- Load applied on model is in the height of 1 st cast , 2,5 m.
and model assume on plywood area 1 m x
1m which means height concrete on end (1m) is 2,2 m.(not in cantilever section) - Section drawing in revision is (200x100) is different on our design. And it’s obvious that stress section is too excessive. So we made an option to taper the beam (200x200) with beam (200x200) so sagging moment can allowable. - Bending moment on cross beam is wrong to due mistake when input load. - Value load is true that it should acted upward, But why do reaction on span beam should reduced by 20%. - So if KSO insist that beam 400x300 has enough capacity assuming on ratio plastic modulus to elastic modulus, we can accept it. - Concrete height on 1st cast will be shown on drawing & report (page 1) - To confirm the roro system has 50 T capacity, we include roro shoring load test report.