HAZARD IDENTIFICATION RISK ASSESSMENT & DETERMINING CONTROL (HIRADC)


Company: SK VIN BUILDERS Work: Pilling works for New Bridge no 3 at SSY
Process / Location: To construct new bridge 3 at Southern
Stockyard (SSY) Approved by:
Conducted by: KALATHARAN A/L SANGARAN (Name, Designation, Signature)
(Name, Designation, Signature)

Review Date Review Date

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
1. 1. The contractor/company has
to make sure that Contractor
before resuming operation of Site
work during this supervisor
Standard
MCO period, all the workers
Operating
have undergone
Procedure for
COVID-19 screening and they
Construction
are free from the Lumut Maritime
Industry to
Covid-19 safety Covid 19 Virus. 12 Terminal SOP
R Covid-19 4 3 Operate
measure spreading 2. Temperature Measure and (Med) terminal & premise
During
Symptoms Screening before operation
Movement
workers to be on site
Control Period
3. Contractor shall make sure
(MCO)
the vehicle transporting the
CIDB
workers as undergo disinfection
and sanitisation process every
time before use.

Climb up and down by R Step ladder Falling from 1. Only competent or trained 3 1 OSHA 1994 Contractor
Mobile Crane ladder condition height personnel allowed entering the 3 FMA 1967 Site

Page 1 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
operation area. supervisor
2. Use of handrail during climb
up the ladder.
3. Tool box talks to be (Low)
conducted prior to start of
activities.
4. Use of Safety Shoe.
2.
1. Only competent or trained Contractor
personnel allowed entering the Site
Signage or sticker
operation area. supervisor
Overhead OSHA 1994 to be provide
Head Injury 2. Tool box talks to be 2 1 2
Structure FMA 1967 nearby “Overhead
conducted prior to start of (Low)
Structure”
activities.
3. Use of Safety Helmet.
1. Only competent or trained Contractor
personnel allowed entering the Site
operation area. supervisor
2. Use of handrail during climb
up the ladder.
Uneven 3. Tool box talks to be OSHA 1994
Slip & Fall
surface conducted prior to start of 3 FMA 1967
3 1
activities. (Low)
4. Daily Report for Equipment
Condition.
5. HSSE Daily Observation.
6. Use of Safety Shoe.
Unsecured Slip & Fall 1. Only competent or trained OSHA 1994 Contractor
hand railing personnel allowed entering the FMA 1967 Site
operation area. 3 1 supervisor
2. Tool box talks to be 3
conducted prior to start of (Low)
activities.
3. Daily Report for Equipment
Condition.
4. HSSE Daily Observation.

Page 2 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
1. Only competent or trained Contractor
personnel allowed entering the Site
operation area. supervisor
Unsecured 2. Tool box talks to be
OSHA 1994
platform’s Slip & Fall conducted prior to start of
FMA 1967
grating activities. 3 1 3
3. Daily Report for Equipment (Low)
Condition.
4. HSSE Daily Observation.
1. Only competent or trained Contractor
personnel allowed entering the Site
operation area. supervisor
Unsecured or
Falling from 2. Tool box talks to be OSHA 1994
freely hole
height conducted prior to start of FMA 1967
opening 3 1 3
activities.
(Low)
3. Daily Report for Equipment
Condition.
1. Only competent or trained Contractor
personnel allowed entering the Site
Wrong operation area. supervisor
climbing Backpain, 2. Use of handrail during climb OSHA 1994
Ergonomic Training
posture & Slip Disc up the ladder. FMA 1967
2 1 2
technique 3. Tool box talks to be
(Low)
conducted prior to start of
activities.
1. Daily Report for Equipment Contractor
Hand and Condition. 6 OSHA 1994 Site
Sharp Edges 2 3
Body Injury 2. HSSE Daily Observation. (Med) FMA 1967 supervisor
3. Use of Glove
Irritation of Contractor
the airways, Site
Dusty
coughing, 1. Eye Protection 6 OSHA 1994 Chemical Handling supervisor
Operation 2 3
wheezing 2. Dust Mask N95 (Med) FMA 1967 Training
Condition
and difficulty
breathing

