PERHITUNGAN HASIL SONDIR

NOMOR SONDIR / ELEVASI : 0.1


PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 1
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
0.20 0 0 0 0 0 0 1 0 0
0.40 0 0 0 0 0 0 2 0 0
0.60 0 0 0 0 0 0 3 0 0
0.80 0 0 0 0 0 0 4 0 0
1.00 0 0 0 0 0 0 5 0 0
1.20 0 0 0 0 0 0 6 0 0
1.40 0 0 0 0 0 0 7 0 0
1.60 0 0 0 0 0 0 8 0 0
1.80 0 0 0 0 0 0 9 0 0
2.00 10 20 10 13.37 13.37 0.75 10 10 0.75
2.20 10 20 10 13.37 26.74 0.75 11 10 0.75
2.40 10 20 10 13.37 40.11 0.75 12 10 0.75
2.60 10 20 10 13.37 53.48 0.75 13 10 0.75
2.80 10 15 5 6.69 60.17 0.37 14 10 0.37
3.00 10 15 5 6.69 66.86 0.37 15 10 0.37
3.20 10 15 5 6.69 73.54 0.37 16 10 0.37
3.40 10 15 5 6.69 80.23 0.37 17 10 0.37
3.60 10 15 5 6.69 86.91 0.37 18 10 0.37
3.80 10 15 5 6.69 93.60 0.37 19 10 0.37
4.00 10 15 5 6.69 100.28 0.37 20 10 0.37
4.20 20 30 10 13.37 113.65 0.75 21 20 0.75
4.40 20 30 10 13.37 127.02 0.75 22 20 0.75
4.60 20 30 10 13.37 140.40 0.75 23 20 0.75
4.80 20 30 10 13.37 153.77 0.75 24 20 0.75
5.00 20 35 15 20.06 173.82 1.12 25 20 1.12
5.20 20 35 15 20.06 193.88 1.12 26 20 1.12
5.40 20 35 15 20.06 213.94 1.12 27 20 1.12
5.60 20 35 15 20.06 233.99 1.12 28 20 1.12
5.80 20 35 15 20.06 254.05 1.12 29 20 1.12
6.00 20 35 15 20.06 274.11 1.12 30 20 1.12
6.20 20 35 15 20.06 294.16 1.12 31 20 1.12
6.40 20 35 15 20.06 314.22 1.12 32 20 1.12
6.60 20 35 15 20.06 334.28 1.12 33 20 1.12
6.80 30 40 10 13.37 347.65 0.75 34 30 0.75
7.00 30 40 10 13.37 361.02 0.75 35 30 0.75
7.20 30 40 10 13.37 374.39 0.75 36 30 0.75
7.40 30 40 10 13.37 387.76 0.75 37 30 0.75
7.60 30 40 10 13.37 401.13 0.75 38 30 0.75
7.80 30 40 10 13.37 414.50 0.75 39 30 0.75
8.00 30 40 10 13.37 427.87 0.75 40 30 0.75
8.20 30 40 10 13.37 441.24 0.75 41 30 0.75

