• Determine Seismic Use Group (IV, III, II, I) for the facility.
• Determine soil class (A, B, C, D, E, F). Use these and IBC Table(s) 16151.2 to select
Seismic Force Adjustment Factors , Fs & Fv.
• Obtain Maximum Considered Earthquake seismic accelerations, % g for Short (0.2 sec)
and long (1 sec) accelerations, SS & S1, using “Shake Maps”.
• Using Site Coefficients, Fs & Fv, calculate the Adjusted (or Modified) Maximum
Considered Earthquake, which equals:
• Using these values, for SDS and SD1, refer to IBC 2003 Tables 1616.3(1) and 1616.3(2),
and select a Seismic Design Category (A, B, C, D, or E and F) for each value, SDS and
SD1, and the previously determined Seismic Use Group. The WORST CASE Seismic
Design Category is to be used for the remainder of the design.
4
US Army Corps
of Engineers
Engineering and Support
Seismic Use Groups
Center, Huntsville
• Group III structures are those having essential facilities that are
required for post-earthquake recovery and those containing
substantial quantities of hazardous substances.
5
US Army Corps
of Engineers
Engineering and Support
Seismic Use Groups
Center, Huntsville
6
US Army Corps
of Engineers
Site Class
Engineering and Support
Center, Huntsville
IBC 2003
7
Seismic Map - 0.2 Second Spectral Response
Seismic Map - 0.2 Second Spectral Response
Seismic Map – 1.0 Second Spectral Response
Seismic Map – 1.0 Second Spectral Response
US Army Corps
Site Coefficients
of Engineers
Engineering and Support
Center, Huntsville
IBC 2003
13
US Army Corps
Adjusted Maximum
Considered Earthquake
of Engineers
Engineering and Support
Center, Huntsville
SMS =FaSs
SM1 =FvS1
where:
Fa = Site coefficient defined in Table 1615.1.2(1).
Fv = Site coefficient defined in Table 1615.1.2(2).
SS = The mapped spectral accelerations for short periods
as determined in Section 1615.1.
S1 = The mapped spectral accelerations for a one second period
as determined in Section 1615.1.
IBC 2003
14
US Army Corps Design Earthquake
of Engineers
Engineering and Support
Center, Huntsville
IBC 2003
15
US Army Corps
Seismic Design Category (1)
of Engineers
Engineering and Support
Center, Huntsville
IBC 2003
16
US Army Corps
Seismic Design Category (2)
of Engineers
Engineering and Support
Center, Huntsville
IBC 2003
17
Amplification & Response
US Army Corps
of Engineers
Engineering and Support
Modification Factors
Center, Huntsville
ASCE 7
18
US Army Corps Seismic Force
of Engineers
Engineering and Support
Center, Huntsville
ASCE 7
19
US Army Corps Seismic Force
of Engineers
Engineering and Support
Center, Huntsville
Where:
ASCE 7
20
Effect of Amplification &
US Army Corps
of Engineers
Engineering and Support
Response Factors
Center, Huntsville
21
Amplification & Response
US Army Corps
of Engineers
Engineering and Support
Modification Factors
Center, Huntsville
ASCE 7
22
US Army Corps
of Engineers
What’s Required?
Engineering and Support
Center, Huntsville
ASCE 7
23
Seismic Protection
US Army Corps
of Engineers
Engineering and Support
Exemptions
Center, Huntsville
Exemptions are:
24
US Army Corps
Exemptions, cont’d
of Engineers
Engineering and Support
Center, Huntsville
25
US Army Corps Supports & Restraints
of Engineers
Engineering and Support
Center, Huntsville
26
US Army Corps Piping
of Engineers
Engineering and Support
Center, Huntsville
27
US Army Corps Pipe Supports
of Engineers
Engineering and Support
Center, Huntsville
28
US Army Corps Pipe Supports, cont’d
of Engineers
Engineering and Support
Center, Huntsville
29
US Army Corps Ductwork
of Engineers
Engineering and Support
Center, Huntsville
• Seismic restraints are not required for HVAC ducts with Ip of 1.0 if
either of the following conditions are met:
– HVAC ducts are suspended from hangers 12” or less in length from
the top of the duct to the supporting structure. The hangers shall
be detailed to avoid significant bending of the hangers and their
attachments,
or
30
– HVAC ducts have a cross-sectional area of less than 6 square feet.
US Army Corps Ductwork
of Engineers
Engineering and Support
Center, Huntsville
• Equipment items installed in-line with the duct system (e.g., fans, heat
exchangers, and humidifiers) weighing more than 75 lb (344 N) shall be
supported and laterally braced independent of the duct system and
shall meet the force requirements ASCE 7.
31
US Army Corps Boilers
of Engineers
Engineering and Support
Center, Huntsville
32
US Army Corps Boilers
of Engineers
Engineering and Support
Center, Huntsville
33
US Army Corps Other Equipment
of Engineers
Engineering and Support
Center, Huntsville
34
Other Code
US Army Corps
of Engineers
Engineering and Support
Requirements
Center, Huntsville
35
US Army Corps
Design Resources Available
of Engineers
Engineering and Support
Center, Huntsville
36
US Army Corps ASHRAE Handbook
of Engineers
Engineering and Support
Center, Huntsville
• Example calculations
37
MSS Seismic Restraint
US Army Corps
of Engineers
Engineering and Support
Manual
Center, Huntsville
38
SMACNA Seismic
US Army Corps
of Engineers
Engineering and Support
Restraint Manual
Center, Huntsville
39
VISCMA – Equipment,
US Army Corps
of Engineers
Engineering and Support
Duct, & Piping Restraints
Center, Huntsville
40
US Army Corps Useful References
of Engineers
Engineering and Support
Center, Huntsville
41
US Army Corps QUESTIONS?
of Engineers
Engineering and Support
Center, Huntsville
42
US Army Corps Background
of Engineers
Engineering and Support
Center, Huntsville
43