This document is a budget plan (Rencana Anggaran Biaya or RAB) for the main stage at a Quran recitation competition (Musabaqoh Tilawatil Quran or MTQ) in the subdistrict of Mempawah Hilir in 2019. The budget includes the costs for materials and labor to construct the background and main stage structures, with a total estimated cost of IDR 15,834,000 (fifteen million eight hundred thirty-four thousand rupiah).
This document is a budget plan (Rencana Anggaran Biaya or RAB) for the main stage at a Quran recitation competition (Musabaqoh Tilawatil Quran or MTQ) in the subdistrict of Mempawah Hilir in 2019. The budget includes the costs for materials and labor to construct the background and main stage structures, with a total estimated cost of IDR 15,834,000 (fifteen million eight hundred thirty-four thousand rupiah).
This document is a budget plan (Rencana Anggaran Biaya or RAB) for the main stage at a Quran recitation competition (Musabaqoh Tilawatil Quran or MTQ) in the subdistrict of Mempawah Hilir in 2019. The budget includes the costs for materials and labor to construct the background and main stage structures, with a total estimated cost of IDR 15,834,000 (fifteen million eight hundred thirty-four thousand rupiah).
TINGKAT KECAMATAN MEMPAWAH HILIR TAHUN 2019 DESA SENGKUBANG
NO KETERANGAN VOL SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1 PEMBUATAN BACKGROUND PANGGUNG 9x12 M 1 Cetak Baliho 108 Meter Rp 25,000.00 Rp 2,700,000.00 2 Triplek 12 Lembar Rp 150,000.00 Rp 1,800,000.00 3 Gergaji 5 Buah Rp 85,000.00 Rp 425,000.00 4 Paku 3 Kg Rp 25,000.00 Rp 75,000.00 5 Paku Triplek 5 Kg Rp 15,000.00 Rp 75,000.00 6 Pisau Cutter 10 Buah Rp 15,000.00 Rp 150,000.00 7 Lampu LED 40 Gulung Rp 80,000.00 Rp 3,200,000.00 8 Spon 10 Lembar Rp 30,000.00 Rp 300,000.00 9 Kabel 50 Buah Rp 15,000.00 Rp 750,000.00 10 Lampu Hologen 8 Buah Rp 400,000.00 Rp 3,200,000.00 11 Terminal 15 Buah Rp 50,000.00 Rp 750,000.00 12 Colokan Kabel 50 Buah Rp 20,000.00 Rp 1,000,000.00 13 Lem Korea 4 Botol Rp 25,000.00 Rp 100,000.00 14 Kayu Rank 25 Batang Rp 15,000.00 Rp 375,000.00 15 Cat Minyak 5 Kg 2 Kaleng Rp 67,000.00 Rp 134,000.00 JUMLAH Rp 15,034,000.00 2 PEMBUATAN PANGGUNG UTAMA 9x4 M 1 Sewa Papan 1 Rp 500,000.00 Rp 500,000.00 2 Sewa Kayu 1 Rp 300,000.00 Rp 300,000.00 JUMLAH Rp 800,000.00 3 ESTIMASI PENGELUARAN 1 Pembuatan Background Panggung Rp 15,034,000.00 2 Pembuatan Panggung Utama Rp 800,000.00 JUMLAH Rp 15,834,000.00
Terbilang : Lima Belas Juta Delapan Ratus Tiga Puluh Empat Ribu Rupiah