustik ukuran (30 x 30) cm
Langit-langit akustik ukuran (30 x 60) cm
Langit-langit akustik ukuran (60 x 120) cm
Langit-langit triplek ukuran (120 x 240) cm tebal 3mm, 4mm, dan 6 mm
Langit-langit lambriziring Kayu jati tebal 9 mm
Langit-langit gypsum board ukuran (1200 x 2400 x 9) mm
Pasang list plafond gypsum profil
Langit-langit akustik ukuran 60 x 120 cm + rangka alumunium
List langit-langit kayu profil
Pasang rangka langit-langit (1,00 x 1,00) m, Kayu jati
Pasang rangka langit-langit (60 x 120) cm, Kayu jati
Langit-langit rangka hollow
Pasang genteng beton besar Natural ( isi 9 / m2 )
Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat
Pasang genteng beton besar Warna ( isi 9 / m2 )
Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat
Pasang genteng keramik berglasir KIA, Kanmuri Natural
Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
Pasang bubungan genteng paris
Pasang bubungan genteng beton Warna
Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mm
Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm
Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm
Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm
Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm
Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm
Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm
Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm
Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm
Pasang bubung stel gelombang 0,92 m
Pasang nok stel rata 0,92 m
Pasang nok stel rata 1,09 m
MACAM PEKERJAAN
PEKERJAAN PENGECATAN
Mengecat kerb 3 kali TIAP 1 M2 ( 3 kali )
Mengecat kerb 3 kali TIAP 1 M2 ( 2 kali )
Mengecat kerb 3 kali TIAP 1 M2 ( 1 kali )
MACAM PEKERJAAN
PEKERJAAN BONGKARAN
Membongkar pasangan batu kali
Membongkar pasangan batu merah dan membersihkan
Membongkar beton bertulang dan membersihkan
Pekerjaan bongkar lantai tegel untuk dipergunakan lagi
Mengupas plesteran lama
Membongkar genteng / sirap untuk dipergunakan lagi
Membongkar atap seng
Membongkar usuk / reng dipakai lagi
Membongkar usuk / reng tidak dipakai lagi
Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
Mengerjakan kembali bangunan kayu yang telah dibongkar
MACAM PEKERJAAN
PEKERJAAN SANITASI
Memasang kloset duduk/monoblock
Memasang kloset jongkok porselen
Memasang kloset jongkok teraso
Memasang urinoir
Memasang wastafel
Memasang bak mandi fiberglass volume 0,30 m3
Memasang badkip porselen
Memasang bak fiberglass volume 1 m3 air
Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
Memasang pipa beton, diameter 15 cm - 20 cm
Memasang pipa beton, diameter 30 cm - 100 cm
Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm
Memasang pipa galvanis diameter 1/2"
Memasang pipa galvanis diameter 3/4"
Memasang pipa galvanis diameter 1"
Memasang pipa galvanis diameter 1 1/2"
Memasang pipa galvanis diameter 3"
Memasang pipa galvanis diameter 4"
Memasang pipa PVC tipe AW diameter 1/2"
Memasang pipa PVC tipe AW diameter 3/4"
Memasang pipa PVC tipe AW diameter 1"
Memasang pipa PVC tipe AW diameter 1 1/2"
MACAM PEKERJAAN
MACAM PEKERJAAN
Pemasangan Geotextile
Timbunan tanah merah dipadatkan
Lapisan Base coarse Agregat kelas A dipadatkan
Lapisan Sub Base coarse Agregat kelas B dipadatkan
Lapisan Sub Base coarse Agregat Kelas C dipadatkan
Memasang gelagar-gelagar besi
Menurunkan gelagar-gelagar besi jembatan
Mengerjakan lantai jembatan (papan yang dipakukan diatas gelagar kayu)
Memasang 1 Kg jaring kawat baja/wire mesh
Memasang lantai cone block t.10 cm dipadatkan denganVibratory Roller kapasitas 10-15 ton
Memasang riol 20 cm
Memasang kawat harmonica
Memasang kawat duri
Pasang Aluminium Composite Panel (Alucopan)
Mobilisasi dan Demobilisasi Peralatan
Pengadaan Tiang Pancang Beton dia …. Cm (Bottom)
Pengadaan Tiang Pancang Beton dia …. Cm (Upper/Middle)
Handling dan Transport tiang pancang dan penimbunan ke titik pancang
Pemancangan tiang pancang (Darat)
Pemancangan tiang (Laut)
Pengangkatan 1 m Tiang Pancang ke titik pancang (Darat)
Pengangkatan 1 m Sheet Pile ke titik pancang (laut)
Pemancangan Sheet Pile
Sambungan tiang pancang beton/spun pile dia 50 cm
Sambungan tiang pancang baja dia 50 cm
Memotong tiang pancang beton/ spun pile dia 50 cm
Pembuatan tiang pancang (40 x 40) cm, beton bertulang
Pembuatan tiang pancang (35 x 35) cm, beton bertulang
Pemancangan Cerucuk kayu laut dia. 3" - 4" panjang 5 m
Membongkar dan melepas fender
MACAM PEKERJAAN
Mengebor beton dermaga untuk lobang baut fender '(dihitung 120 menit).
Memasang fender karet
Pasang pipa beton oval dia. 25/37,5 dalam 0 - 1 m
Pasang pipa beton oval dia. 25/37,5 dalam 1 - 2 m
Membongkar perkerasan lama (serifying) tebal 10 cm
Pelapisan epoxy/tar tiang pancang
Pekerjaan Grouting / Injeksi retakan dinding bata dengan Semen Slurry (Cebex 100)
Pelapisan epoxy/tar tiang pancang
Cor beton kerb ( 15 x 30 ) cm, dengan 1pc:2ps:3kr
Cor beton Devider ( 30 x 30 ) cm, dengan 1pc:2ps:3kr
Membongkar Paving Block
Memasang Riol RCP Ø 60 t 10 cm :
Pasang conblock tipe segi-empat, abu-abu 10 cm, K-450
Pasang kembali conblock bekas
Beton bertulang K225 pondasi pagar
Beton bertulang K225 kolom pagar
Beton bertulang K225 balok pagar
Beton tanpa tulangan K225 pondasi menerus
Beton bertulang K225 manhole
Beton bertulang 1 :2:3, dinding drainase
MACAM PEKERJAAN
Bongkar Armatur
Bongkar Tiang Lampu Antik
Bongkar Tiang Lampu Antik
Pasang Kabel NYM 2x2,5 sqmm
Pasang Kabel NYA 2,5 sqmm
Pasang Pralon 3" Kabel NYY 3x6 sqmm
Pasang tutup panel ukuran 30x30
Pasang MCB Ampere + box tutup panel ukuran 30 x 30
Pasang Kapasitor 12,5 uF
1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan
1 Set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
ANALISA BASE
Menghampar dan mengisi bahan perkerasan
Menyawur pasir
Menggilas dengan motor walls
Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat
Pembuatan lapis pondasi atas (base) tebal 10 cm padat
Pembuatan lapis pondasi atas (base) tebal 8 cm padat
Pembuatan lapis pondasi atas (base) tebal 7 cm padat
Lapisan Penetrasi 4 cm padat
Pengaspalan sand sheet (latasir), tebal 1 cm jereng
Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
Mengecat marka jalan dengan Rettar
Mengecat marka jalan dengan Thermoplastic
Pemotongan aspal dengan mesin potong (cutter), 2 sisi
Pembongkaran aspal dengan Jack Hammer
Expantion joint
MACAM PEKERJAAN
ANALISA ASPAL
LATASTON ( HRS )
LASTON ( AC )
ASPHALT TREATED BASE ( ATB )
LAPIS RESAP PENGIKAT (PRIME COAT)
LAPIS PONDASI AGREGAT KLAS A
LAPIS PONDASI AGREGAT KLAS B
LAPIS PEREKAT (TACK COAT)
PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN)
SEWA ALAT :
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100 -150 HP
COMPRESSOR 4000 - 6500 L/M
WHEEL LOADER 1,0 - 1,6 M3
TANDEM ROLLER 6 - 8 T
PNEUMATIC TYRE ROLLER 8 - 10 T
DUMP TRUCK
GENERATOR SET
MOTOR GRADER > 100 HP
VIBRATORY ROLLER 5 - 8 T
WATER TANK TRUCK 3000 - 4000 L
JACK HAMMER
TAMPER
STONE CRUSHER
THREE WHEEL ROLLER 6 - 8 T
CONCRETE VIBRATOR
CONCRETE MIXER 0.3 - 0.6 M3
CRANE 10 - 15 TON
DUMP TRUCK 3 - 4 M3
EXCAVATOR 80 - 140 HP
FLAT BED TRUCK 3 - 4 M3
WATER PUMP 70 - 100 mm
FULVI MIXER
TRACK LOADER 75 - 100 HP
MESIN PENYARING 8 HP
CHIP SPREADER
MESIN PENGHAMPAR 1820 MM 30 HP
THRILLER GANDENG 1 TON
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :81
PT Pelabuhan Indonesia I (Persero)
MACAM PEKERJAAN
BATAS RANGE
HARGA SATUAN
HARGA SATUAN
UPAH BAHAN TOTAL
6,000 - 6,000
14,800 174,800 189,600
9,500 - 9,500
357,300 525,209 882,509
63,000 11,103 74,103
381,000 1,756,470 2,137,470
41,400 292,066 333,466
35,900 5,859 41,759
237,000 1,278,308 1,515,308
192,500 1,650,160 1,842,660
237,000 1,146,120 1,383,120
6,190 - 6,190
33,225 102,028 135,253
43,250 - 43,250
53,100 - 53,100
63,110 - 63,110
57,560 - 57,560
87,300 - 87,300
69,600 - 69,600
3,150 - 3,150
18,950 - 18,950
31,500 - 31,500
14,414 - 14,414
17,300 113,400 130,700
15,750 133,080 148,830
17,300 120,960 138,260
86,000 - 86,000
29,500 - 29,500
9,450 - 9,450
32,380 - 32,380
118,000 - 118,000
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :83
PT Pelabuhan Indonesia I (Persero)
HARGA SATUAN
UPAH BAHAN TOTAL
29,100 - 29,100
23,200 - 23,200
HARGA SATUAN
UPAH BAHAN TOTAL
34,000 129,050 163,050
26,600 45,360 71,960
26,600 44,160 70,760
26,600 54,188 80,788
26,600 56,938 83,538
26,600 59,320 85,920
26,600 60,710 87,310
26,600 62,973 89,573
26,600 66,559 93,159
26,600 72,616 99,216
53,200 108,960 162,160
53,200 124,078 177,278
53,200 126,765 179,965
53,200 131,666 184,866
53,200 140,226 193,426
53,200 153,413 206,613
26,600 19,325 45,925
26,600 23,090 49,690
31,050 23,090 54,140
38,400 21,988 60,388
- 21,988 21,988
HARGA SATUAN
UPAH BAHAN TOTAL
155,050 831,838 986,888
220,000 - 220,000
1,141,000 - 1,141,000
442,100 - 442,100
6,210 - 6,210
7,525 - 7,525
8,280 - 8,280
1,036 12,480 13,516
1,036 13,215 14,251
740 12,380 13,120
573 11,932 12,505
28,150 191,860 220,010
28,150 95,201 123,351
26,910 121,495 148,405
26,910 136,339 163,249
34,155 221,270 255,425
34,155 235,070 269,225
34,155 252,870 287,025
34,155 222,483 256,638
34,155 191,433 225,588
17,350 174,430 191,780
HARGA SATUAN
UPAH BAHAN TOTAL
15,960 63,986 79,946
26,355 72,754 99,109
118,630 962,793 1,081,423
91,700 767,862 859,562
HARGA SATUAN
UPAH BAHAN TOTAL
13,320 1,928 15,248
HARGA SATUAN
UPAH BAHAN TOTAL
93,150 14,948 108,098
93,150 14,948 108,098
76,730 17,760 94,490
11,850 669 12,519
134,550 69,054 203,604
22,200 - 22,200
34,920 - 34,920
17,760 - 17,760
11,840 - 11,840
17,760 - 17,760
HARGA SATUAN
UPAH BAHAN TOTAL
10,350 218,799 229,149
2,282,000 ### 12,402,000
1,956,000 ### 19,143,500
114,100 625,815 739,915
326,000 368,000 694,000
326,000 588,800 914,800
228,200 230,489 458,689
260,800 236,009 496,809
241,650 554,445 796,095
260,800 230,489 491,289
305,150 230,489 535,639
HARGA SATUAN
UPAH BAHAN TOTAL
35,550 6,813 42,363
8,200 - 8,200
8,000 - 8,000
17,760 - 17,760
14,800 - 14,800
14,800 - 14,800
14,800 23,400 38,200
118,400 138,000 256,400
10,350 24,752 35,102
8,880 - 8,880
74,000 3,000 77,000
7,440 163 7,603
31,100 112,030 143,130
34,060 121,556 155,616
36,740 - 36,740
20,700 - 20,700
26,600 - 26,600
20,700 - 20,700
26,600 - 26,600
20,700 - 20,700
26,600 - 26,600
41,400 3,920 45,320
41,400 3,920 45,320
15,060 1,956 17,016
14,490 1,956 16,446
14,490 1,956 16,446
14,250 1,956 16,206
14,250 1,956 16,206
14,250 1,956 16,206
14,250 1,956 16,206
14,250 1,956 16,206
14,250 1,956 16,206
16,110 - 16,110
18,990 - 18,990
16,110 - 16,110
HARGA SATUAN
UPAH BAHAN TOTAL
15,050 652 15,702
19,980 - 19,980
19,980 - 19,980
28,140 - 28,140
69,450 - 69,450
87,200 - 87,200
13,340 - 13,340
72,200 84,700 156,900
25,738 1,630 27,368
49,120 - 49,120
3,600 - 3,600
HARGA SATUAN
UPAH BAHAN TOTAL
8,450 - 8,450
8,450 - 8,450
5,960 2,056 8,016
10,725 14,807 25,532
4,590 33,729 38,319
12,810 35,254 48,064
13,110 - 13,110
6,440 - 6,440
5,980 - 5,980
23,240 7,750 30,990
6,907 16,998 23,905
5,478 13,560 19,038
6,907 - 6,907
5,478 - 5,478
12,810 7,695 20,505
19,490 4,800 24,290
17,480 - 17,480
19,700 3,530 23,230
33,000 3,530 36,530
5,900 - 5,900
6,907 - 6,907
464,293 30,596 494,889
342,000 - 342,000
165,500 - 165,500
464,000 - 464,000
11,800 - 11,800
7,875 - 7,875
11,800 - 11,800
9,500 - 9,500
17,140 - 17,140
11,800 - 11,800
770,000 - 770,000
71,000 - 71,000
1,304,000 - 1,304,000
HARGA SATUAN
UPAH BAHAN TOTAL
HARGA SATUAN
UPAH BAHAN TOTAL
11,218 75,250 86,468
7,464 109,900 117,364
19,750 148,252 168,002
19,750 245,721 265,471
28,470 - 28,470
47,450 33,500 80,950
9,850 19,700 29,550
9,850 78,100 87,950
550 - 550
207,250 - 207,250
550 52,500 53,050
47 0 47
66 - 66
11 - 11
35 - 35
6 - 6
20 - 20
504,000 - 504,000
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :95
PT Pelabuhan Indonesia I (Persero)
HARGA SATUAN
UPAH BAHAN TOTAL
7,100 - 7,100
47,500 126,612 174,112
37,500 318,846 356,346
37,500 333,246 370,746
37,500 2,187 39,687
384 - 384
845 - 845
56,300 1,223 57,523
4,620 1,000 5,620
34,573 6,000 40,573
24,840 9,486 34,326
37,500 - 37,500
37,500 408 37,908
103,500 614,370 717,870
10,750,000 - 10,750,000
- - -
- - -
462,000 - 462,000
51,333 - 51,333
138,813 - 138,813
69,169 - 69,169
- - -
3,417 - 3,417
227,663 - 227,663
227,663 - 227,663
156,400 - 156,400
- 1,137,668 1,137,668
- 920,966 920,966
2,042 - 2,042
332,000 - 332,000
HARGA SATUAN
UPAH BAHAN TOTAL
194,250 - 194,250
1,171,000 - 1,171,000
54,450 - 54,450
95,700 - 95,700
1,362 - 1,362
49,500 2,520 52,020
84,054 41,100 125,154
49,500 2,520 52,020
12,495 46,705 59,200
20,507 76,935 97,441
6,300 - 6,300
24,840 843,750 868,590
51,750 198,325 250,075
51,750 4,725 56,475
384,520 2,819,667 3,204,186
610,371 4,719,540 5,329,911
667,167 4,801,070 5,468,237
121,825 736,078 857,903
281,341 1,985,752 2,267,094
508,680 2,866,161 3,374,841
675 - 675
675 - 675
675 - 675
675 - 675
338 - 338
47,500 - 47,500
47,500 - 47,500
675 - 675
61,250 - 61,250
61,250 - 61,250
399,230 - 399,230
300,000 - 300,000
61,250 - 61,250
81,640 - 81,640
49,000 - 49,000
HARGA SATUAN
UPAH BAHAN TOTAL
40,828 - 40,828
300,000 - 300,000
399,395 - 399,395
950 - 950
950 - 950
950 - 950
7,500 - 7,500
7,500 - 7,500
7,500 - 7,500
67,500 - 67,500
