You are on page 1of 25

BONTANG FUTURE 3RD LNG/LPG DOCK:

A DESIGN WHICH ACHIEVES VERY HIGH LEVELS OF


FLEXIBILITY, SAFETY AND RELIABILITY

LA FUTURE 3ÈME JETEE DE CHARGEMENT GNL/GPL DE


BONTANG: UNE CONCEPTION QUI ASSURE DES
NIVEAUX TRES ELEVES DE FLEXIBILITE,
SECURITE ET FIABILITE

Yosua Sitepu
Train G and 3rd Dock/LPG Storage Project Manager
Pertamina Projects PKP
Gedung Patra Jasa, 13th Floor
Jl. Gatot Subroto Kav. 32-34 - Jakarta 12950, Indonesia
Bertrand Lanquetin
Gas Shipping Department Technical Manager
Total S.A., Tour Total
24 Cours Michelet
92069 Paris La Défense Cedex, France

ABSTRACT
The Bontang LNG/LPG expansion project includes a 8th liquefaction train, a 6th LNG
tank, a 5th LPG tank and a 3rd LNG/LPG loading dock, making this plant the biggest in
the world with a forecast of 390 to 410 LNG cargoes and 30 to 40 LPG cargoes to be
lifted every year by year 2000.

Given the docking requirements, the design of the new loading dock has been an
extremely challenging task for PERTAMINA and considerable emphasis has been put on
flexibility, safety and reliability aspects :
- flexibility : the new dock has been designed for 65 LNG ships of all types with sizes
ranging from 18,000 m3 to 145,000 m3 and for 128 LPG ships with sizes ranging from
15,000 m3 to 100,000 m3, which is the biggest fleet ever used for a loading dock design.
- safety : particular attention has been paid to all safety matters including : siting and
orientation of the dock, fire fighting, emergency escape routes, prevention, alarms,
emergency shut down and release systems, monitoring and control of loading
operations.

2.R–1
- reliability : equipment overlap and appropriate methods of structures calculations allow
a reduction in the risk of prolonged unavailability in case of damages to the dock.

The present paper discusses the above in detail and various other aspects of the new
dock design.

RESUME
Le projet d'expansion en cours de l'usine GNL/GPL de Bontang inclut un 8ème train
de liquéfaction, un 6ème bac de stockage GNL, un 5ème bac de stockage GPL et une
3ème jetée de chargement GNL/GPL, faisant de cette usine la plus grande du monde avec
390 à 410 cargaisons de GNL et 30 à 40 cargaisons de GPL prévues annuellement à
l'horizon 2000.

Dans ce contexte, la conception de la nouvelle jetée de chargement a constitué un


énorme challenge pour PERTAMINA et une attention toute particulière a été portée sur
les aspects de flexibilité, sécurité et fiabilité :
- flexibilité : la jetée a été conçue pour 65 navires GNL de tous types et de tailles
comprises entre 18 000 m3 et 145 000 m3 et pour 128 navires GPL de tailles comprises
entre 15 000 m3 et 100 000 m3, ce qui constitue la plus importante flotte jamais utilisée
dans la conception d'un tel ouvrage.
- sécurité : l'accent a été mis sur toutes les questions de sécurité, incluant la recherche du
site optimum, l'orientation de la jetée, la lutte incendie, les routes d'évacuation
d'urgence, la prévention, les alarmes, les dispositifs d'arrêt d'urgence des opérations et
de déconnexion du navire, la surveillance et le contrôle des opérations.
- fiabilité : la redondance des équipements ainsi que des calculs de structure adaptés
permettent de réduire le risque d'une indisponibilité prolongée en cas de dommages sur
le jetée.

Le présent papier détaille les sujets ci-dessus et aborde encore divers autres aspects de
la conception de la jetée.

2.R–2
BONTANG FUTURE 3RD LNG/LPG DOCK:
A DESIGN WHICH ACHIEVES VERY HIGH LEVELS OF
FLEXIBILITY, SAFETY AND RELIABILITY

BONTANG EXPANSION PROJECT — 3rd DOCK / 5th LPG TANK

INTRODUCTION
Due to the increasing capacity of the Bontang liquefaction plant operated by PT.
Badak with a 7th liquefaction train operational in year 1997 and a 8th train to be
operational in year 2000, PERTAMINA and its Production Sharing Contractors : TOTAL
Indonesie, VICO and UNOCAL, decided, based on the results of port simulation studies
commissioned by TOTAL Indonesie, to build a 3rd loading dock for LNG and LPG ships
together with one additional LNG Storage Tank and one additional LPG Storage Tank in
order to cope with the increasing traffic of ships.

After the completion of the 8th liquefaction train it is estimated that 21.6 million tons
per year of LNG will be lifted by 390 to 410 LNG cargoes under various sales contracts

2.R–3
mainly to Japan, Korea and Taiwan as well as around 1.35 million tons per year of LPG
lifted by 30 to 40 LPG cargoes.

