You are on page 1of 2
a PT. INDOBARUNA BULK TRANSPORT REQUISITION LIST NO R/: 108/RL-OPRTKS/VW/2019 MS/SS.TANGKAS. Dept: ENGINE Date fjunze,2019 No. DESCRIPTIONOFITEM —/ITEMCODE | UNITS! ONHAND | REQ| REMARKS = a Ke 3] 78 a Requested By: Ox Hori Purwanto peratONS DPE PT. INDOBARUNA BULK TRANSPORT BUNKER CALCULATION - OPERATIONAL DEPT. RLNumber -OPR + 108/RL-OPR/TKS/VI/2019 Port of toading Teluk Bayur Vessel Name 2 MV.TANGKAS Port of Discharging Panjang - Lampung Voyage : 174 speed 10,0 knots ETAPort of Bunker Panjang, 25 June 2019 Total Distance 4835 nm Estimate Track { PIG-TLB-P1G (1 voy) Total aling Tine 440 days Cons. MFOME/ | Cons. HSD Cons. HSD AE] Cons. HSD C¢/] Cons. HSD escripti ro} Total uso tation ORR Gon Day Boller/ Day /Day Day Maw AE/ Day Teel fo. lat Loading Port 2,00 0,00 0,70 320 0,00 2,0 0,00 3,60 |At Sea 4,00 10,70 0,00 1,10 0,00 0,00 42,80 440 lat Discharge Port 2,00 0,00 070 1.20 6,00 240 0.00 20,60 Estimate Anchor ime 1400 0,00 070 oas 0,00 000 0,00 214,70 Fuel Spare 20,00 | 2000 {rotat Required | 6290 | 7520 BUNKER REQUISITION - OPERATIONAL DEPT. Tank Capacity Task Supply information —] ‘Bunker Supply Plan Description 100% 85% Date ‘Quantity ROB ‘Supply Req. [ROB + Supply, MFO 294,42 250,26 04/05/2019 90,00 50,00, 65,00 115,00 |HsD/ MGO 186,02 158,12 05/02/2019 100,00 36,00, 75,00 111,00 Notes: “all bunker calculation & requisition in kilo iter (KL) *ROB: Estimation ROB Port of Bunker Operatfons Manager Tangerang, 24 Juni 2019 Approved by, Requested by, (COW Hari Purwanto Vessel Operator

You might also like