You are on page 1of 6
erunding balkti ales bution i coning sopneati 792, 7 Fr, Sock A, Onna haan No. 1, Jalan 8820/27, 47400 Petaing Jaye Tot (603) 7724 2088 Fox: (603) 7724 1948, Selengor Darul Ehsan, Malaysia, Webs: //bakticom Emel: pbaki@pbatti cam (Our Ref: PB 20153 (M148) 10 August 2016 Senior Project Manager Tribeca Real Estate Asset Mgmt Sdn Bhd Suite 7.02, Level 7 WORK @Clearwater ‘Changkat Semantan, Damansara Heights 50490 Kuala Lumpur Attn: Mr. Eddy Yau Wen Siong (Fax: 03-2093 0108) Email + eddy.yau@tribeca.my Dear Sir, PERMOHONAN KELULUSAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21, AKTA PERANCANGAN BANDAR DAN DESA (AKTA 172) BAGI CADANGAN MEMBINA HUB PEMBANGUNAN KEMAHIRAN JOHOR (SKILLS HUB) DI ATAS SEBAHAGIAN LOT 10200 HHS(D)28628, MUKIM ULU SUNGAI JOHOR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM * Minutes of Meeting The M&E system presentation on the 9 August 2016 at the office of My-Partners Properties Sdn Bhd refer. Please find enclose herewith the minutes of meeting as per the above presentation. ‘Thank you. ‘Yours faithfully PERUNDING BAKTI SDN BHD Sy IR LIM CHEE HUA For Managing Director cc: ATSA Architects Sdn Bhd No. 45, Jalan Tun Mohd Fuad 3 ‘Taman Tun Dr. Ismail 60000 Kuala Lumpur (Pax: 03-7727 1875) : En, Ahmad Safuan Basiron ihmad@atsa.com.my Tara Ct ee ‘Our Ref: PB 20153 (M148) Senior Project Manager Tribeca Real Estate Asset Mgmt Sdn Bhd Suite 7.02, Level 7 WORK@Clearwater CChangkat Semantan, Damansara Heights 50490 Kuala Lumpur (Fax: 03-2093 0108) perunding bak 10 August 2016 Attn ;Mr, Bddy Yau Wen Email : eddy.yau@tribeca.my My-Partners Properties Sdn Bhd No. 3A-20, Jalan PJU 8/3 Bandar Damansara Perdana 47820 Petaling Jaya Selangor Darul Ehsan (Fax: 03- 710 0503) SLP Perunding Sdn Bhd 8A, Lorong Datuk Sulaiman Satu ‘Taman Tun Dr. Ismail 60000 Kuala Lumpur (Fax: 03-7727 8372) ECHL SWekPBZOIS ANI} IO-8-16 zinh@mypartners.com.my in, Zakbah Harun Attn : Ms. Alison Shreenawathi Email : admin.slp@hpl-sipeonsult.com PRESENTATION OF PROPOSED M&E SYSTEM FOR TVET Date 9 August 2016 Time 10.00 am Venu My-Partners Office Attendance NO. NAME, ‘COMPANY 1. | Cik: Raziah Hamdan ‘My-Partners Properties Sdn Bhd (MP) 2. | En. Salleh Hassan My-Pariners Properties Sdn Bhd (MP) 3._| Ir. Aftab Ahmad SLP Perunding Sdn Bhd (SLP) 4.___| Mr. Eddy Yau Wen Siong, Tribeca Real Fstate Asset Mgmt Sdn Bhd (TRI) 3._| Ar. Ahmad Safuan Basiron "ATSA Architect (ATSA) 6._| Tr. Lee See Wee Perunding Bakti Sdn Bhd (PB) 7.__[ Ir. Lim Chee Hua Perunding Bakti Sdn Bhd (PB) 8.__| Ir. Azam B Mohd Si Perunding Bakti Sdn Bhd (PB) 9. | Hj. Mohd Nasir Jamaluddin Perunding Bakti Sdn Bhd (PB) NO. MATTER DISCUSSED ‘ACTION BY 1.0 | Chairman welcomed all presence to the meeting 2.0 | Elevator System 2.1:0 PB proposed 15 person capacity elevator for both nfo block A&B. ZIT Tribeca inform that a “home” if type of elevator woulbe be enough, but choose the maximum capacity available. 21.2 The maximum capacity available is 5 person at 9 PB meter / minutes but’ will not be handicapped friendly. This type of lift will be adopted if no objection is received by the 16 August 2016, For Block B and the 15 person capacity at 60 m/min for Block A shall be maintain 2.2 | Smoke Detectors 2.2.1 Tribeca instructed for all smoke detectors to be TRI delected from 1) Lift Lobbies, 2) Hotel Rooms 3)_ Store 2.3 | Clean agent system for Fire Protection System 2.3.1 Clean agent shall not be provided for all switch TRI7PB room, generator room, Block K and all is term as optional cost 2.3.2 _FM200 system shall be under provisional sum TRI/PB 2.3.3 To omit CMS system and replace it with I-Skada PB as required by Jabatan Bomba NO. MATTER DISCUSSED ‘ACTION BY 2.4 | All sub fire alarm panch needs to be indicated at all PB building block and link via armoured cables to Block A (control room) 2.5 | Plumbing System 2.5.1 Omit the oil interceptor for Block I (motor vehicle PB Jab) as instructed. 252 Relocate all internal double cover inspection PB chamber at toilets to outside as instructed 2.5.3 Provision of oil interceptor for Block F, J1 & 2, PB/TRI capacity cannot be determined due to lack of information 25.4 Omit all hot water heaters to taps & showers TRI7PB 2.5.5 Pump rooms needs to be provided for all suction ‘ATSA pumps to protect from rain & sun 2.6 | Rain Water Harvesting 2.6.1 To provide rain water harvesting at Block A only Info ive to it being in Phase I as agreed by all 2.62 The roof capacity for Block A in 1638m2 and PB/TRI basing on 100m2 generate 1m3 of rain water, the ‘amount obtain is 16m3 or 17 cubic meter of rain water to be collected i.e 17,000 litres 2.63 The main rainwater storage tank shall be 2600 Tnfo litres to cater for all the 70 number of landscape taps points. The top up water shall be by SAI supply. 