107,431 - 107,431
67,500 - 67,500
236,750 206,304 443,054
267,300 206,304 473,604
280,964 206,304 487,268
310,750 206,304 517,054
337,262 206,304 543,566
116,844 - 116,844
102,509 - 102,509
116,844 - 116,844
109,326 - 109,326
772,658 - 772,658
491,200 - 491,200
1,964,800 9,210,000 11,174,800
169,464 230,250 399,714
135,080 203,234 338,314
92,919 141,220 234,139
13,099 125,256 138,355
9,824 109,906 119,730
98,928 2,410,171 2,509,099
1,250,595 104,380 1,354,975
89,890 37,086 126,975
220,058 236,758 456,816
446,992 1,624,644 2,071,636
2,807 13,333 16,139
173,394 972,576 1,145,970
2,750,720 ### 19,016,808
HARGA SATUAN
UPAH BAHAN TOTAL
19,220
29,149
629,690
2,254
105,095
106,415
2,815
5,081
6,816,302
216,086
54,621
370,000
163,285
344,901
177,077
215,630
227,651
369,422
384,919
236,640
167,999
6,380
9,289
451,227
113,261
21,426
34,275
300,141
178,697
179,333
210,793
11,228
139,372
205,761
50,000
50,000
181,000
184,000
Analisa Harga Satuan Pekerjaan Tahun 2012 Hal :99
PT Pelabuhan Indonesia I (Persero)
HARGA SATUAN
UPAH BAHAN TOTAL
118,000
11,000
15,000
15,000
150,000
75,000
25,000
60,000
20,000
75,000
48,000
1 2 3
I PEKERJAAN PERSIAPAN
1 Survey lokasi
2 Mobilisasi dan Demobilisasi Alat
Jumlah I
Jumlah II
IV PEKERJAAN LAIN-LAIN
1 Pembersihan akhir
2 Dokumentasi dan laporan
Jumlah IV
LATION SHEET
KANTIN DAN PARKIR TRUK
L CONTAINER TERMINAL
1 ls
1 ls
8 8 64 m
58 m
83.73 m
1 ls
58 3.132 m3
83.73 6.27975 m³
141.73 13.46435 m3
64 2.416667 309.3333 kg
64 2 128 kg
1 ls
1 ls
PERHITUNGAN VOLUME BESI
PEKERJAAN PERLUASAN WORKSHOP
BELAWAN INTERNATIONAL CONTAINER TERMINAL
Panjang / Panjang Koefisien
Ø Lebar Tinggi
No keliling(m Jumlah Jumlah Jumlah Berat
Besi(mm) (m¹) (m¹)
¹) (m¹) (Kg/m¹)
a b b c=axb d
sloof/ring balok beton bertulang untuk 1m³
1 10 10.526316 10 10 105.26316 0.617
2 8 0.15 0.45 1.2 70.175439 71 85.2 0.395
jumlah
e=cxd
64.947 t.utama
33.654 sengkang
98.601 kg
PT Pelabuhan Indonesia I (Persero)
PPG KPG
PEKERJAAN KUNCI DAN KACA
PPA
PRK
SNT
TNM
A dan UPAH/BAHAN
UPAH
SEWA ALAT
ASBES
ASPAL
ATAP
BAHAN CAT
LAIN-LAIN
BAHAN KACA
PENGGANTUNG / PENGUNCI
BAHAN KAYU
INSTALASI LISTRIK
PERLATAN KEBERSIHAN
PAKU / BAUT
PIPA
PEATAN SANITASI
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0113
2 Mandor ( L 03 ) Jam 0.0016
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0121
2 Agregat Halus ( M 04 ) M3 0.0232
3 Filler ( M 05 ) Kg 4.8004
4 Aspal ( M 10 ) Kg 5.2962
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0011
2 AMP ( E 01 ) Jam 0.0016
3 Genset ( E 12 ) Jam 0.0016
4 Dump Truck ( E 09 ) Jam 0.0143
5 Aspal Finisher ( E 02 ) Jam 0.0020
6 Tandem Roller ( E 17 ) Jam 0.0017
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan padat t 0.03
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan Tandem
dan Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch HRS Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00
- Angkut = ( L : v1 ) x 60 menit T2 30.00
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 24.00
Ts2 85.00
e Finisher ( E 02 )
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.83
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 6.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56
Produksi HRS / hari = Tk x Q2 Qt 4,322.92
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 19,220.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0217
2 Mandor ( L 03 ) Jam 0.0022
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0336
2 Agregat Halus ( M 04 ) M3 0.0149
3 Filler ( M 05 ) Kg 4.8015
4 Aspal ( M 10 ) Kg 6.6150
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0015
2 AMP ( E 01 ) Jam 0.0022
3 Genset ( E 12 ) Jam 0.0022
4 Dump Truck ( E 09 ) Jam 0.0348
5 Aspal Finisher ( E 02 ) Jam 0.0027
6 Tandem Roller ( E 17 ) Jam 0.0016
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan ( AC ) padat t 0.04
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan Tandem dan
Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 4.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch AC Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 8.00
- Angkut = ( L : v1 ) x 60 menit T2 29.99
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 23.99
Ts2 76.98
e Finisher ( E 02 )
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.83
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 2.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 4.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Rambu = 2 bh
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11
Produksi AC / hari = Tk x Q2 Qt 3,227.78
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 1.00
Rp 29,149.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.3880
2 Mandor ( L 03 ) Jam 0.0554
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7028
2 Agregat Halus ( M 04 ) M3 0.5341
3 Filler ( M 05 ) Kg 139.2
4 Aspal ( M 10 ) Kg 157.0
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0380
2 AMP ( E 01 ) Jam 0.0554
3 Genset ( E 12 ) Jam 0.0554
4 Dump Truck ( E 09 ) Jam 0.4906
5 Aspal Finisher ( E 02 ) Jam 0.0767
6 Tandem Roller ( E 17 ) Jam 0.0430
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat ( Cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan ( ATB ) padat t 0.04
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan Tandem dan
Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch ATB Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00
- Angkut = ( L : v1 ) x 60 menit T2 29.99
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 23.99
Ts2 84.99
e Finisher
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.75
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 6.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04
Produksi ATB / hari = Tk x Q2 Qt 126.30
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 629,690.00 / M3
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301
2 Mandor ( L 03 ) Jam 0.0060
B BAHAN
1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417
2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030
2 Compresor ( E 05 ) Jam 0.0031
3 Dump Truck ( E 08 ) Jam 0.0030
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : L
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00
4 Jam kerja efektif 1 hari Tk 7.00
5 Faktor kehilangan material Fh 1.10
6 Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 56
- Minyak Flux / pencair K 44
8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00
Faktor efisiensi alat Fa 0.83
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00
b Air Compresor ( E 05 )
Kapasitas alat -----------> Diambil V 400.00