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.1
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 2
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
8.40 30 40 10 13.37 454.61 0.75 42 30 0.75
8.60 30 40 10 13.37 467.99 0.75 43 30 0.75
8.80 30 40 10 13.37 481.36 0.75 44 30 0.75
9.00 30 45 15 20.06 501.41 1.12 45 30 1.12
9.20 30 45 15 20.06 521.47 1.12 46 30 1.12
9.40 30 45 15 20.06 541.53 1.12 47 30 1.12
9.60 30 45 15 20.06 561.58 1.12 48 30 1.12
9.80 30 45 15 20.06 581.64 1.12 49 30 1.12
10.00 30 45 15 20.06 601.70 1.12 50 30 1.12
10.20 30 45 15 20.06 621.75 1.12 51 30 1.12
10.40 30 45 15 20.06 641.81 1.12 52 30 1.12
10.60 35 50 15 20.06 661.86 1.12 53 35 1.12
10.80 30 45 15 20.06 681.92 1.12 54 30 1.12
11.00 35 55 20 26.74 708.66 1.49 55 35 1.49
11.20 35 55 20 26.74 735.41 1.49 56 35 1.49
11.40 40 55 15 20.06 755.46 1.12 57 40 1.12
11.60 40 55 15 20.06 775.52 1.12 58 40 1.12
11.80 40 50 10 13.37 788.89 0.75 59 40 0.75
12.00 40 60 20 26.74 815.63 1.49 60 40 1.49
12.20 40 60 20 26.74 842.37 1.49 61 40 1.49
12.40 50 60 10 13.37 855.74 0.75 62 50 0.75
12.60 50 60 10 13.37 869.12 0.75 63 50 0.75
12.80 40 60 20 26.74 895.86 1.49 64 40 1.49
13.00 40 60 20 26.74 922.60 1.49 65 40 1.49
13.20 40 60 20 26.74 949.34 1.49 66 40 1.49
13.40 40 60 20 26.74 976.08 1.49 67 40 1.49
13.60 50 60 10 13.37 989.45 0.75 68 50 0.75
13.80 40 60 20 26.74 1016.20 1.49 69 40 1.49
14.00 40 60 20 26.74 1042.94 1.49 70 40 1.49
14.20 40 60 20 26.74 1069.68 1.49 71 40 1.49
14.40 40 60 20 26.74 1096.42 1.49 72 40 1.49
14.60 50 60 10 13.37 1109.79 0.75 73 50 0.75
14.80 50 80 30 40.11 1149.91 2.24 74 50 2.24
15.00 60 80 20 26.74 1176.65 1.49 75 60 1.49
15.20 60 80 20 26.74 1203.39 1.49 76 60 1.49
15.40 60 80 20 26.74 1230.13 1.49 77 60 1.49
15.60 70 80 15 20.06 1250.19 1.12 78 70 1.12
15.80 70 85 15 20.06 1270.25 1.12 79 70 1.12
16.00 70 85 15 20.06 1290.30 1.12 80 70 1.12
16.20 70 85 15 20.06 1310.36 1.12 81 70 1.12
16.40 70 85 15 20.06 1330.41 1.12 82 70 1.12

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.1
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 3
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
16.60 70 85 15 20.06 1350.47 1.12 83 70 1.12
16.80 70 85 15 20.06 1370.53 1.12 84 70 1.12
17.00 70 85 15 20.06 1390.58 1.12 85 70 1.12
17.20 70 85 15 20.06 1410.64 1.12 86 70 1.12
17.40 70 85 15 20.06 1430.70 1.12 87 70 1.12
17.60 70 85 15 20.06 1450.75 1.12 88 70 1.12
17.80 70 85 15 20.06 1470.81 1.12 89 70 1.12
18.00 70 85 15 20.06 1490.87 1.12 90 70 1.12
18.20 70 85 15 20.06 1510.92 1.12 91 70 1.12
18.40 70 85 15 20.06 1530.98 1.12 92 70 1.12
18.60 70 90 20 26.74 1557.72 1.49 93 70 1.49
18.80 70 90 20 26.74 1584.46 1.49 94 70 1.49
19.00 80 95 15 20.06 1604.52 1.12 95 80 1.12
19.20 80 95 15 20.06 1624.58 1.12 96 80 1.12
19.40 80 95 15 20.06 1644.63 1.12 97 80 1.12
19.60 80 95 15 20.06 1664.69 1.12 98 80 1.12
19.80 80 95 15 20.06 1684.75 1.12 99 80 1.12
20.00 90 100 10 13.37 1698.12 0.75 100 90 0.75
20.20 90 100 10 13.37 1711.49 0.75 101 90 0.75
20.40 90 100 10 13.37 1724.86 0.75 102 90 0.75
20.60 90 100 10 13.37 1738.23 0.75 103 90 0.75
20.80 90 100 10 13.37 1751.60 0.75 104 90 0.75
21.00 100 110 10 13.37 1764.97 0.75 105 100 0.75
21.20 100 110 10 13.37 1778.34 0.75 106 100 0.75
21.40 100 110 10 13.37 1791.71 0.75 107 100 0.75
21.60 100 110 10 13.37 1805.09 0.75 108 100 0.75
21.80 100 120 20 26.74 1831.83 1.49 109 100 1.49
22.00 100 120 20 26.74 1858.57 1.49 110 100 1.49
22.20 130 150 20 26.74 1885.31 1.49 111 130 1.49
22.40 130 150 20 26.74 1912.05 1.49 112 130 1.49
22.60 130 150 20 26.74 1938.80 1.49 113 130 1.49
22.80 130 150 20 26.74 1965.54 1.49 114 130 1.49
23.00 130 150 20 26.74 1992.28 1.49 115 130 1.49
23.20 130 150 20 26.74 2019.02 1.49 116 130 1.49
23.40 130 150 20 26.74 2045.76 1.49 117 130 1.49
23.60 130 150 20 26.74 2072.51 1.49 118 130 1.49
23.80 130 150 20 26.74 2099.25 1.49 119 130 1.49
24.00 130 160 20 26.74 2125.99 1.49 120 130 1.49
24.20 140 160 20 26.74 2152.73 1.49 121 140 1.49
24.40 140 160 20 26.74 2179.47 1.49 122 140 1.49
24.60 140 160 20 26.74 2206.22 1.49 123 140 1.49

