Inspection request form Daily work on target as decided
log book make folder in SQM (for new part ) Training follow up wih QI Pending Training Varification test plan and supplier TC Upload in SAP once production released Improvement Points
M Tool Control plan released daily 15x
CAPA against NCR with Evidence VDA 6.3 Audit training Follow up with vendor Learning session process manufacturing commodity wise Preassesment Audit EPIC FMEA Supplier performance before 5th (month ) MSA Cockpit and Action plan before 10th FY rejection data Planned and actual dateof action plan to be filled in excel
Line issue (breaker & Panel)
Board open points (closed before 3 days ) CAPA for closing must If required check point & control plan to be modified in QI Same to be add in SQM point daily Closed QI deviations by checking fucntional requirement Target Remarks 1 Make control plan and released the same from SAP figure to be decide 2 EPIC suppplier owner _rejection percenatage to be improved from FY19 figure to be decide 3 Daily boards open point to be closed within in week contionous 4 Non EPIC NCR Clousre with proper CAPA contionous 5 2x audit with trainer (VDA and preassesment ) figure to be decide 6 Development with final released doument figure to be decide 7 UA/UC