You are on page 1of 4
(GSTIN : 22AIPPPS946F1Z2 Ta No 22191804890 PanNo APPPSSA6E Regs No 7O26RPRICE:2006 Office Address : Ward No.20, Shiv Vihar, Silpahari Road, Bil Reside! idya Nagar, Bi ® CG ENGINEERING €6-” Mob.7987097208 195001 hosp 879@gmalcom pur (C.G.) 495004 aote 19/0#/19 Budgetory Quotation for Electrification of Extended Shunting Neck at Chirimiri item Description of the item Unit | Qty | Rate(Rs.) | Total amount No (Rs) ‘Schedule -A Foot by foot survey & preparation of OHE pegging plan) TKM| 0.5] _20800.00) 1020.00 1 including modticaton/aismanting works Preparation of Design & Drawing of Overhead equipment) TKM|” 0.5] 26800.00| 1340.00 2. [Tramway type (regulated) including modification Dismanting works [Concrete for foundation & Pith () Ordinary soivHard soit inicuding rock required chieseling) Cum] 15] 10500.00/ _157500.00 (Grade M-15) i) Rocky sol Cuml 12] 11500.00) 13600000] Supply and Manual erection of traction masvother special 4 {masts (BFB/RSJIB-Seres) including terminating structures & gantry masts/along track feeder () Supply mi] 4[__ 146500.00] _490000.00] (i) Erection wT] __4{___ 8500.00] 3400.00 5_[Supply of Hard drawn grooved copper contact wire (107 Sq.mm) Km] 040) 1250000.00) —354000.00 6 [Supply of riddle wire Km 0.10] 77300000] 7300.00 Supply & Erection of fabricated steel works other than mast 7 including Dwarf mast etc (Supply wT] 24] 142000.00] _340800.00] (i) Erection mT] 24[ 10500.00] _25200.00] @_| Supply & Erection Guy rod assembly () Supply Nol 2] 19500,00| _31000,00] (i) Erection Nol 2) 1265.00] 2530.00 Supply & erection of Bracket assembly for Tramway Type] 9 |OHE without insuators () Supply. Nol 10] 19136.00]_186210.00] (i) Erection Nol__to 1450.00] 14500.0] Page Lof4 item Description of the item Unit | Qily ] Rate (Rs) | Total amount No Rs.) 40_|[SeP®1 & erection of OHE Tramway ype Regulated) () Suppiy Km] 040} 4650000[ _ 18200.00| (i) Erection Km 0.40 62350.00] 2440.00 +4 [SupBW & erection of Regulating equipment (Tramway type] IOHE - regulated) () Supply No] 4] 6250.00] _62500.00] fi} Erection Noli] 4500.00} 450000] Supply & Erection of materials for termination of single] 12 overhead equipment conductorfexciuding 9 ton insulator) Hor tramway type OHE (i) Supply. No. 2 11500.00] 2300.00} (iy Erecton Nol 2] 1760.00] 362000] 13, | SUPPIY of are (105 sqmm) Copper jumper (jumper) Mer] 5] 18200.00) 6250.00 14_| Erection of copper jumper (105 sqmm) wel 800.00 4000.00} |Supply & Erection of Structure bond (Wire bond type’ M.S| 1 |rttype h (Supply Each 12] 850,00[ __10200.09 (ii) Erection Each] 12] 310.00} 3720.00} 16. [SUPP & Erection of Transverse and Special Bond (Wire} bond type, M.S Flat Type) [| Supply Each] | 530.00 1590.00] (i) Erection Each) 3 250.00] 750.00 7 |Supply & Erection of longituditinal bond (Wire bond/ M.S| Flat type) () Supply Each| 55] 350.00) 30260.00] (i) Erection Each! 60] 320.00[ __16000.00 1q_[SUPRY & Erection of single earth electrode with earth pil box cover etc complete () Supply Each! 3| 4258.00] 1274.00 (iy Erection Each] 3] 1560.00] 4650.00 ‘Supply & Erection of pull of arrangement for one OHE 19 (excluding 9 tonne insulator) Tramway type without Insulator () Supply Nol 1" 1750000} 1760.0] i) Erection Nol 1] 1360.00] 1350.00 20_|Supply & erection of retro reflect caution boards Electric Engine stop Board i) Supply Noli] __5600.00| 550000] i) Erection