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.1
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 4
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
24.80 140 160 20 26.74 2232.96 1.49 124 140 1.49
25.00 140 160 20 26.74 2259.70 1.49 125 140 1.49
25.20 140 160 20 26.74 2286.44 1.49 126 140 1.49
25.40 140 160 20 26.74 2313.18 1.49 127 140 1.49
25.60 140 160 20 26.74 2339.93 1.49 128 140 1.49
25.80 140 160 20 26.74 2366.67 1.49 129 140 1.49
26.00 140 160 20 26.74 2393.41 1.49 130 140 1.49
26.20 140 160 20 26.74 2420.15 1.49 131 140 1.49
26.40 140 160 20 26.74 2446.89 1.49 132 140 1.49
26.60 150 165 15 20.06 2466.95 1.12 133 150 1.12
26.80 160 170 10 13.37 2480.32 0.75 134 160 0.75
27.00 160 170 10 13.37 2493.69 0.75 135 160 0.75
27.20 160 170 10 13.37 2507.06 0.75 136 160 0.75
27.40 160 170 10 13.37 2520.43 0.75 137 160 0.75
27.60 160 170 10 13.37 2533.80 0.75 138 160 0.75
27.80 160 170 10 13.37 2547.18 0.75 139 160 0.75
28.00 165 180 15 20.06 2567.23 1.12 140 165 1.12
28.20 165 180 15 20.06 2587.29 1.12 141 165 1.12
28.40 180 190 10 13.37 2600.66 0.75 142 180 0.75
28.60 180 195 15 20.06 2620.72 1.12 143 180 1.12
28.80 180 195 15 20.06 2640.77 1.12 144 180 1.12
29.00 200 225 25 33.43 2674.20 1.87 145 200 1.87
29.20 225 230 5 6.69 2680.89 0.37 146 225 0.37
29.40 225 230 5 6.69 2687.57 0.37 147 225 0.37
29.60 225 230 5 6.69 2694.26 0.37 148 225 0.37
29.80
30.00
30.20
30.40
30.60
30.80
31.00
31.20
31.40
31.60
31.80
32.00
32.20
32.40
32.60
32.80

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 1
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2
(Kg/Cm2 )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
0.20 0 0 0 0 0 0 1 0 0
0.40 0 0 0 0 0 0 2 0 0
0.60 0 0 0 0 0 0 3 0 0
0.80 0 0 0 0 0 0 4 0 0
1.00 0 0 0 0 0 0 5 0 0
1.20 0 0 0 0 0 0 6 0 0
1.40 0 0 0 0 0 0 7 0 0
1.60 0 0 0 0 0 0 8 0 0
1.80 0 0 0 0 0 0 9 0 0
2.00 0 0 0 0 0 0 10 0 0
2.20 0 0 0 0 0 0 11 0 0
2.40 0 0 0 0 0 0 12 0 0
2.60 0 0 0 0 0 0 13 0 0
2.80 0 0 0 0 0 0 14 0 0
3.00 0 0 0 0 0 0 15 0 0
3.20 0 0 0 0 0 0 16 0 0
3.40 0 0 0 0 0 0 17 0 0
3.60 0 0 0 0 0 0 18 0 0
3.80 0 0 0 0 0 0 19 0 0
4.00 0 0 0 0 0 0 20 0 0
4.20 0 0 0 0 0 0 21 0 0
4.40 0 0 0 0 0 0 22 0 0
4.60 0 0 0 0 0 0 23 0 0
4.80 0 0 0 0 0 0 24 0 0
5.00 0 0 0 0 0 0 25 0 0
5.20 0 0 0 0 0 0 26 0 0
5.40 0 0 0 0 0 0 27 0 0
5.60 0 0 0 0 0 0 28 0 0
5.80 0 0 0 0 0 0 29 0 0
6.00 0 0 0 0 0 0 30 0 0
6.20 0 0 0 0 0 0 31 0 0
6.40 0 0 0 0 0 0 32 0 0
6.60 0 0 0 0 0 0 33 0 0
6.80 0 0 0 0 0 0 34 0 0
7.00 0 0 0 0 0 0 35 0 0
7.20 0 0 0 0 0 0 36 0 0
7.40 0 0 0 0 0 0 37 0 0
7.60 0 0 0 0 0 0 38 0 0
7.80 0 0 0 0 0 0 39 0 0
8.00 0 0 0 0 0 0 40 0 0
8.20 0 0 0 0 0 0 41 0 0

