You are on page 1of 9

TIA EXAMPLE:

MIXED-USE
DEVELOPMENT
Proposed Fast Track Couplet and Bus
Rapid Transit (BRT) System
BONIFACIO GLOBAL CITY, TAGUIG
2017
OBJECTIVES Properly design and assess
the Fast Track Couplet and
Improve the road geometry,
signalling system, public
BRT system in BGC, as well transport services,
as improve its traffic signal pedestrian and cycling
system facilities in BGC for the
efficient and safe movement
of people and vehicles
within
METHOD

Data Review Survey Calibration Scenario


• MUCEP 2014 • O-D • Survey results Modelling
• Travel Time 2017 • Dynameq4
• Volume Count
• Traffic Signal
Design
DYNAMEQ4

The Dynameq traffic simulation


Its highly-tuned dynamic traffic
It provides a unique traffic moves individual vehicles on
assignment procedure achieves
simulation that moves individual lanes, with car-following models,
dynamic user equilibrium (DUE)
vehicles and captures lane-based gap-acceptance models and
route-choice faster and more
effects in far more detail than explicit signal timings normally
reliably than other microscopic
other mesoscopic approaches. associated with conventional
approaches.
microscopic models.
Proposed Fast
Track Couplet
and Bus Rapid
Transit (BRT)
System
BONIFACIO
RESULTS
GLOBAL CITY,
TAGUIG
THANK YOU

You might also like