Pressure Test Checklist for Fire Systems

1) The document is a pressure test checklist for a sprinkler and firefighting system for a commercial and residential building project in Dubai. 2) It lists items to check such as obtaining installation approval, maintaining test pressure, using a calibrated pressure gauge, filling the piping with water, and maintaining water for 24 hours at 1.5 times the system's working pressure. 3) The checklist is to be filled out and signed by representatives from the main contractor, MEP contractor, and client to verify the leakage test was passed based on the specified holding time and pressure.

Uploaded by

punk cm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Topics covered

  • contractor responsibilities,
  • system pressure,
  • pressure test,
  • M/s SAIFCO,
  • contractor checks,
  • project management,
  • test checklist,
  • water maintenance,
  • test duration,
  • firefighting system
0% found this document useful (0 votes)
361 views4 pages

Pressure Test Checklist for Fire Systems

1) The document is a pressure test checklist for a sprinkler and firefighting system for a commercial and residential building project in Dubai. 2) It lists items to check such as obtaining installation approval, maintaining test pressure, using a calibrated pressure gauge, filling the piping with water, and maintaining water for 24 hours at 1.5 times the system's working pressure. 3) The checklist is to be filled out and signed by representatives from the main contractor, MEP contractor, and client to verify the leakage test was passed based on the specified holding time and pressure.

Uploaded by

punk cm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Topics covered

  • contractor responsibilities,
  • system pressure,
  • pressure test,
  • M/s SAIFCO,
  • contractor checks,
  • project management,
  • test checklist,
  • water maintenance,
  • test duration,
  • firefighting system

M/s Al Sahel Contracting

Company
M/s. Al Thamra Self
Owned Property Main MEP
Client Leasing & Contractor Contractor
Management Services

PRESSURE TEST CHECKLIST


SPRINKLER & FIREFIGHTING SYSTEM

Document no: CL-J248(1374)-PL-001-B-03

[Link] Revision

Location
Legend: √ = Means YES, X = Means NO

Complied Inspected by
[Link] Item to be checked (√ ) or (X) Main Contractor

1
Ensure that the Installation Inspection approval for Sprinkler &
Firefighting system is obtained.

2 Ensure that test pressure is maintained during the holding time of test.

3
Ensure the pressure gauge to be used for the pressure testing is
calibrated (calibration certificate is available).

Ensure that all openings in the piping are tightly closed by end
4 caps/plugs and the system is filled with water to the point of overflow
from the highest point.

Ensure that the water is maintained in the pipe network for 24 hrs. @
5 1.5 times of the system working pressure or as specified is higher the
operating pressure.

6
Ensure that there is no water leakage/ drop from any joint of the tested
pipe network.
MTR
Bars2.0 Specified Leak Test Holding time
Pressure Test (Hours)

Test start date & time

Test End date & time

LEAKAGE Test result (Passed/ Failed)

Comments/Remarks, if any
ASCC
Consulatnt

Work done and Checked By


M/s SAIFCO M/s AL SAHEL
(QA/QC Manager) (MEP Coordinator)

NAME

Designation

SIGN

Date
MEP
ontractor

J248-1374
COMMERCIAL AND
RESIDENTIAL
Project: BUILDING AT AL
BARSHA SOUTH 3 ,
DUBAI

Date

NO

nspected by Remarks
in Contractor
Holding time
24

M/s AL AJMI