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 2
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
8.40 0 0 0 0.0 0 0.0 42 0 0.0
8.60 0 0 0 0.0 0 0.0 43 0 0.0
8.80 10 15 5 6.69 6.69 0.37 44 10 0.37
9.00 10 15 5 6.69 13.37 0.37 45 10 0.37
9.20 10 15 5 6.69 20.06 0.37 46 10 0.37
9.40 10 15 5 6.69 26.74 0.37 47 10 0.37
9.60 10 15 5 6.69 33.43 0.37 48 10 0.37
9.80 10 15 5 6.69 40.11 0.37 49 10 0.37
10.00 10 15 5 6.69 46.80 0.37 50 10 0.37
10.20 10 15 5 6.69 53.48 0.37 51 10 0.37
10.40 10 15 5 6.69 60.17 0.37 52 10 0.37
10.60 10 15 5 6.69 66.86 0.37 53 10 0.37
10.80 10 15 5 6.69 73.54 0.37 54 10 0.37
11.00 10 15 5 6.69 80.23 0.37 55 10 0.37
11.20 10 15 5 6.69 86.91 0.37 56 10 0.37
11.40 10 15 5 6.69 93.60 0.37 57 10 0.37
11.60 10 15 5 6.69 100.28 0.37 58 10 0.37
11.80 10 15 5 6.69 106.97 0.37 59 10 0.37
12.00 10 15 5 6.69 113.65 0.37 60 10 0.37
12.20 10 15 5 6.69 120.34 0.37 61 10 0.37
12.40 10 15 5 6.69 127.02 0.37 62 10 0.37
12.60 10 15 5 6.69 133.71 0.37 63 10 0.37
12.80 20 25 5 6.69 140.40 0.37 64 20 0.37
13.00 20 25 5 6.69 147.08 0.37 65 20 0.37
13.20 20 25 5 6.69 153.77 0.37 66 20 0.37
13.40 20 25 5 6.69 160.45 0.37 67 20 0.37
13.60 20 25 5 6.69 167.14 0.37 68 20 0.37
13.80 25 30 5 6.69 173.82 0.37 69 25 0.37
14.00 25 30 5 6.69 180.51 0.37 70 25 0.37
14.20 25 30 5 6.69 187.19 0.37 71 25 0.37
14.40 25 30 5 6.69 193.88 0.37 72 25 0.37
14.60 25 35 10 13.37 207.25 0.75 73 25 0.75
14.80 25 35 10 13.37 220.62 0.75 74 25 0.75
15.00 25 35 10 13.37 233.99 0.75 75 25 0.75
15.20 35 45 10 13.37 247.36 0.75 76 35 0.75
15.40 30 45 15 20.06 267.42 1.12 77 30 1.12
15.60 35 45 10 13.37 280.79 0.75 78 35 0.75
15.80 45 50 5 6.69 287.48 0.37 79 45 0.37
16.00 50 60 10 13.37 300.85 0.75 80 50 0.75
16.20 50 60 10 13.37 314.22 0.75 81 50 0.75
16.40 50 55 5 6.69 320.90 0.37 82 50 0.37