The dock no. 3 siting study and the preparation of the Statement of Requirements
(SOR) covering as a milestone project the dock no. 3, the additional LPG tank and the
associated process (pipe racks, tie-ins, flares) were completed in 1995.

A fairly detailed and comprehensive Front-End Engineering Design (FEED) was


performed by PT.INCONED Indonesia in 1995 and completed at the beginning of 1996.

Finally, the Detailed Engineering, Procurement and Construction Contract (EPC) was
awarded in January 1997 to a joint operation between IKPT (PT. Inti Karya Persada
Tehnik Engineering and Construction) of Indonesia and CHIYODA CORPORATION of
Japan for a mechanical completion scheduled for January 1999 and an operational
acceptance three months later.

The LNG dock no. 1 was commissioned on 9 August, 1977 and the LNG/LPG dock
no.2 was commissioned on 19 December, 1988, i.e. already twenty-one and ten years ago
and with a much smaller fleet of ships. Consequently the design of dock no. 3 could not
re-use previous studies : it had not only to accommodate the latest state of the art for dock
designs and the latest technologies, but also the biggest fleet of LNG and LPG ships ever
used for a dock design.

1. BASIS OF THE DESIGN


1.1 Process

The LNG/LPG dock no. 3 has two independent LNG transfer lines from the LNG
storage tanks farm. It means that when enough storage inventory is available, up to three
LNG ships can load simultaneously in Bontang (one on each dock). A new LNG marine
flare has been added, which can handle the simultaneous maximum vapor return rates from
both dock no. 2 and dock no. 3. However during normal operation the vapor return from
dock no. 3 will use a new vapor return line connected to the vapor recovery system and
used for both dock no. 2 and dock no. 3.

It was deemed necessary to have LPG loading facilities on two docks for flexibility
and back-up but simultaneous loading of LPG ships on two docks has not been considered
as a probable scenario with regard to LPG current and future production levels.
Consequently the LPG transfer lines of dock no. 3 (one line for C3 and one line for C4)
are tied-in to the existing LPG transfer lines of dock no. 2 as well as the vapor return lines
(one for C3 and one C4), which are tied-in to the existing BOG reliquefaction facilities at
the LPG storage tank farm. The excess vapor is flared on the existing LPG flare.

The LNG loading system for dock no. 3 is designed for loading at a minimum rate of
10,000 m3/hr using three 16" liquid arms and one 20" vapor arm with a minimum battery
limit pressure at ship’s rail of 3.50 kg/cm2 abs (in order to take into account a mesh 60
loading strainer). However, ships can be loaded at 12,500 m3/hr using the four liquid arms
in place (fast loading scenario).

2.R–4
The LPG loading system for dock no. 3 is designed for loading at a minimum rate of
5,000 m3/hr (single product C3 or C4) using the two 12" liquid arms and the two 8" vapor
arms with a minimum battery limit pressure at ship’s rail of 2.10 kg/cm2 abs. However,
most of the ships will load simultaneously C3 and C4 at 2,500 m3/hr each. Small ships
with smaller freeboard and smaller size of manifold can also load a single product (or two
products sequentially) using the two 8" LPG arms, which are slightly longer than the 12"
arms to achieve a greater outreach.

1.2 Ships Used for The Dock No. 3 Design

Usually LNG ships calling at Bontang are dedicated to specific LNG sales contracts
and LNG trades while LPG ships are nominated. For dock no. 3 being an extension of
existing facilities, it was not possible to be satisfied with a design using a limited number
of “generic” ships as is often done for grassroot projects. Accordingly, an exhaustive list
of ship type and size has been established for dock no. 3 design and 65 LNG ships have
been selected, with sizes ranging from 18,000 m3 (SURYA AKI for Medium City Gas
Companies in Japan) to the future 145,000 m3 ships still on the design boards. These 65
ships represent more than half of the worldwide LNG fleet, existing or under construction.

These ships have been selected according to following principles:


- ships calling at Bontang.
- ships usually calling at Blang Lacang ( Indonesia’s second LNG/LPG Plant in Sumatra
Island), because they also come from time to time to Bontang.
- ships in lay-up condition worldwide because past experience has shown that short term
charters of this category of ships was not to be excluded.
- new ships under construction, deemed to be representative of the LNG carriers of the
latest generation, even if they were not built for Indonesian trades.
- future 145,000 m3 LNG ships: there is a very high probability that these ships will be
built in the near future, therefore these ships had to be incorporated in the design. Ships
bigger than 145,000 m3 would require special consideration with regard to the coralline
hard bottom in Bontang, the dredged depth limited to 14 m and the operational limits in
use.