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 2.00
Rp 2,254.00 / LITER
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373
2 Mandor ( L 03 ) Jam 0.0625
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7680
2 Agregat Halus ( M 04 ) M3 0.4320
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625
2 Dump Truck ( E 09 ) Jam 0.1994
3 Motor Grader ( E 13 ) Jam 0.0117
4 Vibratory Roller ( E 19 ) Jam 0.0178
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043
6 Water Tank Truck ( E 23 ) Jam 0.0211
7 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat Cara mekanik
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal Agregat padat t 0.15
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00
8 Proporsi campuran
- Agregat Kasar Ak 64.00
- Agregat halus Ah 36.00
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di Base
camp
2
Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan dengan
Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Mencampur T1 2.50
- Memuat dan Lain lain T2 1.00
Ts 1 3.50
Fk x Ts1
Koefisien Alat / m3 = 1 / Q1 ( E 15 ) 0.0625
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 45.00
Kecepatan rata rata kosong v2 60.00
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99
- lain lain termasuk menurunkan Agregat T3 3.00
Ts2 49.65
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 4.00
Jumlah lintasan n 6.00
Waktu siklus Ts 3
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75
- Lain lain T2 1.00
Ts 3 1.75
d Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 3.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor efisiensi alat Fa 0.83
g Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01
Produksi Agregat / hari = Tk x Q1 Qt 112.05
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 105,095.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373
2 Mandor ( L 03 ) Jam 0.0625
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7080
2 Agregat Halus ( M 04 ) M3 0.4920
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625
2 Dump Truck ( E 09 ) Jam 0.1994
3 Motor Grader ( E 13 ) Jam 0.0117
4 Vibratory Roller ( E 19 ) Jam 0.0178
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043
6 Water Tank Truck ( E 23 ) Jam 0.0211
7 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal Agregat padat t 0.15
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00
8 Proporsi campuran
- Agregat Kasar Ak 59.00
- Agregat halus Ah 41.00
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di Base
camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan dengan
Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Mencampur T1 2.50
- Memuat dan Lain lain T2 1.00
Ts 1 3.50
Fk x Ts1
Koefisien Alat / m2 = 1 / Q1 ( E 15 ) 0.0625
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 45.00
Kecepatan rata rata kosong v2 60.00
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99
- lain lain termasuk menurunkan Agregat T3 3.00
Ts2 49.65
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 4.00
Jumlah lintasan n 6.00
Waktu siklus Ts 3
- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75
- Lain lain T2 1.00
Ts 3 1.75
d Vibratory Roller ( E 17 )
Kecepatan rata rata alat v 3.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor efisiensi alat Fa 0.83
g Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01
Produksi Agregat / hari = Tk x Q1 Qt 112.05
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 106,415.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301
2 Mandor ( L 03 ) Jam 0.0060
B BAHAN
1 Aspal ( M 10 ) Kg 0.8880
2 Kerosene ( M 11 ) Liter 0.2530
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030
2 Compresor ( E 05 ) Jam 0.0063
3 Dump Truck ( E 08 ) Jam 0.0030
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00
4 Jam kerja efektif 1 hari Tk 7.00
5 Faktor kehilangan material Fh 1.10
6 Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 77
- Minyak Flux / pencair K 23
8
Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal
cair
2
Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan
dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00
Faktor efisiensi alat Fa 0.83
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00
b Air Compresor ( E 05 )
Kapasitas alat . . . . . Diambil V 400.00
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00
Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 2.00
Rp 2,815.00 / Liter
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0161
2 Mandor ( L 02 ) Jam 0.0040
B BAHAN
C PERALATAN
1 Motor Grader ( E 13 ) Jam 0.0025
2 Vibratory Roller ( E 19 ) Jam 0.0040
3 Water Tank Truck ( E 23 ) Jam 0.0105
4 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M2
I ASUMSI
1 Pekerjaan dilakukan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi jalan : jelek / belum padat
5 Jam kerja efektif per hari Tk 7.00
II URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu
2 ALAT
a Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 2.00
Jumlah lintasan n 6.00
Waktu siklus Ts 1
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50
- Lain lain T2 1.00
Ts 1 2.50
b Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 2.00
Lebar efektif pemadatan b 1.20
g Alat Bantu
Diperlukan :
- Skop = 3 bh
3 TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,743.00
Kebutuhan tenaga
- Pekerja P 4.00
- Mandor M 1.00
Rp 5,081.00 / M2
ASP 1
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 77.93
80,000.00 129.54
207.47
- -
20,000.00 464.05
- -
- -
464.05
344,900.53 383.05
6,816,302.41 11,037.48
369,422.18 598.20
227,650.78 3,263.91
216,085.57 437.38
177,076.60 304.78
215,630.16 277.12
500.00 500.00
16,801.91
17,473.44
1,747.34
19,220.78
19,220.00
r mata pembayaran
ASP 2
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t / m3
t / m3
t / m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m2
Jam
SATUAN KET.
ton / jam
-
m2
Jam
m2
Jam
ton
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m2
Jam
km / jam
-
m2
Jam
km/jam
m
lintasan
-
m2
Jam
SATUAN KET.
km / jam
m
lintasan
-
m2
Jam
Lump sum
m2 / jam
m2
orang
orang
jam
jam
ASP 3
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 149.10
80,000.00 173.49
322.59
- -
20,000.00 297.00
- -
- -
297.00
344,900.53 513.02
6,816,302.41 14,782.34
369,422.18 801.16
227,650.78 7,918.11
216,085.57 585.77
177,076.60 284.46
215,630.16 494.85
500.00 500.00
25,879.71
26,499.30
2,649.93
29,149.23
29,149.00
ASP 4
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t / m3
t / m3
t / m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m3
Jam
SATUAN KET.
