RAN° 09 Asset / GAZA Diesel Generator Running Test Location Gaza / Main deck /Port side Mellitah Date 14/March/2024
Activity
Residual Risk
Initial Risk Rating
Activity (with controls Additional Controls
ID Hazard What if? Hazard release Consequences Rating Standard Control Measures
Description in place)
L S RR L S RR Comment Responsible
Risk Assessment Conditions Important Instructions Analysis of expressions used to calculate Risk Risk Rating SEVERITY(S)
Work Authorization Work Activity is High Risk:
Work has been authorized Y N
YESNO (L) Likelihood (S) Severity Risk Rating 1 2 3 4 5
Relevant SMS Sections: Insignificant – No
1 Very Unlikely 1
Injuries
SxL= RR 1 1 2 3 4 5
LIKELIHOOD (L)
No Fatigue 2 2 Minor – FAC R
Staff is adequately rested Y N
Unlikely Risk 2 2 4 6 8 10
3 3 Moderate - LTWC L
Fairly Likely Low (1,2,3,4) 3 3 6 9 12 15
Use of proper PPE 4 4 Significant Disability M
Staff is using proper PPE Y N
Likely Medium (5,6,8,9,10,12) 4 4 8 12 16 20
Relevant SMS Form (s) to be used: 5 5 Major Fatality H
Very Likely High (15,16,20,25) 5 5 10 15 20 25
Experienced staff How to assess Risk: Select Severity expression that applies to hazard WITH NO ControlsSelect appropriate likelihood with NO ControlsApply controls and RECALCULATE risk
Staff has task experience Y N
Item Further Actions to control residual risk Action Due Date Completion Date Risk Assessment Review & Approval
Date: 14/03/2024 Prepared By: GAZA Team
– HSE Coord.
– Terminal. SPT