This selection also allowed, as a matrix approach, to cover all categories of ships:
membrane, prismatic or spheres with 3,4,5 or 6 tanks, resulting in almost all possible flat
bodies, decks arrangements, manifolds configurations, etc.
128 existing LPG ships (refrigerated) have been selected, ranging from 15,000 m3 to
100,000 m3 , representing all the LPG fleet worldwide within these size limits.

In addition to data already held by PERTAMINA, inquiries have been sent to about
55 companies worldwide for ships data collection in order to have enough information to
perform the design. PERTAMINA would like to take this opportunity to thank warmly all
ships’ Owners/Managers, who contributed generously to the dock no. 3 design in
providing data on ships. Their contribution to all of the efforts made to design a safe port
has been invaluable and is a good example of how the LNG/LPG family stands close
together in sharing the goal of safety.

2.R–5
1.3 Others

The dock no. 3 design allows round-the-clock operations.

For safety reasons it has been decided that the dock no. 3 control room will not be on
the dock (unlike docks no. 1 and 2) and that the gangway platform will be separated from
the loading platform in order to provide a remote emergency escape. This is further
developed in Chapters 6 and 7.

The International Safety Guide for Oil Tankers & Terminals better known as ISGOTT
(ICS, OCIMF, IAPH) and the Safety Guide for Terminals Handling Ships Carrying
Liquefied Gases in Bulk (OCIMF) have been used extensively for the design as well as all
relevant SIGTTO publications. On the particular subject of regulations, the interested
reader could refer to the information paper no. 14 “Site Selection and Design for LNG
Ports and Jetties” and to the information paper no. 15 “A Listing of Design Standards for
Liquefied Gas Terminals (referencing Ports and Jetties)”, both produced by SIGTTO.
They contain a fairly good background for dock siting and design aspects. (The
explanation of various acronyms for the societies and international bodies mentioned is
given at the end of the paper).

A Hazard and Operability Study (HAZOP) was conducted in May of 1997 and its
results incorporated in the design of dock no. 3.

2. DOCK NO. 3 SITING AND ORIENTATION


2.1 Siting Study

A siting study was performed in order to select the best possible location of dock no. 3
using a weighted multi-criteria analysis technique. Ten possible locations have been
considered with evaluation criteria covering overall nautical, operational, safety,
structural/construction and cost viewpoints.

In particular, safe distances and hazard zones have been evaluated using various
LNG/LPG spills scenarios and vapor cloud computations with the “DEGADIS” model
developed by the US Coast Guards.

The recommended location for dock no. 3 was further subject to confirmation by a
nautical risk assessment study using a real time navigation simulation model.

2.2 Nautical Risk Assessment Study

This study was commissioned to DELFT HYDRAULICS using the Maritime


Simulation Center in the Netherlands (MSCN) simulator located at Wagenignen. Bontang
pilots attended and performed the simulations using their Bontang port knowledge, thus
bringing more credibility to the design of this new installation.

The aim of this study was to confirm the location of the dock no. 3 from a nautical
point of view and to optimize the dock orientation through berthing/unberthing simulation

2.R–6
maneuvers in routine and emergency conditions for different weather patterns and with the
assistance or not of tugs. An example of berthing maneuver is given on Figure 1.

Of the two lay outs 110o and 115o, derived from previous screening studies (also by
DELFT HYDRAULICS but using the fast-time ship simulator SHIPMA-5), the 115o
orientation has been selected and a mooring configuration of the ships “bow out” has been
recommended for safe departure.

Accordingly dredging plans to the 14 m isobath have been established and results of
the soil survey shown that enough good coral sand was available for reclaiming the
necessary space for the additional LPG tank.

FIGURE 1: EXAMPLE OF BERTHING MANEUVER

2.R–7
3. DOCK NO. 3 LAY OUT OPTIMIZATION AND DESIGN OF
BREASTING DOLPHINS AND MOORING DOLPHINS
Although ships will generally moor bow out on dock no. 3, i.e. on the starboard side,
the port side mooring has been systematically studied as well, not only for the optimization
of the lay out of the dolphins, but also for other design areas, like the arms flanging areas,
with the understanding that in case of conflict between port side and starboard side
moorings, starboard side mooring will prevail and ships with restrictions for port side
mooring will be clearly identified.

3.1 Breasting Dolphins Lay Out

The optimum location of the breasting dolphins has been determined by graphical
analysis as shown on Figure 2, taking into account the flat part of the hull of the vessels,
the hull curvature and flare angles and the OCIMF criteria with regard to the spacing of
breasting dolphins to be between 25 % and 40 % of ship’s Length Overall (LOA). Ships
with possible restrictions were systematically studied in further details, assessing low
tide/high tide conditions, loaded/ ballasted conditions and longitudinal drifts due to
weather. An example of such study is given on Figure 3.