27___| Air Conditioning & Ventilation 27.1 To delete all ventilation system for all disable PB toilets as instructed, 2.72 To provide ventilation for VIP toilets only and all PB other areas in toilet to be naturally vented or by ceiling fans. 273 To relocate condenser units to RC flat roof PB location at Block A. 274 To provide exhaust fans for all kitchen and not, PB kitchen hoods for Block B. 2.7.5 Noair conditioning system for dishwashing areas, PB store and hotel rooms to use wall mounted types and not cassette units as proposed. 2.7.6 To delete completely the air conditioning system PB for Block F & JI. 2.7.7 No provision of mechanical ventilation for Block J1 & J2.as instructed. 2.7.8 Provision of exhaust fan minus ductwork for all MP/PB workshop at Block J2 and capacity of exhaust fans will depend on the nos of bays exhaust requirement to be provided. 2.7.9. Provision of air conditioning system for warehouse PB wentory room at Block I. NO. MATTER DISCUSSED ‘ACTION BY 2.8 Electrical Systems and Telecommunication Systems 2.8.1 To revised main cable route from MSB room to block A and Block B. Cable route shall be along the access road in order to avoid any building piling/foundation works since the project will be constructed in 5 phases PB 282 Landscape lighting provided by Landscape Architect are as follow (Fitting by BEP and cable and feeder pillar by PB): = Compound Lights — 81 nos = Spot Lights ~ 83 nos ~ Bollard lights ~ 40 nos form BEP since the ‘number of lighting points required are too many. PBIBEP Landscape To provide 2 numbers of 20A TPN Isolator at roof level of Block A to be used for any future events. ‘organize by the management. PB To provide provision of power supply requirement for Rainwater Harvesting Pumps. PB ‘Lux level for office area shall be at least 200 Tux downlights are being used due to ceiling design requ PB To allocate one pantry room at Block A. PB to provide 5 nos of 13A switch socket outlets (SSO) atthe pantry area. 2 nos from essential supply and 3 nos from normal supply. ATSAIPB 287 Position of all SSO at ground floor evel and in all toilets shall be at 1.2m height from FFL and for other level shall be at 0.3m height from FFL. PB 288 To provide normal ceiling fans for all toilets with the switch and regulator located inside the toilet. PB 289 To provide power supply for exhaust fan in all disabled toilets. PB 2810 To revise layout for both guard house based on the discussion. PB to provide one data and ‘clephone point at the guard house. ATSAIPB 28.11 ‘All store rooms to be change to utility rooms Info. 2.8.12 To omit 4 nos of stalls at Block H and to add one kitchen area at the Café, ATSA/PB 2813 To omit light fitting for all mock up hotel rooms/suites. To provide only 3 nos of lighting points, one 13A SSO and 30A SPN Distribution Board PB 28.14 To check and adjust the position of all 13A SSO behind all doors. PB 28.15 There shall be no ceiling provided at single ‘yolume workshop in Block 2. Light fittings shall bbe change to high bay type of light fittings. PB NO. MATTER DISCUSSED ‘ACTION BY 2.8 | Blectrical Systems and Telecommunication Systems info 2.8.17 Light fittings in Block T shall be changed to ATSA/PB downlight in order to follow plaster ceiling layout, Number of lighting points shall remain the same. 2.8.18 The orientation/position of all fluorescent light PB fittings shall be standardized. 2819 To show location of Control Panel (CP) for PB outdoor unit of VRF system, Coldwater pumps ‘and Hoseree! pumps. 28.20 Venlilation shall be provided at Kitchen area in PB Block A. 2.8.21 To provide enough 13A SSO in ELV riser. PB 2.822 Telephone points and Data points for meeting PB rooms shall be located above the ceiling. 28.23 For offices Telephone/Data Telephone panel shall PB be provided. Future connection shall be done by the end user since no furniture layout provided. 2.8.24 One number of telephone and data points shall be PB provided at guard house 1 and 2, 2825 My-pariners to advise on location of My-Pariners/PB Telephone/Data Telephone panel based on proposed design by PB.

You might also like