TIME STEAM PRESSURE WATER TREATMENT RECOMMENDATIONS 8.00am SHIFT SOFTNER REGENERATION DETAILS 9.00am DATE SALT QTY INLET WATER PPM OUTLET WATER PPM SIGN 10.00am A 11.00am B 12.00pm C 13.00pm BOILER TREATMENT 14.00pm DATE CHEMICAL ADDED QTY OPERATOR SIGN 15.00pm A 16.00pm B 17.00pm C 18.00pm BOILER CLEANING 19.00pm TUBE BACKDOOR FORNT CHAMBER BACK CHAMBER SIGN 20.00pm A 21.00pm B 22.00pm C 23.00pm BOILER BLOWDOWN 0.00am GAUGE & CONTROLLER TIME PPM SEC SIGN 1.00am A 02.00am B 03.00am C 04.00am BRIQUETTES USED 05.00am OPERATOR NO OF BAGS REASON APPROVED BY SIGN 06.00am A 07.00am B C SHIFT SHIFT CHANGE INFORMATION SIGN REMARKS: A