ton / jam
-
m2
Jam
m2
Jam
m3
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m2
Jam
ton / jam
-
m2
Jam
km / jam
m
lintasan
-
m2
Jam
SATUAN KET.
km / jam
m
lintasan
-
m2
Jam
Lump sum
m2 / jam
m2
orang
orang
jam
jam
ASP 5
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 2,667.17
80,000.00 4,433.73
7,100.90
- -
20,000.00 10,682.22
- -
- -
10,682.22
344,900.53 13,110.40
6,816,302.41 377,770.98
369,422.18 20,474.00
227,650.78 111,693.42
216,085.57 16,566.56
177,076.60 7,619.47
215,630.16 6,927.88
500.00 500.00
554,662.71
572,445.84
57,244.58
629,690.42
629,690.00
B)
ASP 6
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t/m3
t/m3
t/m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m3
Jam
SATUAN KET.
ton / jam
-
m3
Jam
m3
Jam
ton
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m3
Jam
ton/jam
-
m3
Jam
km / jam
m
lintasan
-
m3
Jam
SATUAN KET.
km / jam
m
lintasan
-
m3
Jam
Lump sum
m3 / jam
m3
orang
orang
jam
jam
ASP 7
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 207.08
80,000.00 481.93
689.01
- -
- -
54,620.78 164.52
163,284.90 510.27
227,650.78 685.70
1,360.48
2,049.49
204.95
2,254.44
2,254.00
ASP 8
SATUAN KET.
Km
Jam
-
% 100 Bagian
% 80 Bagian
Kg / Lt
Kg / Lt
liter Campuran
kg
liter
liter
-
jam
liter
jam
m2 / jam
liter / m2
liter
jam
SATUAN KET.
liter
jam
Liter
Liter
orang
orang
jam
jam
ASP 9
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 3,006.47
80,000.00 4,997.77
8,004.24
- -
20,000.00 8,640.00
8,640.00
344,900.53 21,546.66
227,650.78 45,389.05
236,640.05 2,771.89
236,640.05 4,223.83
215,630.16 923.72
167,998.54 3,542.14
500.00 500.00
78,897.29
95,541.53
9,554.15
105,095.68
105,095.00
21,019.00
15,764.00
10,509.00
S A
ASP 10
SATUAN KET.
Km
m
Jam
m3
m3
m3
-
-
menit
menit
menit
m3
Jam
m3
-
km / jam
km / jam
menit
menit
menit
menit
SATUAN KET.
m3
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km/jam
m
lintasan
-
m3
Jam
m3
m3
kali
-
m3
Jam
SATUAN KET.
Lump sum
m3 / jam
m3
orang
orang
jam
jam
ASP 11
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 3,006.47
80,000.00 4,997.77
8,004.24
- -
20,000.00 9,840.00
9,840.00
344,900.53 21,546.66
227,650.78 45,389.05
236,640.05 2,771.89
236,640.05 4,223.83
215,630.16 923.72
167,998.54 3,542.14
500.00 500.00
78,897.29
96,741.53
9,674.15
106,415.68
106,415.00
21,283.00
15,962.00
10,641.00
r mata pembayaran
S B
ASP 12
SATUAN KET.
Km
m
Jam
m3
m3
m3
-
-
menit
menit
menit
m3
Jam
m3
-
km / jam
km / jam
menit
menit
menit
menit
SATUAN KET.
m3
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km / jam
m3
lintasan
-
m3
Jam
SATUAN KET.
Lump sum
m3 / jam
m3 / jam
orang
orang
jam
jam
ASP 13
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 207.08
80,000.00 481.93
689.01
- -
- -
54,620.78 164.52
163,284.90 1,020.53
227,650.78 685.70
1,870.75
2,559.75
255.98
2,815.73
2,815.00
ASP 14
SATUAN KET.
Km
Jam
-
% 100 Bagian
% 30 Bagian
Kg / Lt
Kg / Lt
Liter Campuran
Kg
Liter
Liter
-
Jam
Liter
Jam
m2 / jam
Liter / m2
Liter
Jam
SATUAN KET.
Liter
Jam
Liter
Liter
orang
orang
jam
jam
ASP 15
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 110.44
80,000.00 321.29
431.73
384,919.36 966.16
236,640.05 950.36
167,998.54 1,771.07
500.00 500.00
4,187.59
4,619.32
461.93
5,081.25
5,081.00
ASP 16
SATUAN KET.
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
m3
m3
kali
-
SATUAN KET.
m3
Jam
Lump sum
m3 / jam
m3
orang
orang
jam
jam
KETERANGAN
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
baru
Sewa
Sewa
Sewa
Sewa
BS4 100 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
Pasair pasang 5.0000 m3 X Rp. 491,200.00
Batu belah 15/20 23.0000 m 3
X Rp. 491,200.00
Batu pecah 5/7 cm 3.0000 m3 X Rp. 491,200.00
Pasir urug 6.5000 m3 X Rp. 491,200.00
Isi batu berkerasan 26.0000 m 3
X Rp. 491,200.00
Menyawur pasir 6.5000 Tng X Rp. 491,200.00
JUMLAH
Tiap m2
1/100 x 15,964,000.00 + 18,420,000.00
Biaya menggilas
1/200 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/200 x -
JUMLAH
BS5 100 m2 Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat
Pasair urug 5.0000 m3 X Rp. 491,200.00
Batu belah 15/20 17.5000 m3 X Rp. 491,200.00
Batu pecah 5/7 cm 3.0000 m 3
X Rp. 491,200.00
Pasir urug (pengisi) 6.5000 m3 X Rp. 491,200.00
Isi batu berkerasan 20.5000 m3 X Rp. 491,200.00
Menyawur pasir 5.0000 Tng X Rp. 491,200.00
JUMLAH ( BELUM TERMASUK PPN )
Tiap m2
1/100 x 12,525,600.00 + 15,718,400.00
Biaya menggilas
Tiap m2
1/100 x 7,982,000.00 + 7,982,000.00
Biaya menggilas
1/150 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/150 x -
JUMLAH
Tiap m2
1/100 x 9,578,400.00 + 239,543,504.00
Biaya menggilas
4/12,5/200 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/200 x -
JUMLAH
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat)
2/100 x 62,333,280.00 + 4,298,000.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
Tiap m1
Aspal sand sheet 3 cm jereng (2 cm padat)
3/100 x 62,333,280.00 + 4,298,000.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
BS11 100 m2 Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
Aspal - kg X Rp. 491,200.00
Pasair pasang 1.0000 m3 X Rp. 491,200.00
Kayu bakar 0.9000 m3 X Rp. 491,200.00
Juru godog aspal 0.2500 org X Rp. 491,200.00
Pekerja 8.1000 org X Rp. 491,200.00
Mandor 0.4000 org X Rp. 491,200.00
JUMLAH
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 4,298,000.00 + 933,280.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 4,298,000.00 + 933,280.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
BS14 350 m' Pemotongan aspal dengan mesin potong (cutter), 2 sisi
Cutter 2.0000 bh X Rp. 491,200.00
Sewa mesin cutter 2.0000 hr X Rp. 491,200.00
Solar 15.0000 ltr X Rp. 491,200.00
Tk. Cutter / masinis 2.0000 org X Rp. 491,200.00
Pekerja 2.0000 org X Rp. 491,200.00
JUMLAH
Tiap m1
1/350 x 1,964,800.00 + 9,332,800.00
736,800.00 -
35,857.60 -
772,657.60 - 772,657.60
491,200.00
491,200.00 - 491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
368,400.00
7,859,200.00
1,964,800.00 9,210,000.00 11,174,800.00
