Name of the Activity: Refurbishment of swimming pool and deck area tiles at Hayya swimming pool Doc. No: 2021/RA/089
RA No.: 06
Date:10 /10/2021
Potential Who Risk rating Residual rating
Activity/ Situation/
Sl. Hazard might be Possible outcome
Facility/ Control Measures
No. harmed? (Consequences) S L RR S L RR
Arrangement
1 Awareness of Not aware of the All workers LTI, Equipment 3 3 9 Safety briefing or Tool box talk 3 2 6
employees in the safety rules and and other Damage, Fire, is required on a daily basis
workplace and the regulations at risk persons on Financial Loss, prior to work and must be
rule and regulation for injury site Environment recorded.
of the project Pollution, Man and New staffs and workers should
Material. be inducted.
Verify compliance with all HSE
aspect of the work and report
accordingly.
Implement and comply with
all safety procedure, safety
measures related to the
nature of works that are being
carried out in accordance to
HSE plan, rules and regulation.
- Low risk - Moderate risk - High risk - Very high risk S- Severity L – Likelihood RR – Risk Rating (S x L = RR)
Page 1 of 6
Format Revision
RISK ASSESSMENT RECORD :MBM/HS/RA/01
Name of the Activity: Refurbishment of swimming pool and deck area tiles at Hayya swimming pool Doc. No: 2021/RA/089
RA No.: 06
Date:10 /10/2021
Page 2 of 6
Format Revision
RISK ASSESSMENT RECORD :MBM/HS/RA/01
Name of the Activity: Refurbishment of swimming pool and deck area tiles at Hayya swimming pool Doc. No: 2021/RA/089
RA No.: 06
Date:10 /10/2021
Handling sharp Lack of Operatives LTI, Equipment 4 4 16 The worker shall wear 2 2 4
4 material experience and expose the Damage, Financial appropriate PPE.
lack of activity Loss, Man and Wear cotton hand gloves to
supervision will Material avoid cut injury.
lead to accident
or Cut injury due Personnel shall be trained on
to sharp edges. the safe procedure.
Provide close supervision and
incorporate safety compliance
to his activity at all means.
- Low risk - Moderate risk - High risk - Very high risk S- Severity L – Likelihood RR – Risk Rating (S x L = RR)
Page 3 of 6
Format Revision
RISK ASSESSMENT RECORD :MBM/HS/RA/01
Name of the Activity: Refurbishment of swimming pool and deck area tiles at Hayya swimming pool Doc. No: 2021/RA/089
RA No.: 06
Date:10 /10/2021
- Low risk - Moderate risk - High risk - Very high risk S- Severity L – Likelihood RR – Risk Rating (S x L = RR)
Page 4 of 6
Format Revision
RISK ASSESSMENT RECORD :MBM/HS/RA/01
Name of the Activity: Refurbishment of swimming pool and deck area tiles at Hayya swimming pool Doc. No: 2021/RA/089
RA No.: 06
Date:10 /10/2021
7 House Keeping Poor Worker LTI, Equipment 4 2 8 Each employee will be held 4 1 4
housekeeping expose with Damage, Fire, personally responsible for
leads to Fire the activity. Financial Loss, preventing the accumulation
incident and Environment of unnecessary combustion
Death Pollution, Man and material in the working area
Material and will be held accountable
for their area at the end of the
shift.
8 Slip, Trips and Fall Lack of knowledge Worker LTI, Equipment 3 3 9 Working areas to be kept tidy 2 1 2
may lead to expose with Damage, Fire, & clean as possible at all times
serious accident or the activity, Financial Loss,
property damage Coworkers, Environment Frequently removal of waste
Site Pollution, Man and and debris to waste bin
Supervisors Material
, Site Stack tools& materials in
Visitors designated areas only& insure
way with no danger of them
falling or covering walkways
- Low risk - Moderate risk - High risk - Very high risk S- Severity L – Likelihood RR – Risk Rating (S x L = RR)
Page 5 of 6
Format Revision
RISK ASSESSMENT RECORD :MBM/HS/RA/01
Name of the Activity: Refurbishment of swimming pool and deck area tiles at Hayya swimming pool Doc. No: 2021/RA/089
RA No.: 06
Date:10 /10/2021
Operatives encouraged to
think of others at all times
when placing items or spotting
hazards.
- Low risk - Moderate risk - High risk - Very high risk S- Severity L – Likelihood RR – Risk Rating (S x L = RR)
Page 6 of 6
Format Revision
RISK ASSESSMENT RECORD :MBM/HS/RA/01
Name of the Activity: Refurbishment of swimming pool and deck area tiles at Hayya swimming pool Doc. No: 2021/RA/089
RA No.: 06
Date:10 /10/2021
Date Review Period Date of Next Review
14 September 2021 6 Months 9 March 2022