You are on page 1of 3

DASAR STRUKTUR & KONSTRUKSI BANGUNAN

SEMESTER 1 2013/2014
TUGAS RESPONSI

1
3.00 2.50 4.50
2.00

-0.20

3.00
TERAS
1.00

-0.050 -0.02 -0.050

1.50
KM/WC
-0.05
3.00

R. TIDUR R. KELUARGA
±0.00 ±0.00 F -0.200

1.50
2 2
12.00

DAPUR
-0.02

2.00
R. TAMU
R. TIDUR
3.00

±0.00
±0.00

50 50
-0.050
TERAS
-0.02
3.00

3.00

CARPORT
-0.150 -0.20

3.00 2.50 1.50 1.00 2.00


10.00
1

Denah Lantai Dasar


Skala 1:100
DASAR STRUKTUR & KONSTRUKSI BANGUNAN
SEMESTER 1 2013/2014
TUGAS RESPONSI

Tampak Depan
Skala 1:100

Tampak Belakang
Skala 1:100
DASAR STRUKTUR & KONSTRUKSI BANGUNAN
SEMESTER 1 2013/2014
TUGAS RESPONSI

PAPAN BUBUNGAN 3/25


BALOK BUBUNGAN 8/12
MAKELAR 8/12 +5.40
KAKI KUDA-KUDA 8/12
SKOOR 8/12
BALOK KUNCI 8/12
RINGBALK 15/20 GORDING 8/12
GAPIT 2 X 8/12
BALOK TARIK 8/12
KASO 5/7 +3.35
PAPAN +2.85
LISPLANK 3/25 2.90 +3.00
BOUVENLIGHT 25/25 +2.70

+1.50

SLOOF 15/20 TERAS R.KELUARGA R.TAMU TERAS


PONDASI TERAS -0.02 ±0.00 ±0.00 -0.02 ±0.00
-0.20 -0.20 -0.25
TANAH URUG
PONDASI LAJUR
-1.10
AANSTAMPING
0.70
0.90
2.000 1.000 5.50 1.75 1.75
12.00

Potongan 1
Skala 1:100

BALOK AMPIG 15/15


PAPAN BUBUNG 3/25 +5.40
+5.17
DINDING AMPIG
BALOK BUBUNG 8/12

KUDA-KUDA 8/12
IKATAN ANGIN 2X6/10 +3.35
RINGBALK 15/20 +3.00
+3.00 +3.00
RANGKA PLAFOND 6/10
RANGKA PLAFOND 5/7 +2.10

PAS. DINDING
1/2 BATA

DINDING 1/2 R. TIDUR R. KELUARGA DAPUR RABAT


BATA TRASRAM ±0.00 ±0.00 -0.02 -0.05 ±0.00
-0.20
SLOOF 15/20

PONDASI LAJUR
AANSTAMPING

3.00 2.50 1.50 3.00


10.00

Potongan 2
Skala 1:100

You might also like