Cust-O-Fab Specialty Services LLC
Site Specific Quality Manual
Pressure Vessel Sign Off
Contents
Paragraph
Number
10
20
30
40
so
60
10
Exhibits
2m
m2
213
Corporate Quality Control Manager Approval
Revision
Section 27
Section: 27
Revision: 0
Page 1 of 4
Title Page
Purpose 2
Scope 2
References 2
Responsibilities 2
General Requirements 2
Form Usage 2
Records 4
‘Vessel Closure Fort
Exchanger Inspection Sign-O1
‘Tower Closure Form
Dac Leda
Sigaatue
a ee
adCust-0-Fab Specialty Services LLC Section: 27
Site Specific Quality Manual Revision: 0
Pressure Vessel Sign Off
Page 2 of 4
1.0 Purpose
1.1. To define a procedure forthe Client fo allow closure of equipment assembled by
(Cust-0-Fab Specialty Services.
20 Scope
2.1 This procedure details QA/QC methods to assure that all Fixed Equipment has been
‘properly cleaned, inspected and any repair work has been performed and signed off
complete by the proper personnel
3.0. References
3.1 ASME See VIII Div.1 and Div2
32 APISIO
33. Client/Customer Specifications
4.0 Responsibilities
4.1. Itisthe responsibility of the Site Quality Control Manager or their designee to initiate
all pressure vessel signoff,
42 Itis the responsibility of the Superintendent or Foremen to notify the site quality
‘control department or designee of equipment tat is ready to be assembled or closed.
43. Itisthe responsibilty ofthe Site Quality Control Manager or ther designee tofilethe
completed Pressure Vessel Sign Offs in the appropriate job folders.
5.0 General Requirements
5.1 Once equipment is ready for assembly, cach piece of equipment shall have @
CClosure/Sign-Off form completed to note proper cleaning and that ll repairs have
‘been performed and are acceptable,
60 Form Usage
641 Vessel Closure Form (Exhibit 27-1) shall be used for equipment such as drums, pots,
and tanks and will require sign offs for the following
6.1.1. Repai/Totemal work is complete and sccepte.
Section 27
aww aa
| oeCust.0-Fab Specialty Services LLC ‘Section: 27,
Site Specific Quality Manual Revision: 0
Pros:
62
63
Section 27
re Vessel Sign Off
Page 30f4
follows:
6.1.1.1 Operations
6.1.1.2 Client Inspection
61.13 Engineer
6.1.2 Approval to close vessel. Signatures required areas follows:
6.12.1 Operations
6.1.22 Client Inspection
61.23 Engineer
6.1.3 Vessel is elosed and accepted,
6.13.1 Operations
6.132 Client Inspection
6133 Engineer
atures required ae as follows:
Exchanger Inspection Sign-Off (Exhibit 27-2) shall be used for Heat Exchanger sign-
off of cleanliness and repairs. This form will require sign offs forthe following:
62.1. Shel inspection. Signatures required are a follows
62.1.1 Operations
62.12 Client Inspector
62.2 Bunale inspection, Signatures required are as follows:
62.2.1 Operations
62.2.2 Client Inspector
62.3 Other Exchanger Components (Channel, Cover, Floating Head, Bell)
Signatures required areas follows:
62.3.1 Client Operations
623.2 Client Inspector
‘Tower Closute Form (Exhibit 27-3) shall be used for Towers with internal Trays for
both acceptance of cleanliness, internal repairs, and closure of Tower. This form will,
require sign offs forthe following:
63.1. Internal Inspection, repairs, and required NDE. Signatures required are as
follows:
63.1.1 Client Inspection
63.2. Internal Tray installation. Signatures required areas follows:
63.2.1 Client Inspection
ae a
oeCust-0-Fab Specialty Services LLC Section: 27,
Site Specific Quality Manual Revision: 0
Pressure Vessel Sign Off
Paged of 6
63.22 Operation
6323 Process Engineer
633 Intemal Manway installation. Signatures required areas follows:
633.1 Client Inspection
633.2 Operations
6333 Process Engineer
63.4 Extemal Manway Closure. Signatures required are as follows:
634.1 Client Inspection
6342 — Operations
6.3.43 Process Enginoer
10 Records
a
Section 27
‘Closure Forms shall be updated daily an filed inthe appropriate equipment package
and job file.Cust0-Fab Specialty Services LLC Section: 27
Site Specific Quality Manual Revision: 0
Pressure Vessel Sign-off Exhibit 27-4
RE) GE EET) Vessel Closure
eG
Form
Customer: Job Not
Location:
at Equipment No:
WORK IS COMPLETE AND ACCEPTED
Operations: Dak
lent inspection: Date:
Engineer, Date
[APPROVAL TO CLOSE VESSEL
Operation Date:
‘lent inspection Da
Engine ate:
VESSEL CLOSED AND ACCEPTED
Operations: bate:
lent inspection ate
Engineer bate:
RemarksCust-0-Fab Specialty Services LLC Section: 27
Site Specific Quality Manual Revision: 0
Pressure Vessel Sign-Off Exhibit 27-2
GPE FEE ae
ay a
‘Exchanger Inspection Sian-Off
ent: Job Number
Location
Unit Description of Work:
Shell: lent inspector
Operation
fecenines Ot
Bundle: Cent inspector:
Operations:
(foreman nt)
Channel Head Date:
Date:
Floating Head: Date:
Date:
roams 4)
Shell Cover: Client Inspector. Date:
Date:
(rere st
Cent inspector.
Operations
or ceantnes sy)
ematcommenny
‘ae Wan was Ton Clapton an penn ead cea Wee proratCust-0-Fab Specialty Services LLC Section: 27
Site Specific Quality Manual Revision: 0
Pressure Vessel Sign-Off Exhibit 27-3
TIE CD TA
ei Gap
(CUST.O-FAB SPECIALTY SERVICES, Lic
Tower Closure Form
customer: Job Wo:
Location: Equipment No
Date Unrheaded!
Cleanliness inspection: Operations:
Inspection Date:
Process Eng: Date:
Internal inspection Complete Date
Repairs Completed Date
INDE of Repairs Complete: Date:
Engineering inspection Date:
"ray installation Competed
Customer inspection: ate:
Operations: Date:
Process Engineer: ate:
‘eared for Tray Manway installation
‘Customer Inspection: Date:
Operations: bate:
Process Engineer bate:
(Cleared ta lose External Manways
‘customer Inspection: Date:
Operations Date:
Process Engineer Date: