ACKNOWLEDGEMENT
3. System Design
3.1. Interface Design
3.1.1. User Interface
3.1.2. Communication Interface
3.2. Detailed System Specification
3.2.1. Detailed System Design
3.2.1.1 Functional Flow of System
3.2.1.2 Data Flow of System
5. Appendix
5.1. References
• Banks may deploy their own assets in securities with consequent risk
to commercial and savings deposits.
Implementation Preliminary
Investigation
Determination of
System Testing Requirements
Developm ent of
Design of System
System
System development Life cycle consist of two major steps of System
analysis and design. It includes set of activities that analysts, designers and
users carry out to develop and implement an information system.
1. Preliminary Investigation
2. Determination Requirements
3. Design of System
4. Development of System
5. System Testing
6. Implementation
For this, the need arises to understand the viewpoint of two important
entities…
After carrying out these interviews, I drew conclusion about the Top
Management’s requirements and whether users are in support of the new
system.
Hardware Requirements
Server Machine:
Client Machine:
Printer:
Software Requirements
The Top Management reviewed the above factors and gave their
ascent. After the consent to request approval, the design was taken up.
Written documents and onsite observation just tell that how the
system should operate. They do not include enough details to allow a
decision to be made about the merits of system proposal, nor do they
present user views about the current system.
Design of System
The design that we have formed for the new system are given
as under:-
0-Level DFD
Account No
User
Account
Details
Bank
System
Transaction
Flow chart
ACC. NO. ADDRESS.
NAME BALANCE.
START
BANK
h
CUSTOMER
as
TRANSACTION Done
by
DEBIT CREDIT
START
CUSTOMER
has has
FIXED ACCOUNT
DEPOSITE
Transaction Process
TRANSACTION CUSTOMER
CURRENT BALANCE
DEBIT CREDIT
BALANCE
Testing & Debugging
Unit Testing:
Integration Testing:
Integration testing is performed after all the software units are combined
together. The objective here is to test the software interfaces. Project
team conducts the integration testing. Before entering integration
testing, it may be ensured that code review and unit testing have been
performed on the individual software modules.
I conducted the unit testing for finding errors and the results of the
unit testing are recorded and action initiated for rectification of the
errors/defects.
VALIDATION
Testing Process
APPENDIX
5.1. References