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 3
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2
(Kg/Cm2 )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
16.60 50 55 5 6.69 327.59 0.37 83 50 0.37
16.80 50 55 5 6.69 334.28 0.37 84 50 0.37
17.00 60 80 20 26.74 361.02 1.49 85 60 1.49
17.20 70 80 10 13.37 374.39 0.75 86 70 0.75
17.40 60 75 15 20.06 394.44 1.12 87 60 1.12
17.60 60 75 15 20.06 414.50 1.12 88 60 1.12
17.80 60 70 10 13.37 427.87 0.75 89 60 0.75
18.00 60 70 10 13.37 441.24 0.75 90 60 0.75
18.20 60 70 10 13.37 454.61 0.75 91 60 0.75
18.40 60 70 10 13.37 467.99 0.75 92 60 0.75
18.60 60 70 10 13.37 481.36 0.75 93 60 0.75
18.80 60 70 10 13.37 494.73 0.75 94 60 0.75
19.00 60 70 10 13.37 508.10 0.75 95 60 0.75
19.20 60 70 10 13.37 521.47 0.75 96 60 0.75
19.40 60 70 10 13.37 534.84 0.75 97 60 0.75
19.60 60 70 10 13.37 548.21 0.75 98 60 0.75
19.80 60 70 10 13.37 561.58 0.75 99 60 0.75
20.00 60 75 15 20.06 581.64 1.12 100 60 1.12
20.20 60 75 15 20.06 601.70 1.12 101 60 1.12
20.40 60 80 20 26.74 628.44 1.49 102 60 1.49
20.60 60 80 20 26.74 655.18 1.49 103 60 1.49
20.80 60 70 10 13.37 668.55 0.75 104 60 0.75
21.00 60 85 25 33.43 701.98 1.87 105 60 1.87
21.20 60 85 25 33.43 735.41 1.87 106 60 1.87
21.40 60 85 25 33.43 768.83 1.87 107 60 1.87
21.60 60 80 20 26.74 795.57 1.49 108 60 1.49
21.80 60 80 20 26.74 822.32 1.49 109 60 1.49
22.00 60 80 20 26.74 849.06 1.49 110 60 1.49
22.20 60 80 20 26.74 875.80 1.49 111 60 1.49
22.40 60 80 20 26.74 902.54 1.49 112 60 1.49
22.60 70 80 10 13.37 915.91 0.75 113 70 0.75
22.80 70 90 20 26.74 942.66 1.49 114 70 1.49
23.00 70 90 20 26.74 969.40 1.49 115 70 1.49
23.20 80 100 20 26.74 996.14 1.49 116 80 1.49
23.40 80 90 10 13.37 1009.51 0.75 117 80 0.75
23.60 80 100 20 26.74 1036.25 1.49 118 80 1.49
23.80 80 100 20 26.74 1062.99 1.49 119 80 1.49
24.00 90 100 10 13.37 1076.37 0.75 120 90 0.75
24.20 90 105 15 20.06 1096.42 1.12 121 90 1.12
24.40 90 105 15 20.06 1116.48 1.12 122 90 1.12
24.60 90 105 15 20.06 1136.54 1.12 123 90 1.12

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Air Tawar Kecematan Kateman
TANGGAL : 19 Februari 2018
Hal : 4
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
24.80 90 105 15 20.06 1156.59 1.12 124 90 1.12
25.00 90 110 20 26.74 1183.33 1.49 125 90 1.49
25.20 100 110 10 13.37 1196.70 0.75 126 100 0.75
25.40 100 110 10 13.37 1210.08 0.75 127 100 0.75
25.60 100 110 10 13.37 1223.45 0.75 128 100 0.75
25.80 90 100 10 13.37 1236.82 0.75 129 90 0.75
26.00 90 100 10 13.37 1250.19 0.75 130 90 0.75
26.20 105 115 10 13.37 1263.56 0.75 131 105 0.75
26.40 105 110 5 6.69 1270.25 0.37 132 105 0.37
26.60 105 110 5 6.69 1276.93 0.37 133 105 0.37
26.80 110 120 10 13.37 1290.30 0.75 134 110 0.75
27.00 110 120 10 13.37 1303.67 0.75 135 110 0.75
27.20 115 120 5 6.69 1310.36 0.37 136 115 0.37
27.40 115 125 10 13.37 1323.73 0.75 137 115 0.75
27.60 120 130 10 13.37 1337.10 0.75 138 120 0.75
27.80 125 135 10 13.37 1350.47 0.75 139 125 0.75
28.00 125 135 10 13.37 1363.84 0.75 140 125 0.75
28.20 130 140 10 13.37 1377.21 0.75 141 130 0.75
28.40 130 140 10 13.37 1390.58 0.75 142 130 0.75
28.60 135 145 10 13.37 1403.96 0.75 143 135 0.75
28.80 140 150 10 13.37 1417.33 0.75 144 140 0.75
29.00 140 150 10 13.37 1430.70 0.75 145 140 0.75
29.20 130 140 10 13.37 1444.07 0.75 146 130 0.75
29.40 135 145 10 13.37 1457.44 0.75 147 135 0.75
29.60 145 155 10 13.37 1470.81 0.75 148 145 0.75
29.80 145 155 10 13.37 1484.18 0.75 149 145 0.75
30.00 155 165 10 13.37 1497.55 0.75 150 155 0.75
30.20 165 175 10 13.37 1510.92 0.75 151 165 0.75
30.40 165 175 10 13.37 1524.29 0.75 152 165 0.75
30.60 170 180 10 13.37 1537.67 0.75 153 170 0.75
30.80 180 190 10 13.37 1551.04 0.75 154 180 0.75
31.00 180 190 10 13.37 1564.41 0.75 155 180 0.75
31.20 190 205 15 20.06 1584.46 1.12 156 190 1.12
31.40 205 210 5 6.69 1591.15 0.37 157 205 0.37
31.60 205 210 5 6.69 1597.83 0.37 158 205 0.37
31.80
32.00
32.20
32.40
32.60
32.80
PERHITUNGAN HASIL SONDIR
NOMOR SONDIR / ELEVASI : 0.1
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 1
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
6.20
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.1
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 2
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
10.20
10.40
10.60
10.80
11.00
11.20
11.40
11.60
11.80
12.00
12.20
12.40
12.60
12.80
13.00
13.20
13.40
13.60
13.80
14.00
14.20
14.40
14.60
14.80
15.00
15.20
15.40
15.60
15.80
16.00
16.20
16.40