As a conclusion :
- the lay out of the main breasting dolphins and their number (four) has been optimized. It
has to be further noted that the top of the inner breasting dolphins has been set at + 5.00
m while the top of the outer breasting dolphins has been set at + 6.50 m, while keeping
the vertical angles of mooring lines within recommended OCIMF values, i.e. less than
25o - 30o (25o for spring lines) with no negative values. This arrangement significantly
reduces the number of ships having a partial contact with the fender panels.
- for smaller ships it has been necessary to provide, in addition to the four main breasting
dolphins, a “sub-breasting” dolphin in the form of a berthing beam located in front of but
not connected to the loading platform. Accordingly, the kinetic energy absorption of this
beam is based exclusively on piles deflection and special high tensile steel grade has been
used for that purpose.

2.R–8
FIGURE 2: EXAMPLE OF GRAPHICAL ANALYSIS FOR
BREASTING DOLPHINS LOCATION

2.R–9
FIGURE 3: DETAILED STUDY ON THE RELATION
FLAT BODY / FENDER PANELS

3.2 Mooring Dolphins Lay Out

The optimum location of the mooring dolphins has been obtained by the use of the
graphical analysis method as shown on Figure 4 : the mooring lines and their orientations
are plotted against the dock lay out in order to define the most suitable and best mooring
configuration of each vessel.

The basic principles used for the design are based on the good mooring practice
recommended by OCIMF, i.e., head and stern lines are omitted as much as possible
because they are not very effective in restraining vessels due to their long length and poor
orientation. In other words, ships are moored “within their own lengths”. Furthermore it
has been verified that the horizontal angles of the breast lines do not exceed in general
+/- 15o.

Finally mooring calculations were done for each ship, using a software incorporating
mooring line elasticity in order to determine the maximum tensions in the lines (to remain
under 55 % of the Minimum Breaking Limit - MBL) and the ships displacements.

2.R–10
FIGURE 4: EXAMPLE OF GRAPHICAL ANALYSIS
FOR MOORING DOLPHINS LOCATION

As a conclusion:
- the lay out of main mooring dolphins and their number (six) has been optimized
according to good mooring practice and results in a dock length of 367.5 m (distance
between outer mooring dolphins).
- for a limited number of smaller and/or atypical ships, a seventh dolphin has been added
(MD4) with a “two hooks assembly” in order to achieve a satisfactory spring lines
arrangement in most cases. An example of use of this dolphin is given on Figure 5.
Catwalks connecting to this dolphin are elevated to avoid mooring boats becoming
trapped between the ship and this dolphin.
- finally and for some ships using a mixed wire/synthetic mooring pattern or showing
possible overstress in their breast lines, a shore augmentation consisting of a pulley has
been added on three mooring dolphins. The use of this additional facility will be left to
the masters discretion.

FIGURE 5: EXAMPLE OF USE OF DOLPHIN MD4

2.R–11
3.3 Design of the Dolphins

- Breasting Dolphins: although the acceptable hull pressure of LNG carriers should be in
the range of 15 t/m2 for ship berthing at angles different from 0o, a value of 11.6 t/m2
has been chosen for dock no. 3 as the most conservative value resulting from ship data
collection. The berthing speed chosen for the breasting dolphin design is 1 knot at an
approaching angle of 10o, which gives a normal component (berthing at 0o) of 18.2
cm/s, while 15 cm/s is recommended by PIANC for an area such as Bontang. Breasting
dolphins are of rigid structure type supporting low recoiling buckling rubber fenders.

The breasting dolphins are calculated in accordance with the “weak line defence
mechanism”, i.e. in a catastrophic scenario, the dolphins shall be capable of being re-
used in case of an overload resulting in plastic deformation of the subsoil without
damaging the ship’s hull (deformation of the subsoil has been preferred to plastic
deformation of the piles because a more or less inclined fender is preferred compared to
a system where some piles cannot be relied upon any more). See reference [1]

Further, safety factors are introduced namely :

- The design absorption capacity of the fender units at 50 % fender compression and 0o
berthing angle is two times the berthing energy at controlled berthing speed of 18.2
cm/s. As a result the berthing energy is absorbed at approximately 30 % fender
deflection based on the fender characteristic curve.

This builds into the system a reserve energy allowing a berthing speed at 0o of
18.2 2 =25.7cm/s
preventing the risk of the rubber fender becoming rigid due to full compression.
It has to be noted that the reaction force remains approximately the same between 30 %
and 50 % compression for this type of fender and is in the range of 285 t.

- Since the reaction force on the dolphin increases very sharply when the fender is fully
compressed, the piles are designed with a load factor of 2, i.e. for an ultimate reaction
force of 570 t, which is two times the reaction force corresponding to the design
absorption capacity of the fender. Consequently, if the berthing speed at 0o is above 25.7
cm/s, the ultimate soil bearing will be met at some point of energy absorption and the
concrete cap will travel due to subsoil deformation while the dolphin structure will
remain undamaged.

