att EFTY POWER
SYSTEMS CORPORATIO
Request for Quotation
Company: Bauer Foundations Philippines From: HEFTY POWER SYSTEMS CORPORATION
Attention: Ws. Jazreel Estipular Tel.#: (02) 759-9511
ToliMobile #: Mobilett: 0917 306 2955
EmaliAd: —_estipular@bauernetioh Email: _kysmendoza@heftypower.com.ph
Project: ‘Nabas-Caticlan-Boracay TL Project Contact Person: Kyle S. Mendoza
nae Description ty. | unit Unit Price ‘Total Price
[Bored Pile Foundations (see atta
details)
sched file for more
Grand Total Price
Toi Nox (02) 293°
"Ema nfo
Fey (on) 376 2055 | (02) 75
lefypowercom-phNABAS-CATICLAN-BORACAY TRANSMISSION LINE PROJECT
(138 KV / 230 KV OVERHEAD TRANSMISSION LINE PORTION)
‘Sp19.NCBOHTL.Vt-0414
SCHEDULE OF BORED PILE FOUNDATION
TOWERIPOLE NO. BURIED DEPTH | EXPOSED DEPTH
(As per etructure sty | TOWERTYPE | DIAMETER (D) | TOTAL DEPTH (Hd (H) REMARKS.
NC-01 DraDua 200 20.007 19.00 1.00
NC-03. DiTaten5-21-230 2.50 20.00 19.00 7.00
NC-04 Ds4 4.80 17.00) 15,50. 1.50
NC-08 Da4/DR4 1.60 78.00. 16.50 1.50)
NC-09 Diraten5-21-230 2.00 720.00. 18.50 1.50
NC-10- DQ4/DR4 1.60, 19.00, 17.50. 7.50
NC=12 DTTaten5-21-230 2.00 21.00 19.50. 1.50,
NC-13 DQ4/DR4 1.60. 18.00. 16.50. 1.50
NC-15 DQ4/DR4 7.60. 17.00) 15.50. 7.50
NC-19 DiTatens-Z1-230 2.50 22.00 21.00 7.007
NC-21 Draten30-Z1-230 2.50. 20.00. 18.00 2.00 with te beam,
Note: All dimensions indicated above are for bidder's reference only in their bid price proposal. Final dimension shall be based on the approved design of the bidder.SECTION A-A
RTS
NOTES :
‘ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED.
CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAY
PERIOD, fe = 211 kg/cm? (3,000 PSI).
REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF
PNS 49:2002, DEFORMED STEEL BARS GRADE 414 (FY = 60 KSI).
ALL ASPECTS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
LATEST ACI CODE.
DETAILS OF REINFORCING BARS SHALL CONFORM TO LATEST ACI CODE.
USE BUNDLE BARS IF CLEAR SPACING OF REINFORCING BARS IS LESS THAN
70 MM (MAXIMUM OF FOUR BARS PER BUNDLE).
SPLICING OF BARS SHALL BE STAGGERED WITH LENGTH OF SPLICING NOT
LESS THAN 40 x MAIN BAR DIAMETER.
PROVIDE 5 EXTRA 12 mm DIA TIE AT THE TOP OF THE CASE, SPACED AT
50 mm 0.C.
NO_SEPARATE PAYMENT WILL BE MADE FOR METAL SUPPORTS, SPLICING/
OVERLAPPING, WASTAGE, TIES, HOOKS, CHAIR, WIRE TIES AND ALL OTHER
APPROVED SUPPORTS TO INSTALL AND SECURE REINFORCING BARS
PROPERLY.
ef
‘BORED PILE ELEVATION
mea xevian,
STEEL TOWER FOUNDATION
TYPICAL BORED PILE DRAWING
"ELEVATION AND SECTION