20th May Inline Report View COTT COTT


Pre Final Report Cycle Time Cycle Time
Final Report Rivew WIP WIP
Alter % Review Process Inovation Process Inovation
Corrective action Plan Floor Efficiency Floor Efficiency
Preventive Action Plan Bottle Neck Process Bottle Neck Process
New Job Assign Reduce Bollte Neck Reduce Bollte Neck
Tomorrow Target Efficiency Tomorrow Target Efficiency
Tomorrow Changeover with Plan Tomorrow Changeover with Plan
New Job Assign New Job Assign
Roni Nasimul
Input facility Given all Line Input facility Given all Line
Cutting Lay Plan Shipment Plan
Fabric Quality Performance
Fabric Need for plan execute
New Job Assign
Tareq Mostaq
Input Short Size Wise Color wise Tomorrow Pre Final Inspection Plan
Can Be Short day After Tomorrow Clossing Style Tomorrow Final Inspection Plan
Rejection % High Those Style Name Tomorrow Shipment Plan
Today Reconsilation Submit Pre Final Inspection Plan
Tomorrow Reconsilation will do Final Inspection Plan
Shipment Plan
New Job Assign
Maruf Arzu
Print Plan Cutting APIS
Print Delivery Plan Production Target
House Keeping
Corrective Action reagrdong Today Claim From Floor