Nol 600.00 600.00] Page 2 of 4 Tem Description of the em Unit] Gly | Rate (Rs) | Total amount No (Rs.) 2. Power Block working imit Board (0 Supply Nol 2 3500.00] 7000.0] (i) Erection Nol | 600.00] 4200.00] 21_| Supply & erection of number plates (Retrorefiect) () Supply Nol 12] 750,00{ 9000.00 (i) Erection Nol 12] 180,00] 2160.0] ‘22_|Supply of insulator 1050mm CD (Stay Nol 10] 4026.00} 4026000] (i) Bracket Nol 10] 4026.00} _40260.00] OE Nol 3] 6126.00} __18378.00] (c ) Erection of 1050mm CD insulator lst Nola] 612600} 1837600] 73 [Supply & erection of adcitona tings at tumouistoverans ey I Supply Nol 1] 360000] 3500.00 Erection Nol 1] 125000] 1250.00 28 [Supply & Erection of earth bus of MS flat size 50mm x 6mm] I Supply Mel 30] 655.00] 19650.00 (i) Erection Cr 85,00] 2550.00] 25 _|Erection under Power block a) [Regulating equipment Tramway Nol 1] 4500.00] 4500.00] ») [Cutin insulator 9 Nol 2 1750.00| 3600.00 ‘©)_|)) Termination of OE Single Nol 2] __1750,00[ 3500.00] )_[Large jumper wire (105) Mil 600.00] 3000.00 @) [Additonal tings at tumouts / overlaps Nol 1] 1250.00] 1250.00] 1) |Cantiever Tramways Nola] 1450.00) 4360.00] @)_|OHE Tramway Km) 040] 6296000] 4940.00 26 [Adjustment of OHE after Tower Wagon checking Span| 12 360,00] 4200.00 Spicing & extension of an overhead equipment under] No] 1] 4500.00] 4500.00 27” power block at Tramway OHE 28 _|Siewing of OHE Tramway Span] 2] 2750.00] 5600.00 39. | Wanster of OHE fom one mast to another under power] No| 2) 3600.00] 720000 [block 30_ [Dismantling charges @)_|Under Power Block i)_[Cantiever Tramways 3[___125000[ 3750.00 )_[Under Non Power Block i) _|Cutting of Mast 2 4200.00} 8400.00} i, [SPs Yo] 5500.00 360.00] 31_| Staton Working Rule Diagram Nol 6] _26500.00] _159000.00 Page 3 of 4 item Description of the fem Unit] Qty | Rate (Rs) | Total amount No (Rs) 32_|Anti corrosive painting on cantilever & mast Nol 22 7500.00] 165000.) 33_|Manning of Section Without gun Man| 3] 1200.00] _36000.00} a) month [mann Man| 1] 2500.00] 2500.00} month Repainting/Reconsiruction of Damaged drain by concrete] cum} 5] 10500.00] 2500.00 mix of 1:24 35_|Prorata cost on testing of insulator No| 22| 1000.00} 2200000} % |Site visit by Railway Official & Processing of EIG clearance Ls| 300000.00| 300000.00| 37_[Total Rs. (Schedule - A) 3128770.00| [Schedule -B) 3p. [S8PD1 & Instalation of Sectioning diagam #0520 Nol 6] 1200.00} 7500000] 39_|Supply of station working rule diagram Nol 6] _26600.00} 169000100] 149. [SuPBlY + Erection of Antcreep for Tramway type OHE [Supply Nol 1] 75800.00] __75600.00] Erection Nol 1] 4500.00] 4500.00] a |Supply + Erection of section isulator for Tramway type OHE| Supply Nol t] 5530.00] 5530000] [-__[Erection Nol 1 4500.00] 4500.00 42_[Dismanting of Tramway OHE under Power Block Km] _042{ 6500.00] 7800.00] 43_[Total Rs. (Schedule - B) 38190000] Note 1 _Allmaterais are to be supplied by the Tenderder. 2 All materials are to be procured from CORE/RDSO approved regular surces. 3 Inspection of materials shall be done by RITES/ Consignee. 4 All Works are to be carried out as per Railway Electrification Standards, 5 Rate shall be exclusive of GST but inclusive of all other incidentals. 6 Charges for power block and hiring of Tower Wagon wil be paid by the SCL. For, C.G. Engineering Co. €.G. Engineering Co. Page 4 of 4 Peon Fgh nord Signatory

You might also like