Checklist for maintenance Date :

Shift A B C Remarks
1 HT substation metering - Power factor

2 Water filling in LAB over head tank

3 Water filling in Washroom over head tank

4 Water filling in cooling tower basin

5 Water filling in chilled water tank

6 Water filling in Raw water tank

7 Water filling in fire water tank

8 Chilled water pump working condition

9 Cooling water pump working condition

10 Process water pump working condition

11 ETP blower working condition

12 ETP feed pump working condition

13 ETP Slurry pump working condition

14 Grease pump for flaker - Only in A shift

15 Cleaning of powder on turmeric screwfeeder

16 Weighing scale calibration ɑ ¨ b¨ c ¨

17 Boiler sample to lab

18 ETP sample to lab

Signature - maintenance

Signature - In charge