2,456,000.00
11,297,600.00
1,473,600.00
3,192,800.00
12,771,200.00
3,192,800.00
15,964,000.00 18,420,000.00 34,384,000.00
159,640.00 184,200.00
9,824.00 46,050.00
-
169,464.00 230,250.00 399,714.00
2,456,000.00
8,596,000.00
1,473,600.00
3,192,800.00
10,069,600.00
2,456,000.00
12,525,600.00 15,718,400.00 28,244,000.00
125,256.00 157,184.00
-
135,080.00 203,234.00 338,314.00
4,912,000.00
982,400.00
491,200.00
1,596,400.00
6,385,600.00
1,596,400.00
7,982,000.00 7,982,000.00 15,964,000.00
79,820.00 79,820.00
13,098.67 61,400.00
-
92,918.67 141,220.00 234,138.67
- 63,856.00
13,098.67 61,400.00
-
13,098.67 125,256.00 138,354.67
- 63,856.00
9,824.00 46,050.00
-
9,824.00 109,906.00 119,730.00
117,888.00
235,776.00
1,719,200.00
589,440.00
614,000.00
6,876,800.00
491,200.00
736,800.00
491,200.00
491,200.00
491,200.00
196,480,000.00
39,296,000.00
491,200.00
9,578,400.00 239,543,504.00 249,121,904.00
95,784.00 2,395,435.04
3,143.68 14,736.00
-
98,927.68 2,410,171.04 2,509,098.72
61,400,000.00
491,200.00
442,080.00
122,800.00
3,978,720.00
196,480.00
62,333,280.00 4,298,000.00 66,631,280.00
1,246,665.60 85,960.00
3,929.60 18,420.00
-
1,250,595.20 104,380.00 1,354,975.20
1,869,998.40 128,940.00
3,929.60 18,420.00
-
1,873,928.00 147,360.00 2,021,288.00
-
491,200.00
442,080.00
122,800.00
3,978,720.00
196,480.00
4,298,000.00 933,280.00 5,231,280.00
85,960.00 18,665.60
3,929.60 18,420.00
-
89,889.60 37,085.60 126,975.20
85,960.00 18,665.60
3,929.60 18,420.00
-
89,889.60 37,085.60 126,975.20
2,087,600.00
279,984.00
1,105,200.00
112,976.00
982,400.00
2,200,576.00 2,367,584.00 4,568,160.00
220,057.60 236,758.40
220,057.60 236,758.40 456,816.00
814,164.00
221,040.00
515,760.00
36,840.00
36,840.00
4,912.00
110,520.00
294,720.00
36,840.00
446,992.00 1,624,644.00 2,071,636.00
982,400.00
982,400.00
7,368,000.00
982,400.00
982,400.00
1,964,800.00 9,332,800.00 11,297,600.00
324,192.00
648,384.00
19,648.00
122,800.00
30,945.60
173,393.60 972,576.00 1,145,969.60
9,087,200.00
2,701,600.00
491,200.00
7,368.00
3,192,800.00
49,120.00
49,120.00
49,120.00
49,120.00
49,120.00
49,120.00
491,200.00
491,200.00
2,210,400.00
49,120.00
2,750,720.00 16,266,088.00 19,016,808.00
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PL
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER 100 -15
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000 - 6
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER 1,0 -
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TYRE ROLLE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan GENERATOR SE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER > 1
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru Umur Ekonomis A
Jam Kerja dalam 1 Tahun W
Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WATER TANK TRUCK 300
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TAMPER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan STONE CRUSHER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL ROLLER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRAT
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3 -
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CRANE 10 - 15 TO
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3 - 4
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80 - 140
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3 -
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70 - 10
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan FULVI MIXER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75 - 1
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
AT
150.00 HP
50.00 Ton/jam
10.00 Tahun
1,500.00 Jam
7,500,000,000.00 Rupiah
10.00 Tahun Alat Baru
1,500.00 Jam Alat Baru
7,500,000,000.00 Rupiah Alat Baru
750,000,000.00 Rupiah
0.23852 -
1,073,352.41 Rupiah
10,000.00 Rupiah
1,083,352.41 Rupiah
217,500.00 Rupiah
4,872,000.00 Rupiah Khusus AMP
18,450.00 Rupiah
625,000.00 Rupiah
- Rupiah
- Rupiah
5,732,950.00 Rp
6,816,302.41 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
47.00 HP
6.00 Ton
6.00 Tahun
2,000 Jam
715,000,000.00 Rupiah
6.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
715,000,000.00 Rupiah Alat Baru
71,500,000.00 Rupiah
0.30071 -
96,752.07 Rupiah
715.00 Rupiah
97,467.07 Rupiah
68,150.00 Rupiah
5,781.00 Rupiah
44,687.50 Rupiah
0.00 Rupiah
0.00 Rupiah
118,618.50 Rupiah
216,085.57 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
15.00 HP
800.00 Liter
5.00 Tahun
2,000 Jam
145,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
145,000,000.00 Rupiah Alat Baru
14,500,000.00 Rupiah
0.33438 -
21,818.28 Rupiah
145.00 Rupiah
21,963.28 Rupiah
21,750.00 Rupiah
1,845.00 Rupiah
9,062.50 Rupiah
0.00 Rupiah
0.00 Rupiah
32,657.50 Rupiah
54,620.78 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
140.00 HP
Ton
5.00 Tahun
2,000 Jam
700,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
700,000,000.00 Rupiah Alat Baru
70,000,000.00 Rupiah
0.33438 -
105,329.61 Rupiah
700.00 Rupiah
106,029.61 Rupiah
203,000.00 Rupiah
17,220.00 Rupiah
43,750.00 Rupiah
0.00 Rupiah
0.00 Rupiah
263,970.00 Rupiah
369,999.61 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
80.00 HP
Ton
5.00 Tahun
2,000 Jam
175,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
175,000,000.00 Rupiah Alat Baru
17,500,000.00 Rupiah
0.33438 -
26,332.40 Rupiah
175.00 Rupiah
26,507.40 Rupiah
116,000.00 Rupiah
9,840.00 Rupiah
10,937.50 Rupiah
0.00 Rupiah
0.00 Rupiah
136,777.50 Rupiah
163,284.90 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
105.00 HP
1.50 Ton
5.00 Tahun
2,000.00 Jam
840,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
840,000,000.00 Rupiah Alat Baru
84,000,000.00 Rupiah
0.33438 -
126,395.53 Rupiah
840.00 Rupiah
127,235.53 Rupiah
152,250.00 Rupiah
12,915.00 Rupiah
52,500.00 Rupiah
0.00 Rupiah
0.00 Rupiah
217,665.00 Rupiah
344,900.53 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
50.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
