You are on page 1of 1

Assessors Name: Assessors signature: Location of Date of Review date:

Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

Heat Medium Yes Yes Prior to the Project Site Engineer


 Suitable supply of
18 Exhaust commencement Manager
of the activity water. Supervisor
Construction
 Drink regularly (not
Heat Manager Foreman
Stress when thirsty)
Site Manager Charge hand
 Extra shelter takes
(Activities Tiredness, High Yes Yes
on hot Headache drink to work place. Project Workers
Environment Nausea Engineer
 Adequate rest break
)
 Work in shift HSE Manager
Helpers
 Physical Fitness to
check.
Muscle High Yes Yes  Acclimatization to
Cramps Medium
feed the heat.

Fainting High Yes Yes


Low

RISK RATING MATRIX 1 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09