Taking into account that the concrete cap of the dolphin can travel up to 1.70 m
(remaining horizontal distance between the compressed fender and the edge of the
loading platform), an emergency reserve of 485 t.m (= ½ ultimate reaction force x
displacement) is built into the system which, when added to the design absorption
capacity of 215 t.m of the fender, gives a total energy absorption of the dolphin of
700 t.m leading to a berthing velocity of
18.2 700 ÷ 107.5 =46 cm/s
i.e., 2.5 times the design berthing velocity. In this catastrophic scenario, the ship’s hull
will not be damaged and the damaged dolphin could still be used with some precautions.

2.R–12
- Mooring Dolphins: the mooring dolphins are both analysed for the sum of the MBL of
each line to be hooked to the dolphin perpendicular to the dolphin, including the
extreme vertical angle and for the maximum horizontal angle due to the most extreme
mooring line position, including the extreme vertical angle. This is in order to assess the
maximum compression and extension forces on the piles. Extreme line positions are
given by the graphical method showing the apex of the most extreme orientation of any
mooring line.

Because the strongest lines are used for the design (44 mm diameter with 127 t MBL),
no further safety coefficient is taken.

4. LOADING PLATFORM AND TRESTLE


The loading platform is 36.25 m in length and has three levels : main deck, 2nd deck
and 3rd deck. The main deck has a maneuvering platform and is connected to the shore by
the main trestle -300 m in length, supporting a road 5 m width allowing the passage of a
wheel crane for loading arms maintenance (barges are not readily available in Bontang).
This road is also used for emergency access from the dock control room. The loading
arms are mounted on the 3rd deck while the 2nd deck supports various valves and
manifolds arrangements. The figure 6 shows the front view and various sections of the
dock. After study of various solutions, the pipeway has been separated from the main road
trestle. In addition, a completely separated catwalk connects the gangway platform to the
shore.

2.R–13
FIGURE 6: FRONT VIEW OF THE DOCK AND VARIOUS SECTIONS

5. LOADING ARMS
5.1 Description

For LNG loading, four 16" liquid loading arms are provided (one being able to be used
as vapor arm) in order to allow a loading rate up to 12,500 m3/hr. After a thorough vapor
return calculation study, it was decided that the vapor arm will be 20" terminated by a 16"
triple swivel assembly for better interchangeability of components with dock no. 2 and
weight reduction consideration. A 20" x 16" vapor arm equipped with a 12" reduced bore
Powered Emergency Release Coupling (PERC) has also a lower pressure drop than a 16"
vapor arm with full bore PERC.

These five arms are equipped with an Emergency Release System (ERS) consisting of
12" reduced bore PERC using for the first time the “no spill” technology, which reduces
the leakage of LNG to about 2 liters at the time of PERC opening compared to 10 liters
for a conventional reduced bore type PERC and 16 liters for a full bore type PERC. This
will significantly enhance the safety of the personnel in the vicinity of the manifold. The
principle illustrated on Figure 7 is that one of the ball valves has a concave shape which
allows for the reduction of the space between the two ball valves when closed (due to
mechanical interlock, the upper valve closes first when ESD is initiated, and the lower
valves closes after when the ERS is initiated).

2.R–14
FIGURE 7: PERC WITH “NO SPILL” TECHNOLOGY

For LPG loading, two 12" arms are used for liquid and two 8" arms are used for
excess vapor. Both propane and butane can be loaded separately or simultaneously. One
of the 8" arms is able to be used as a liquid arm so that smaller ships can be loaded using
the two 8" arms only. For this reason the 8" arms are also slightly longer than the 12"
arms. After hydraulic calculation, the decision was taken to use full bore PERC for the
LPG arms, for which the “no spill” technology was unfortunately not available at the time
arms were ordered.

Dock no. 3 is also the first gas installation with the whole triple swivel assemblies for
LNG and LPG arms being fire resistant (OCIMF requests this for PERC and QCDC only).

All arms’ normal connecting and disconnecting operations, are controlled by a portable
radio device (1.285 kg, battery life time 3 years), which is much easier to handle compared
to the traditional pendant with umbilical cable and also allows more functions.

Accumulators, Arms Position Monitoring System (PMS) and Uninterruptible Power


Supply (UPS) are designed in such a way that all arms will automatically retract clear from
a drifting ship after PERC opening even in case of electricity black-out. This facility will
also allow a better protection of the loading arms in case of a fire on the ship’s manifold.

Finally, it was decided that a Hydraulic Quick Connect/Disconnect Coupling (QCDC)


will not be installed due to flanging problems yet to be solved due to the great variety of
ships calling at Bontang. However, arms and supporting structures are designed in such a
way that this equipment can be easily retrofitted in the future.