460,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
460,000,000.00 Rupiah Alat Baru
46,000,000.00 Rupiah
0.33 -
69,216.60 Rupiah
460.00 Rupiah
69,676.60 Rupiah
72,500.00 Rupiah
6,150.00 Rupiah
28,750.00 Rupiah
0.00 Rupiah
0.00 Rupiah
107,400.00 Rupiah
177,076.60 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
60.00 HP
10.00 Ton
5.00 Tahun
1,800.00 Jam
510,000,000.00 Rupiah
5.00 Tahun Alat Baru
1,800.00 Jam Alat Baru
510,000,000.00 Rupiah Alat Baru
51,000,000.00 Rupiah
0.33438 -
85,266.82 Rupiah
566.67 Rupiah
85,833.49 Rupiah
87,000.00 Rupiah
7,380.00 Rupiah
35,416.67 Rupiah
0.00 Rupiah
0.00 Rupiah
129,796.67 Rupiah
215,630.16 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
125.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
145,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
145,000,000.00 Rupiah Alat Baru
14,500,000.00 Rupiah
0.33438 -
21,818.28 Rupiah
145.00 Rupiah
21,963.28 Rupiah
181,250.00 Rupiah
15,375.00 Rupiah
9,062.50 Rupiah
- Rupiah
- Rupiah
205,687.50 Rupiah
227,650.78 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
175.00 HP
125.00 KVA
5.00 Tahun
2,000.00 Jam
440,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
440,000,000.00 Rupiah Alat Baru
44,000,000.00 Rupiah
0.33438 -
66,207.18 Rupiah
440.00 Rupiah
66,647.18 Rupiah
253,750.00 Rupiah
21,525.00 Rupiah
27,500.00 Rupiah
- Rupiah
- Rupiah
302,775.00 Rupiah
369,422.18 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
125.00 HP
- -
5.00 Tahun
2,000.00 Jam
880,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
880,000,000.00 Rupiah Alat Baru
88,000,000.00 Rupiah
0.33438 -
132,414.36 Rupiah
880.00 Rupiah
133,294.36 Rupiah
181,250.00 Rupiah
15,375.00 Rupiah
55,000.00 Rupiah
- Rupiah
- Rupiah
251,625.00 Rupiah
384,919.36 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
75.00 HP
7.00 Ton
4.00 Tahun
2,000.00 Jam
500,000,000.00 Rupiah
4.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
500,000,000.00 Rupiah Alat Baru
50,000,000.00 Rupiah
0.38629 -
86,915.05 Rupiah
500.00 Rupiah
87,415.05 Rp
108,750.00 Rupiah
9,225.00 Rupiah
31,250.00 Rupiah
- Rupiah
- Rupiah
149,225.00 Rp
236,640.05 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
100.00 HP
4,000.00 Liter
5.00 Tahun
2,000.00 Jam
50,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
50,000,000.00 Rupiah Alat Baru
5,000,000.00 Rupiah
0.33438 -
7,523.54 Rupiah
50.00 Rupiah
7,573.54 Rp
145,000.00 Rupiah
12,300.00 Rupiah
3,125.00 Rupiah
- Rupiah
- Rupiah
160,425.00 Rp
167,998.54 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
3.00 HP
- Liter
4.00 Tahun
1,000.00 Jam
3,500,000.00 Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
3,500,000.00 Rupiah Alat Baru
350,000.00 Rupiah
0.38629 -
1,216.81 Rupiah
7.00 Rupiah
1,223.81 Rp
4,350.00 Rupiah
369.00 Rupiah
437.50 Rupiah
- Rupiah
- Rupiah
5,156.50 Rp
6,380.31 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
TAMPER E25
5.00 HP
0.170 Ton
4.00 Tahun
1,000.00 Jam
3,000,000.00 Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
3,000,000.00 Rupiah Alat Baru
300,000.00 Rupiah
0.38629 -
1,042.98 Rupiah
6.00 Rupiah
1,048.98 Rp
7,250.00 Rupiah
615.00 Rupiah
375.00 Rupiah
- Rupiah
- Rupiah
8,240.00 Rp
9,288.98 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
220.00 HP
50.00 Ton/Jam
5.00 Tahun
2,000.00 Jam
491,500,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
491,500,000.00 Rupiah Alat Baru
49,150,000.00 Rupiah
0.33438 -
73,956.43 Rupiah
491.50 Rupiah
74,447.93 Rp
319,000.00 Rupiah
27,060.00 Rupiah
30,718.75 Rupiah
- Rupiah
- Rupiah
376,778.75 Rp
451,226.68 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
55.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
125,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
125,000,000.00 Rupiah Alat Baru
12,500,000.00 Rupiah
0.33438 -
18,808.86 Rupiah
125.00 Rupiah
18,933.86 Rp
79,750.00 Rupiah
6,765.00 Rupiah
7,812.50 Rupiah
- Rupiah
- Rupiah
94,327.50 Rp
113,261.36 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
10.00 HP
- -
4.00 Tahun
1,000.00 Jam
12,000,000.00 Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
12,000,000.00 Rupiah Alat Baru
1,200,000.00 Rupiah
0.38629 -
4,171.92 Rupiah
24.00 Rupiah
4,195.92 Rp
14,500.00 Rupiah
1,230.00 Rupiah
1,500.00 Rupiah
- Rupiah
- Rupiah
17,230.00 Rp
21,425.92 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
15.00 HP
500.00 Liter
4.00 Tahun
2,000.00 Jam
45,000,000.00 Rupiah
4.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
45,000,000.00 Rupiah Alat Baru
4,500,000.00 Rupiah
0.38629 -
7,822.35 Rupiah
45.00 Rupiah
7,867.35 Rp
21,750.00 Rupiah
1,845.00 Rupiah
2,812.50 Rupiah
- Rupiah
- Rupiah
26,407.50 Rp
34,274.85 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
150.00 HP
15.00 Ton
5.00 Tahun
2,000.00 Jam
300,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
300,000,000.00 Rupiah Alat Baru
30,000,000.00 Rupiah
0.33438 -
45,141.26 Rupiah
300.00 Rupiah
45,441.26 Rp
217,500.00 Rupiah
18,450.00 Rupiah
18,750.00 Rupiah
- Rupiah
- Rupiah
254,700.00 Rp
300,141.26 Rp
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
100.00 HP
6.00 Ton
5.00 Tahun
2,000.00 Jam
100,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
100,000,000.00 Rupiah Alat Baru
10,000,000.00 Rupiah
0.33438 -
15,047.09 Rupiah
100.00 Rupiah
15,147.09 Rupiah
145,000.00 Rupiah
12,300.00 Rupiah
6,250.00 Rupiah
- Rupiah
- Rupiah
163,550.00 Rupiah
178,697.09 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
80.00 HP
0.50 M3
5.00 Tahun
2,000.00 Jam
250,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
250,000,000.00 Rupiah Alat Baru
25,000,000.00 Rupiah
0.33438 -
37,617.72 Rupiah
250.00 Rupiah
37,867.72 Rupiah
116,000.00 Rupiah
9,840.00 Rupiah
15,625.00 Rupiah
- Rupiah
- Rupiah
141,465.00 Rupiah
179,332.72 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
100.00 HP
4.00 M3
5.00 Tahun
2,000.00 Jam
250,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
250,000,000.00 Rupiah Alat Baru
