You are on page 1of 2

Longitud Dif.

Nivel
Tuberia(m) 20 Coef HW 130 Diam (mm) 200 (m)

Q 1 Bomba H Q 2 Bombas Q 3 Bombas Q (l/s) Htotal (m) Vel (m/s)


0 30.0 0 0 0.0 6.00 0.0
50 26.0 100 150 100.0 6.93 3.2
100 22.5 200 300 200.0 9.37 6.4
150 19.5 300 450 300.0 13.13 9.5
200 16.5 400 600 400.0 18.15 12.7
250 12.5 500 750 600.0 31.74 19.1
300 6.0 600 900 700.0 40.25 22.3

45.0

40.0

35.0

30.0

25.0 1 bomba
2 bombas
20.0 3 bombas
15.0 Sistema

10.0

5.0

0.0
0 100 200 300 400 500 600 700 800 900 1000
6

Perdidas
Long (m)
0.00 6 13.26
0.93 6.5 13.76
3.37 7 14.26
7.13 8.2 15.46
12.15 10 17.26
25.74 14 21.26
34.25 16 23.26

You might also like