5.2 Arms Envelopes and Alarms

The arms design and their mechanical limit envelopes have followed OCIMF loading
arms specification Edition 1987 (the new Edition being not available at the time of dock
no.3 design) except that the drifting area has been taken as a rectangular shape rather than
a circular shape for conservative purposes.

However, it was decided not to follow the drifting speeds of 15 cm/s and 5 cm/s often
used for setting up, respectively, the alarm 2nd step (ERS) and alarm 1st step (ESD). A
study was provided by DELFT HYDRAULICS using the MSCN real time navigation
2.R–15
simulation programme in order to obtain an accurate estimation of longitudinal and lateral
components of the drifting speeds and drifting distances in the first seconds after a ship
break out. Also, and in order to build more safety into the system in case of high drifting
speeds, it was decided that the closure time of the PERC valve will be 5 sec. (surge
analysis calculation and surge protection are based on this figure) and that the closing
time of the ESD valve (arm MOV = Motorized Operated Valve) will be reduced to 20
sec., this figure still being compatible with the design of the loading lines compared to the
more traditional value of 30 sec. It was finally decided that the alarm 1st step, if triggered
by the PMS, will be in spherical coordinates rather than more commonly used rectangular
coordinates, because the spherical coordinates are also used for alarm detection by
proximity switches and both systems back-up each other in our design philosophy.

The lateral drifting distances and speeds used are given on Figure 8 for lateral wind
and current pushing the ship off the berth.

With these values, the distance from mechanical limit of the arm to the alarm 2nd step is:
(20 cm/s + 2 cm/s).5s = 110 cm rounded up to 1,200 mm ;
and the distance alarm 2nd step to alarm 1st step is:
170 cm + margin for PMS accuracy = 2,000 mm ;
where : 20 cm/s = drifting speed after 25s
170 cm = drifting distance after 20s.
2 cm/s = PMS accuracy.

A similar calculation is done for longitudinal drift for which the dimensioning case is a
quarterly wind and current (and not a longitudinal wind and current which generates
smaller effort on the ship).

It has to be noted that the scenario of the ship break-out due to starting of the engine
full ahead harbor has not been kept as the worst scenario particularly for the lateral
drifting speeds and distances.

Based on the hereabove, the loading arms envelopes are given on Figure 9 for LNG
arms.

2.R–16
30
DRIFTING SPEED (cm/sec.)

25

20

15

10

0
0 5 10 15 20 25 30 35
TIME FROM BREAK-OUT (sec.)

500
DRIFTING DISTANCE (cm)

450
400
350
300
250
200
150
100
50
0
0 5 10 15 20 25 30 35
TIME FROM BREAK-OUT (sec.)

FIGURE 8: LATERAL DRIFTING FIGURE 9: LOADING ARMS


SPEEDS AND DISTANCES ENVELOPES (LNG)

6. ACCESSES, EMERGENCY ESCAPE ROUTES, GANGWAY


6.1 General Philosophy

Present arrangement of dock no. 3 trestle is given on Figure 10 and was found to be
the best possible having regard to :
- an “unmanned” dock concept, i.e., the loading operations do not require any operator to
be present on dock 3 from the moment the gas is introduced into the arms for arms
cooldown prior to loading startup until the purging of the arms after the loading is
completed. Obviously this does not exclude patrols by safety/operations/marine staff on
the dock, but no permanent attendance is needed.

2.R–17
- segregation of authorized safety/operations/marine people involved with operations
from “unauthorized” people on the loading platform not directly involved with
operations (like immigration, customs, shipping agent, crew change, visits on board,
etc...).
The authorized people have a dedicated access from the dock 3 control building to the
loading platform using the road trestle, while “unauthorized” people must use the
separate catwalk trestle giving direct access to the gangway tower and pass a security
check at catwalk entrance.

- emergency escapes : the gangway tower is voluntarily separated from the loading
platform and is located on a dedicated dolphin at a distance of 31.6 m from the closest
loading arm. Accordingly the gangway bulwark ladder on board the ship is at some
distance from the manifold, where a fire is most likely to occur, and closer to the ship
accommodation space. The catwalk connecting the gangway to the shore is therefore
used as an emergency escape between ship and shore while the road trestle is used as an
emergency escape between the loading platform and the shore. Secondary escapes are
also provided for personnel trapped on dolphins to reach a safe area without passing
over the loading platform. Two ladders are also provided on each dolphin for access to
the water. Finally a connection is provided at the middle of the trestle between the
catwalk and the main road trestle. This arrangement is in line with OCIMF
recommendations which require that two remotely separate evacuation routes from all
work or occupied areas are provided for emergency egress.

FIGURE 10: ACCESSES, EMERGENCY ESCAPE ROUTES AND GANGWAY

2.R–18
6.2 Gangway

Due to the great diversity of ships sizes and deck obstructions the choice of the
gangway design is a tower type gangway with four intermediate platforms, provided with
stairways and equipped with a steel turntable going up and down by means of a cable lift.
The turntable platform supports an aluminum telescopic gangway ladder equipped at the
end of the telescopic part with a bulwark ladder for easy access to the ship’s deck.

The gangway is of the gravity type, i.e., it lands directly on ships decks and follow the
ships’ movements by gravity (free-wheel mode).

In case of emergency the gangway is equipped with an emergency raise and retract system
in order to be clear of a drifting ship.

The finalization of the gangway envelopes has required a considerable effort for the
identification of ships deck obstructions which are particularly numerous when going away
from the manifold platform, like : LN2 tank, dry chemical units, ship’s accommodation
and pilot ladders, cargo machinery room , etc. An example of such study is given on
Figure 11.

The number of intermediate platforms has been fixed to four to restrict the maximum
vertical angle to 22o or less for safety reasons. The gangway is equipped with a safety net
and generally follows SIGTTO Guidelines for Ship to Shore Access for Gas Carriers.

FIGURE 11: GANGWAY LANDING AREA STUDY

2.R–19
7. SHIP TO SHORE COMMUNICATION AND DOCK NO. 3
MONITORING AND CONTROL OPERATIONS FROM THE
CONTROL BUILDING
7.1 Ship to Shore Communication

For LNG ships the following means of communications are provided :


- one communication cable with connector for the hot line, interphone and public
telephone (similar to docks no. 1 and 2).
- one pneumatic ESD link with connector for the ESD signals from shore or ship (similar
to docks no. 1 and 2).
- one telemetry link for the integrated Marine Monitoring System (MMS) in order to
display the MMS information (wind and current on dock no. 3, approaching/departing
speeds and distances of the ship and mooring lines tensions) on a portable computer
placed on board the ship cargo control room at the time of the pre-loading meeting.

For those LNG ships equipped with an optical fiber link (mainly ships trading with
Japan), an optical fiber cable with connector is also provided for convenience with the
following functions:
- communications (3 lines).
- ESD link (signal from shore and signal from ship).
- MMS information interfaced with ship computer facilities.
- two spare cores are available for possible future use.

For LPG ships, which are not as well equipped as LNG ships, the following is
provided:
- one communication cable with telephone handset to be put on board, used as a hot line.
- one electric ESD link with a pendant to be put on board the ship (“SIGTTO ESD link”).
- one telemetry link for the MMS information to be displayed on a portable computer put
on board the ship upon arrival.

All radio transmissions generally follow the SIGTTO guidelines for “Ignition Hazards
due to Marine Radios and Radio Transmission.”

7.2 Dock no. 3 Monitoring and Control

The dock no. 3 monitoring and control of operations are done from a remote blast
proof control building located onshore at approximately 330 m from the loading platform.
The dock design is based on the “unmanned concept”, which means that a lot of emphasis
has been put on monitoring and control of operations.

The overall control of the installation is through a Distributed Control System (DCS).

2.R–20
Additional monitoring and control devices are as follows :
- for the loading arms: a Position Monitoring System (PMS) is provided. The PMS will
not only display the position of the arm flange closest to the alarm 1st step but will also
trigger the pre-alarm, the alarm 1st step (ESD) and the alarm 2nd step (ERS) in parallel
to proximity switches for alarms detection. The PMS is equipped with a failure auto
check mode.

- for marine operations : the integrated Marine Monitoring System (MMS) will provide
long term weather data collection in the vicinity of dock no. 3 (i.e. wind and current,
Bontang port not being subject to waves). It will monitor, when a ship is approaching or
departing, the distances and speeds fore and aft together with wind and current
conditions (with a handy display for the pilot) and, when the ship is alongside, the
tensions in the mooring lines and ship drift off together with wind and current conditions.
This later information will be also displayed by telemetry on a portable computer placed
on board the ship during the pre-loading meeting with alarms provided on the handy
display as well. Trouble shooting assistance is provided by the vendor of the MMS
through a dedicated (or part-time dedicated) telephone line to be made available at the
Bontang plant. The schematic drawing of the MMS is given on Figure 12.

FIGURE 12: MMS CONFIGURATION

2.R–21
- CCTV system : three remote controlled cameras with pictures displayed on three large
color monitors are provided : one on each side of the loading arms to permanently
watch the ship manifold, and one on an elevated tower to permanently watch the
gangway. Five other remote controlled cameras (dock entrance, main deck, 2nd deck (x
2) and 3rd deck) are provided with scanned pictures displayed on two other color
monitors (i.e. a total of 5 monitors is provided in the control room).

- a complete Hazard and Monitoring Systems (HMS) is also provided in the dock no. 3
control room.

Finally, quick disconnection of the ship is possible using the loading arms Emergency
Release System (ERS) through PERC activation by push button or excessive ship drift, by
the Quick Release Hooks (QRH) system for the disconnection of the mooring lines and by
the emergency raise/retract system of the gangway.