Page 3 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
1. Only competent or trained Contractor
personnel allowed entering the Site
Signage or sticker
operation area. supervisor
Overhead OSHA 1994 to be provide
Head Injury 2. Tool box talks to be 2 1 2
Structure FMA 1967 nearby “Overhead
conducted prior to start of (Low)
Structure”
activities.
3. 3. Use of Safety Helmet.
1. Daily Report for Equipment
Hand and Condition. 6 OSHA 1994 Contractor
Sharp Edges 2 3
Body Injury 2. HSSE Daily Observation. (Med) FMA 1967 Site
3. Use of Glove supervisor
1. Only competent or trained
Operator Mobile crane NR personnel allowed entering the Contractor
Wrong sitting operation area. Site
Backpain, OSHA 1994
posture & 2. Tool box talks to be Ergonomic Training supervisor
Slip Disc FMA 1967
technique conducted prior to start of 2 1 2
activities. (Low)
3. Ergonomic Chair
1. Ventilation Contractor
Dehydration, 3 OSHA 1994
Hot weather 2. Air-conditioner placed inside 3 1 - Site
Heat Stroke (Low) FMA 1967
cabin supervisor
Inadequate Personal
4 OSHA 1994 Contractor
lighting & Injury & 1. Adequate lighting system 2 2 -
(Low) FMA 1967 Site
Limit of vision Mishandling
supervisor
Mobile crane Lifting NR 1. Only competent or trained
Load Pilling machine Personnel personnel allowed entering the
materials Untrained injury and operation area. OSHA 1994 Contractor
3 1 3 -
personnel property 2. Tool box talks to be FMA 1967 Site
(Low)
damaged conducted prior to start of supervisor
4.. activities;
Inadequate Personal 1. Adequate lighting system 2 2 4 OSHA 1994 -
lighting & Injury & (Low) FMA 1967
Limit of vision Mishandling Contractor
Site

Page 4 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
supervisor
1. Only competent or trained
personnel allowed entering the
Wrong sitting operation area. Contractor
Backpain, OSHA 1994
posture & 2. Tool box talks to be Ergonomic Training Site
Slip Disc 2 1 2 FMA 1967
technique conducted prior to start of supervisor
(Low)
activities.
3. Ergonomic Chair
1. Only competent or trained
personnel allowed entering the
operation area. Contractor
2. Use of proper hand signals Site
Property
3. Maintain line of sight between supervisor
Miscommunic Damaged OSHA 1994
crane operator and signalman 3 1 3
ation and Personal FMA 1967
4. Working channel on VHF (Low)
Accident
radio
5. Provision enough walkie talkie
6.Conduct Tool Box prior to start
activity
1. Only competent or trained
personnel allowed entering the Contractor
Property
operation area. Site
Damaged OSHA 1994
Overspeed 2. Tool box talks to be 3 1 3 supervisor
and Personal FMA 1967
conducted prior to start of (Low)
Accident
activities.
3. Cut Off Speed limit
1. Only competent or trained
Equipment
Equipment personnel allowed entering the Contractor
working OSHA 1994
fall into water operation area. 3 1 3 Site
nearby edge FMA 1967
Drainage 2. Equipment operate 2 meters (Low) supervisor
of U Drain
away from edge of U DRAIN
Equipment Man 1. Only competent or trained 3 1 OSHA 1994
working overboard, personnel allowed entering the 3 FMA 1967
nearby edge Fatality operation area. (Low)
of U Drain 2. No personnel allowed to be at Contractor

Page 5 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
edge of DRAIN for work unless Site
equipped by life jacket. supervisor
3. No personnel nearby during
equipment operating.
1. Only competent or trained
personnel allowed entering the Contractor
Mechanical Property OSHA 1994
operation area. 2 1 2 Site
Failure Damaged FMA 1967
2. Adequate maintenance by (Low) supervisor
SSD.
Positioning, Handling & NR 1. Only competent or trained
Install Pilling Personnel personnel allowed entering the
Untrained injury and operation area. 3 1 3 OSHA 1994 Contractor
personnel property 2. Tool box talks to be (Low) FMA 1967 Site
5. damaged conducted prior to start of supervisor
activities;
1. Only competent or trained
personnel allowed entering the
operation area. Contractor
2. Use of proper hand signals Site
Property
3. Maintain line of sight between supervisor
Miscommunic Damaged 3 1 3 OSHA 1994
crane operator and signalman
ation and Personal (Low) FMA 1967
4. Working channel on VHF
Accident
radio
5. Provision enough walkie talkie
6.Conduct Tool Box prior to start
activity
1. Only competent or trained
personnel allowed entering the
Property
operation area.
Damaged 3 1 3 OSHA 1994
Overspeed 2. Tool box talks to be Contractor
and Personal (Low) FMA 1967
conducted prior to start of Site
Accident
activities. supervisor
3. Cut Off Speed limit
Equipment Equipment 1. Only competent or trained 3 1 OSHA 1994
working fall into water personnel allowed entering the 3 FMA 1967

