CASE

CASE OF ASME BOILER AND PRESSURE VESSEL CODE 2891


Approval Date: October 12, 2017
Code Cases will remain available for use until annulled
by the applicable Standards Committee

Case 2891
Issuing a Certificate of Authorization with U2
Designator for Class 1 Pressure Vessels to a
Certificate Holder with U Designator Without a
Joint Review
Section VIII, Div. 2
(d) The Authorized Inspection Agency shall
Inquiry: Under what conditions may a Certificate conduct an audit to evaluate the Certificate
Holder who is in possession of a valid Certificate of Holder’s Quality Control System and its
Authorization with a U Designator be permitted to implementation for the construction of Class 1
obtain a Certificate of Authorization with a U2 pressure vessels in accordance with Section
Designator with a scope limited to the construction of VIII, Division 2. A report of the audit shall be
Class 1 pressure vessels in accordance with Section provided to the Certificate Holder and ASME.
VIII, Division 2 without the completion of a Joint The audit report shall include a
Review in accordance with Section VIII, Division 2, recommendation concerning the issuance of a
Part 2, Annex 2-G, clause 2-G.6.2? Certificate of Authorization with U2
Designator limited to the construction of Class
Reply:  It is the opinion of the Committee that a 1 pressure vessels in accordance with Section
Certificate Holder who is in possession of a valid VIII, Div. 2.
Certificate of Authorization with a U Designator may
be permitted to obtain a Certificate of Authorization (e) Upon ASME issuance of the Certificate of
with a U2 Designator with a scope limited to the Authorization with U2 Designator specified
construction of Class 1 pressure vessels in accordance above in (d), the Manufacturer may engage in
with Section VIII, Division 2 without the completion the construction of Section VIII, Division 2
of a Joint Review in accordance with Section VIII, Class 1 pressure vessels.
Division 2, Part 2, Annex 2-G, clause 2-G.6.2
provided the following requirements are met: (f) The Certificate of Authorization with U2
Designator will expire at the same time as the
(a) The Certificate Holder must hold a valid Manufacturer’s current Certificate of
Certificate of Authorization with a U Authorization with U Designator.
Designator on December 31, 2017.
(g) The Manufacturer will not be permitted to
(b) The Certificate Holder shall apply for renew the Certificate of Authorization with
authorization in accordance with 2-G.2 U2 Designator under the Code Case. A Joint
Review in accordance with 2-G.6.2 will be
(c) The Certificate Holder shall revise its Quality required.
Control System to address construction of
Class 1 pressure vessels in accordance with (h) This Case number shall be shown on the
Section VIII, Division 2, and shall Manufacturer’s Data Report.
demonstrate implementation of the Quality
Control System to the Authorized Inspection  
Agency.  
 
 
 
 
 
 