7.3 Dock no. 3 Control Building

As explained before it has been judged that a control building located at some distance
from the loading platform was considered safer for personnel and control equipment than
a control room located on the loading platform or in its immediate vicinity.

Easy access to the loading platform is possible by vehicles or bicycles parked on the
emergency park lot or by feet for authorized personnel.

The control room is at 330 m from the loading platform, however safety studies have
shown that it can be engulfed in an LPG gas cloud in the most serious spillage scenario on
dock no 3. Although this scenario is very unlikely, it was decided, after a detailed review
of various regulations for buildings design in such case, that the recommendation
“Process Plant Hazard and Control Building Design” from Chemical Industries
Association would apply for the dock no. 3 control building, i.e., the building will
withstand a static blast pressure of 3 psi and an incident dynamic blast pressure of 2.9/14.5
psi for respectively 100/30 milliseconds duration times.

Apart from the control room, the stand by mooring team room and the safety room
(equipped with fire protection suits, respiratory masks, etc...), the dock no. 3 control
building has also an instrument room, an electrical room, an air condition room and other
common rooms. A transformers yard is provided near this building. The control building
lay out is given on Figure 13.

2.R–22
FIGURE 13: CONTROL BUILDING LAY OUT

8. FIRE PROTECTION
A detailed review of regulations and guidelines has been done at the beginning of the
project including international conventions, advice from kindred societies: OCIMF,
SIGTTO, ICS, IAPH, national regulatory bodies, with the conclusion that there appears to
be no international regulations but rather broad, general and often inconsistent guidelines
on fire protection for jetties. Risk analysis studies did not seem to be available as well.

For the dock no. 3 it was therefore decided to cover as many fire scenarios as was
possible. The following design is still under finalization at the time of preparation of this
paper, in particular in relation with the protection of the top of the loading arms :
- one fixed water curtain is provided on the sea-side front on 3rd deck for loading arms
protection.

- under deck fixed water curtains are provided on the sea-side front for curbed areas on
main deck platform and 2nd deck.

2.R–23
- two tower elevated oscillating fire water monitors remotely controlled from a fire station
located at a 60 m distance on the trestle are provided for the cooldown of the surfaces
of the main deck platform and 3rd deck (one of these monitors can reach the gangway
tower and the pipeway close to the loading platform as well).

- the gangway tower and telescopic part are protected by water curtains from heat
radiations. The part of the catwalk close to the gangway tower is protected by a water
spray.

- two pre-aimed tower elevated dry chemical monitors are provided on the 3rd deck in
order to help extinguish a possible fire on a ship manifold or on loading arms.

- curbed deck areas on main deck and 2nd deck are also protected by fixed dry chemical
fire fighting system with hose reels and flooding system.

- hydrants with hoses together with portable and wheeled fire extinguishers are provided
at different places.

- an international fire connection with hose reel is provided on the 3rd deck.

- besides the CCTV already described, the dock no. 3 is provided with automatic flame,
smoke, gas, and spill detection with alarms system. Controls for fire fighting are made
not only from the dock no. 3 control room, but also from the plant main control room in
order to have two fire control safe remote places.

9. MISCELLANEOUS
The following other items are provided:
- cathodic protection by impressed current.
- ship grounding cable.
- lighting.
- protection against lightning for both external (direct strike) and internal (induced
voltage) phenomena.
- telephone, paging, speaker system and public address.
- navigational aids following IALA recommendations.

Finally the millennium problem has been carefully assessed with the vendors of all
computer based systems that are provided for the dock no. 3 in order to insure a trouble
free passage to year 2000.

2.R–24
10. CONCLUSION
Past operating experience with loading docks no. 1 and no. 2 has been used widely for
the design of the new dock no. 3 in Bontang.

Besides, a lot of effort has been deployed in order to emphasize the flexibility, safety
and reliability aspects of this new facility. In this regard, the design of dock no. 3 goes
into many aspects which are beyond more conventional and perhaps less costly designs. It
highlights PERTAMINA’s desire to consistently promote safe and efficient operations in
the Bontang port to maintain its reputation as a reliable LNG and LPG supplier.

GLOSSARY OF TERMS USED (in the order they appear in the paper)
ICS = International Chamber of Shipping
OCIMF = Oil Companies International Marine Forum
IAPH = International Association of Ports and Harbors
SIGTTO = Society of International Gas Tanker and Terminal Operators
PIANC = Permanent International Association of Navigation Congresses
IALA = International Association of Lighthouse Authorities

REFERENCE CITED
[1] “Second Loading Dock for LEG Purposes in Bontang, East Kalimantan, Indonesia” -
International Harbor Congress Antwerp, June 1988, R.F. Janssen.

2.R–25

You might also like