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.1
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 3
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
16.60
16.80
17.00
17.20
17.40
17.60
17.80
18.00
18.20
18.40
18.60
18.80
19.00
19.20
19.40
19.60
19.80
20.00
20.20
20.40
20.60
20.80
21.00
21.20
21.40
21.60
21.80
22.00
22.20
22.40
22.60
22.80
23.00
23.20
23.40
23.60
23.80
24.00
24.20
24.40
24.60

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.1
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 4
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2
(Kg/Cm2 )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
24.80
25.00
25.20
25.40
25.60
25.80
26.00
26.20
26.40
26.60
26.80
27.00
27.20
27.40
27.60
27.80
28.00
28.20
28.40
28.60
28.80
29.00
29.20
29.40
29.60
29.80
30.00
30.20
30.40
30.60
30.80
31.00
31.20
31.40
31.60
31.80
32.00
32.20
32.40
32.60
32.80

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 1
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2
(Kg/Cm2 )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
6.20
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 2
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2
(Kg/Cm2 )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
10.20
10.40
10.60
10.80
11.00
11.20
11.40
11.60
11.80
12.00
12.20
12.40
12.60
12.80
13.00
13.20
13.40
13.60
13.80
14.00
14.20
14.40
14.60
14.80
15.00
15.20
15.40
15.60
15.80
16.00
16.20
16.40

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 3
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2
(Kg/Cm2 )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
16.60
16.80
17.00
17.20
17.40
17.60
17.80
18.00
18.20
18.40
18.60
18.80
19.00
19.20
19.40
19.60
19.80
20.00
20.20
20.40
20.60
20.80
21.00
21.20
21.40
21.60
21.80
22.00
22.20
22.40
22.60
22.80
23.00
23.20
23.40
23.60
23.80
24.00
24.20
24.40
24.60

PERHITUNGAN HASIL SONDIR


NOMOR SONDIR / ELEVASI : 0.2
PERKERJAAN : UKL/UPL Pembangunan Dermaga
LOKASI : Desa Pulau Burung Kecematan Pulau Burung
TANGGAL : 16 Februari 2018
Hal : 4
TEKANAN JUMLAH JUMLAH HAMBATAN JUMLAH HAMBATAN TEKANAN HAMBATAN
KEDALAMAN
KONUS (Gc) PERLAWANAN GESEK PELEKAT HAMBATAN SETEMPAT KONUS (Gc) SETEMPAT
NO
PELEKAT (HS) (HS)
(M) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm )
2 2
(Kg/Cm )
(Kg/Cm2 ) (Kg/Cm2 ) (Kg/Cm2 )
1 2 3 4 5 6 7 8 9 10
24.80
25.00
25.20
25.40
25.60
25.80
26.00
26.20
26.40
26.60
26.80
27.00
27.20
27.40
27.60
27.80
28.00
28.20
28.40
28.60
28.80
29.00
29.20
29.40
29.60
29.80
30.00
30.20
30.40
30.60
30.80
31.00
31.20
31.40
31.60
31.80
32.00
32.20
32.40
32.60
32.80

You might also like