PROJECT DETAILS
PROJECT NAME : VIVA BHARIYA TOWER 8 / RETAJ
LOCATION : QATAR PEARL
CONTACT PERSON :
CONTACT NUMBER (S) :
Maintenance and Inspection in Accordance with NFPA 25. (as per the table 5.1.1.2)
activation of the
alarm system.
specific floor.
(annually)
position.
PSI
SN LOCATION Remark
18 13TH FLOOR STAIR 1 LIFT LOBBY 175 PSI YES YES YES YES YES OK
19 14TH FLOOR STAIR 1 LIFT LOBBY YES YES YES YES YES OK
20 15TH FLOOR STAIR 1 LIFT LOBBY 150 PSI YES YES YES YES YES OK
21 16TH FLOOR STAIR 1 LIFT LOBBY 145 PSI YES YES YES YES YES OK
22 17TH FLOOR STAIR 1 LIFT LOBBY 135 PSI YES YES YES YES YES OK
27
26
25
24
23
SN
LOCATION
PSI
Reading After the PRV
100 PSI
120 PSI
125 PSI
125 PSI
130 PSI
activation of the
supervisory signal devices
indicating on the fire
alarm system.
Confirm that the zone
control valves are in open
YES
YES
YES
YES
YES
position.
OK
OK
OK
OK
OK
Remark