BIM_03 CLASH DETECTION VISUAL CHECK REPORT (STRUCTURE VS ARCHI) DATE: 13.10.

2019

S.N ISOMETRIC VIEW PLAN VIEW DESCRIPTION LOCATION

Secondary Beam Should


1 Level - 3 (Level_4 Framing)
support

2 Handrail Set in to the wall Level - 3 On Grid A1 & AC & AD

Stair landing beam must


3 Level - 3 On Grid A1 & AC & AD
support

Structural Stair Vs Archi Stair


4 Should align (50 mm level Level - 3 On Grid A1 & AC & AD
difference)
BIM_03 CLASH DETECTION VISUAL CHECK REPORT (STRUCTURE VS ARCHI) DATE: 13.10.2019

S.N ISOMETRIC VIEW PLAN VIEW DESCRIPTION LOCATION

Structural Beam on the air. It


5 should have support (beam, Level - 3 Btw Grid A1 & A2, AA & AD
column or structural wall)

Along GL A3,A4,A6,A7,A8,A9 ,
6 Doors should align with wall Level - 3 Between GL AB & AC , AD &
AE

Riser Clash with Floor Slab & Btw GL A3 & A4, Btw GL AC &
7 Level - 3
Beam AD

8 Riser Clash with Floor Slab Level - 3 Btw A9 & A10, On Grid AC
BIM_03 CLASH DETECTION VISUAL CHECK REPORT (STRUCTURE VS ARCHI) DATE: 13.10.2019

S.N ISOMETRIC VIEW PLAN VIEW DESCRIPTION LOCATION

Btw A8 & A9, Btw Grid AC &


9 Riser Clash with Floor Slab Level - 3
AD

10 Riser Clash with Beam Level - 3 On GL A8 , Btw Grid AC & AD

11 Riser Clash with Beam & Slab Level - 3 On GL A6 & Grid AC

12 Riser Clash with Beam Level - 3 On GL A5 & AC


BIM_03 CLASH DETECTION VISUAL CHECK REPORT (STRUCTURE VS ARCHI) DATE: 13.10.2019

S.N ISOMETRIC VIEW PLAN VIEW DESCRIPTION LOCATION

Along GL A3 & A4, Btw GL


13 Riser Clash with Floor Slab Level - 3
AD & AE

Structural Beam on the air. It


14 should have support (beam, Level - 3 On Grid A9, Btw AC & AD
column or structural wall)

Riser Clash with Structural


15 Level - 3 Btw A6 & A7, On AD
Floor

16 Handrail Set in to the wall Level - 3 On Grid A9, Btw AC & AD


BIM_03 CLASH DETECTION VISUAL CHECK REPORT (STRUCTURE VS ARCHI) DATE: 13.10.2019

S.N ISOMETRIC VIEW PLAN VIEW DESCRIPTION LOCATION

Stair landing beam must


17 Level - 3 On Grid A9, Btw AC & AD
support

Structural Stair Vs Archi Stair


18 Should align (50 mm level Level - 3 On Grid A9, Btw AC & AD
difference)

Btw A6 & A7, Btw Grid AA &


19 Riser clash with fioor slab Level - 3
AB

Riser location difference Btw A6 & A7, Btw Grid AA &


20 Level - 3
between L2 & L3 AB