Page 6 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
operation area. Contractor
nearby edge (Low)
Drainage 2. Equipment operate 2 meters Site
of U Drain
away from edge of drain supervisor
1. Only competent or trained
personnel allowed entering the
Personnel operation area.
Man
working 2. No personnel allowed to be at 3 1 3 OSHA 1994 Contractor
overboard,
nearby edge edge of wharf for work unless (Low) FMA 1967 Site
Fatality
of U Drain equipped by life jacket. supervisor
3. No personnel nearby during
equipment operating.
6. 1. If working for
Contractor
height / elevated place height
Working Check safety Property 4 Site
work permit must be
condition for Damaged 1 4 OSHA 1994 supervisor
condition and Work obtained.
whole work and Personal (low) FMA 1967
Permit 2. Equipment and
place. Accident
tools inspection must be
carried out.

7. 1.Dragging of
1. Place piles near the
Pile too far Contractor
installation point.
2.Improper Site
Property 2. Suitable wire sling
handling of supervisor
Damaged to be provided - wire sling 4 3 12 OSHA 1994
Lifting of Pile pile, which
and Personal certified & inspected by (med) FMA 1967
could result in
Accident Contractor
damage
2. All person to stand
3.Swinging of
clear
pile
8. Driving of Pile 1.Possibiility of Property 1. Monitoring by supervisor in 4 3 12 OSHA 1994 Contractor
Pile Breaking Damaged charge to make sure no defects on (med) FMA 1967 Site
2. Equipment and Personal the pile before and during driving. supervisor
not stable. Accident 2. Ground to be level and able to
3. Workers not stand the weight of machine.
protected with 3 Supervisor to check the PPE
helmet and before work commences and all

Page 7 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
4. hearing Only competent or trained
protection personnel allowed entering the
5. Damaged operation area.
Lifting wire on 4. Supervisor and
hammer crane operator to check
6. Flush from condition on a regular basis
welding 5. Erect welding screen to protect
Electric shock other persons in the vicinity from
from welding flash.
welding and 6. Inspection of all
other electrical equipment to be
electrical carried out before the work
equipment. starts and during work
9. 1. Ensure the cutting torch, hoses & Contractor
gas cylinders are free from defect Site
2. Wear the required supervisor
PPE (Long Sleeve Coverall,
apron, safety Goggle etc)
3. Wear long sleeved
1. Defective
coverall & apron.
Tools
4. Use leather hand gloves.
2.Heat Property
5. Keep First Aid Kit at
Radiation Damaged 4 3 12 OSHA 1994
Cutting of piles site
Burns and Personal (med) FMA 1967
6.Keep Oxy-acetylene
3. Oxy- Accident
Cylinders safely at least 5
acetylene
meters away from the work
Cylinders
location.
7. Never use domestic
LPG cylinder for cooking.
8. Close the isolation
valve at cylinders when not in
use
10. Falling piles 1.Eye injury Property 1.Wear safety glasses 3 1 OSHA 1994 Contractor
using hammer from debris Damaged or face shield 3 FMA 1967 Site
becoming and Personal 2. Watch the area you (Low) supervisor

Page 8 of 9
SK VIN BUILDERS

Hazard Identification Risk Analysis Determining Control


R/ Applicable PIC / Due
Process / Activity / Recommended
No. NR / Hazard Effect Current Control (S) (L) (RR) Legal & other Date /
Area Control
E req. Status
are hitting. Keep opposite
hand at a safe distance from
airborne
area to be struck. Use vise or
projectile-
other holding device as
2.Hand/finger
necessary. Do not raise the
contusion due
hammer excessively and
to improperly
strike using massive blows.
striking or
Strike a hammer blow
missing area
squarely with the striking face
to be struck-
parallel to the surface
3. Personal
being struck. Avoid glancing
injury due to
blows and over and under
defective
strikes
and/or
Accident 3. Visually inspect hammer before
damaged
each use. Do not use a hammer
hammer
with a loose or damaged handle or
4. Personal
head.
injury from
4. Hold the hammer
using hammer
with your wrist straight and
5. Personal
hand tightly wrapped around
injury from
the handle. Look behind and
using incorrect
above before swinging a
hammer for
hammer. Do not strike with
intended
side of the hammer.
task
5. Select and use a
hammer according to its
intended use

Page 9 of 9