25,000,000.00 Rupiah
0.33438 -
37,617.72 Rupiah
250.00 Rupiah
37,867.72 Rupiah
145,000.00 Rupiah
12,300.00 Rupiah
15,625.00 Rupiah
- Rupiah
- Rupiah
172,925.00 Rupiah
210,792.72 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
6.00 HP
- -
2.00 Tahun
2,000.00 Jam
5,000,000.00 Rupiah
2.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
5,000,000.00 Rupiah Alat Baru
500,000.00 Rupiah
0.65455 -
1,472.73 Rupiah
5.00 Rupiah
1,477.73 Rupiah
8,700.00 Rupiah
738.00 Rupiah
312.50 Rupiah
- Rupiah
- Rupiah
9,750.50 Rupiah
11,228.23 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
75.00 HP
- -
5.00 Tahun
2,000.00 Jam
100,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
100,000,000.00 Rupiah Alat Baru
10,000,000.00 Rupiah
0.33438 -
15,047.09 Rupiah
100.00 Rupiah
15,147.09 Rupiah
108,750.00 Rupiah
9,225.00 Rupiah
6,250.00 Rupiah
- Rupiah
- Rupiah
124,225.00 Rupiah
139,372.09 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
90.00 HP
1.60 M3
5.00 Tahun
2,000.00 Jam
300,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
300,000,000.00 Rupiah Alat Baru
30,000,000.00 Rupiah
0.33438 -
45,141.26 Rupiah
300.00 Rupiah
45,441.26 Rupiah
130,500.00 Rupiah
11,070.00 Rupiah
18,750.00 Rupiah
- Rupiah
- Rupiah
160,320.00 Rupiah
205,761.26 Rupiah
20.00 % / Tahun
- Rp / Jam
- Rp / Jam
- Liter
11,600.00 Liter
12,300.00 Liter
PLS6 50 M' Pasang Kabel DX 2x10 sqmm + Accessories (antar tiang / gawang)
Kabel DX 2 x 10 sqmm "Supreme" 50.0000 m1 X Rp. 0
Tukang Listrik 0.5000 org X Rp. 0
Pekerja 0.5000 org X Rp. 55000
Mandor 0.2500 org X Rp. 80000
Penyambungan beban 1.0000 ls X Rp. 0
JUMLAH
(1) (2)
PLS7 50 M' Pasang Kabel DX 2x16 sqmm + Accessories (antar tiang / gawang)
Kabel DX 2 x 16 sqmm "Supreme" 50.0000 m1 X Rp. 0
Tukang Listrik 0.5000 org X Rp. 0
Pekerja 0.5000 org X Rp. 55000
Mandor 0.2500 org X Rp. 80000
Penyambungan beban 1.0000 ls X Rp. 0
JUMLAH
(1) (2)
(1) (2)
PLS25 1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan
(1) (2)
Pekerja 0.5000 org X Rp. 55000
Tukang Listrik 0.5000 org X Rp. 0
Pengawas 1.2500 org X Rp. 0
Mandor 0.5000 org X Rp. 80000
JUMLAH (A)
PLS26 1 Set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
Pekerja 0.8750 org X Rp. 55000
Tukang Listrik 0.8750 org X Rp. 0
Pengawas 1.8033 org X Rp. 0
Mandor 0.7413 org X Rp. 80000
JUMLAH (C)
PLS27 1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
Pekerja 0.5000 org X Rp. 55000
Tukang Listrik 0.5000 org X Rp. 0
Pengawas 1.2500 org X Rp. 0
Mandor 0.5000 org X Rp. 80000
JUMLAH (D)
PLS28 1 Set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 2.8500 org X Rp. 55000
Tukang Listrik 2.8500 org X Rp. 0
Pengawas 2.0075 org X Rp. 0
Mandor 1.0000 org X Rp. 80000
JUMLAH (E)
PLS29 1 Set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 3.1000 org X Rp. 55000
Tukang Listrik 3.1000 org X Rp. 0
Pengawas 2.5000 org X Rp. 0
Mandor 1.2100 org X Rp. 80000
JUMLAH (F)
(1) (2)
PLS30 1 Set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 3.3000 org X Rp. 55000
Tukang Listrik 3.3000 org X Rp. 0
Pengawas 2.5782 org X Rp. 0
Mandor 1.2433 org X Rp. 80000
JUMLAH (G)
PLS31 1 Set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 3.8100 org X Rp. 55000
Tukang Listrik 3.8100 org X Rp. 0
Pengawas 2.6626 org X Rp. 0
Mandor 1.2650 org X Rp. 80000
JUMLAH (H)
PLS32 1 Set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 4.2500 org X Rp. 55000
Tukang Listrik 4.2500 org X Rp. 0
Pengawas 2.9287 org X Rp. 0
Mandor 1.2939 org X Rp. 80000
JUMLAH (I)
PLS33 1 Set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
Pekerja 0.9000 org X Rp. 55000
Tukang Listrik 0.9000 org X Rp. 0
Pengawas 2.1044 org X Rp. 0
Mandor 0.8418 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (J)
PLS34 1 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
Pekerja 0.8750 org X Rp. 55000
Tukang Listrik 0.8750 org X Rp. 0
Pengawas 1.6995 org X Rp. 0
Mandor 0.6798 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (K)
(1) (2)
PLS35 1 Set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
Pekerja 0.9000 org X Rp. 55000
Tukang Listrik 0.9000 org X Rp. 0
Pengawas 2.1044 org X Rp. 0
Mandor 0.8418 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (L)
PLS36 1 Set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
Pekerja 0.8500 org X Rp. 55000
Tukang Listrik 0.8500 org X Rp. 0
Pengawas 1.9554 org X Rp. 0
Mandor 0.7822 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (M)
RJAAN LISTRIK
-
275.00
400.00
675.00 - 675.00
-
275.00
400.00
675.00 - 675.00
-
275.00
400.00
675.00 - 675.00
-
275.00
400.00
675.00 - 675.00
-
137.50
200.00
337.50 - 337.50
-
-
27,500.00
20,000.00
-
47,500.00 - 47,500.00
-
-
27,500.00
20,000.00
-
47,500.00 - 47,500.00
-
-
275.00
400.00
675.00 - 675.00
-
41,250.00
20,000.00
-
61,250.00 - 61,250.00
-
41,250.00
20,000.00
-
61,250.00 - 61,250.00
52,800.00
-
293,150.00
53,280.00
-
-
399,230.00 - 399,230.00
40,000.00
-
220,000.00
40,000.00
-
-
300,000.00 - 300,000.00
-
41,250.00
20,000.00
-
61,250.00 - 61,250.00
-
55,000.00
26,640.00
-
81,640.00 - 81,640.00
-
33,000.00
16,000.00
-
49,000.00 - 49,000.00
-
27,500.00
13,328.00
-
40,828.00 - 40,828.00
40,000.00
-
220,000.00
40,000.00
-
-
300,000.00 - 300,000.00
52,800.00
-
293,315.00
53,280.00
-
-
399,395.00 - 399,395.00
-
-
550.00
400.00
950.00 - 950.00
-
-
550.00
400.00
950.00 - 950.00
-
550.00
400.00
950.00 - 950.00
-
-
5,500.00
2,000.00
7,500.00 - 7,500.00
-
-
5,500.00
2,000.00
7,500.00 - 7,500.00
-
-
5,500.00
2,000.00
7,500.00 - 7,500.00
-
- - -
48,125.00
-
-
59,306.40
107,431.40 - 107,431.40
27,500.00
-
-
40,000.00
67,500.00 - 67,500.00
0 Watt Son
206,304.00
156,750.00
-
-
80,000.00
236,750.00 206,304.00 443,054.00
50 Watt Son
206,304.00
170,500.00
-
-
96,800.00
267,300.00 206,304.00 473,604.00
0 Watt Son
206,304.00
181,500.00
-
-
99,464.00
280,964.00 206,304.00 487,268.00
206,304.00
209,550.00
-
-
101,200.00
310,750.00 206,304.00 517,054.00
206,304.00
233,750.00
-
-
103,512.00
337,262.00 206,304.00 543,566.00