TASK RISK ASSESSMENT

Engineering Kinetics (Pvt.) Limited


TASK TITLE: Naimat Phase-V Expansion Project Date: 27-11-2014
Activity: Radiography of Spools/Tanks TRA. No. EKL.003
Location: Naimat Phase-V Expansion Project (Green Field)
Description: Radiography of Pipe Spools [Day & Night]
RISK EVALUATION

Y/NALARP
RESIDUAL
ACTION TO BE TAKEN
S/No.

(Refer to
HAZARD HAZARD EFFECT Evaluation form) CONTROLS RISK
S P R DESCRIBE ACTION MANPOWER S P R
1. Sealed source must be contained in a
steel box fixed to the vehicle floor with
the projector locked at all times.
2. Record to ensure that the isotope box
1. The sealed source will is closed and locked properly by Certified
be under strict Radiographer, who is the Performing
Source lost application of the UEP authority of the job.
SPA:RT
Transportation of Camera damage, transport of radioactive 3. Radiation Warning Signs to be posted
1. E 7 10 Supervisor, E 3 6 Yes
Radioactive source Radiation material and Traffic at back and the sides of vehicles.
Safety Watch
exposure Laws. 4.Vehicle carrying isotopes must NOT be
2. Approved radiography parked in one location more than ONE
vehicle. HOUR
5. Radioactive sources must be stored in
a designated compound located in an
open area away from pedestrians and
vehicular traffic.

1. Personal 1. Skilled workforce 1. Ensure the workers involved in the RT Supervisor,


Unskilled
2. injury, F 6 8 deployed. radiography are trained, qualified and Safety Watch F 3 5 Yes
Workforce
2. accident competent to carry out the work safely.

1. Access to such area to be restricted to


only certified/authorized personnel of
Radiography team.
2. Radiography work must be carried out
Radiography work must at agreed hours by area authority,
Radiation be conducted only by preferably at night or during long break Radiological
3. Handling of source exposure, E 6 9 trained, certified and hours. Protection E 2 5 Yes
Fatal classified persons 3. On-site Safety watch must ensure that supervisor
surrounding area, all portal cabins, and
offices are empty of personnel.
4. Safety watch must be posted all around
the area at regular intervals to avoid
unauthorized entry.
After exposure using
sealed sources, a check
by classified personnel
1. After completion of job RPS will ensure
using a monitoring RT Supervisor,
Environmental Damage to living that source is properly sealed and locked
4 E 6 9 instrument must be Safety Watch E 2 5 Yes
Damage cells in vehicle Box.
made to ensure that the
source has been
properly retracted into
the shield.

1. Simultaneous Activities s are strictly


Radiation not allowed in the RT area.
1.No parallel activity RT Supervisor,
exposure, 2. Area will be cleared as declared by the
SIMPOS E 6 9 2.Evacuate area as Safety Watch E 2 5 Yes
impotence, performing authority.
defined
Fatality 3. Entry of unauthorized personnel is not
allowed

Night:
1.Provide adequate LUX
level 1.Working area cleared from obstructions
2.Restricted to go in and visible with proper lighting
other plant area in 2.Unnecessary sitting is prohibited in dark
darkness on ground
3.Use of Proper PPEs 3.Use proper rest shelter provided RT Supervisor,
5. Darkness Personal Injury E 6 9 E 2 5 Yes
4. Any abnormality seen 4. Nobody is allowed to kill the snakes or Safety Watch
during night shift is to be any dangerous insect only assigned
communicated to UEP person (security) will tackle.
site Representative 5. Avoid collecting things from dark spots
immediately. because of hidden snakes.

1. Use safety shoes and gloves


2. Avoid to work at dark place/ around
bushes or holes
3. Stay more and more in excess light
Vigilance, rather than dark places.
Personal injury RT Supervisor,
6. Biological Hazard G 6 7 Adequate lighting 4. Do not catch or attack insects / snakes G 4 5 Yes
Fatality Safety Watch
arrangements While leave the area until it move to the
other place.
5. Proper illumination in night.
6. First aid box should be in place as per
UEPL requirement including Snake bit kit.
GENERAL COMMENTS: Abbreviations
1. TBT will be conducted prior to job start. SPA: Single Person Accountable
2 Proper PPE’s are mandatory for all workers. GCM: General Conversation Meeting
3. Housekeeping of the area should be carried out on prior basis. RT: Radiography Test
4. Supervisor full time must be available.
5. Stand by vehicle/Ambulance must be available at site to rescue the victim.
NAME OF TEAM MEMBERS SIGNATURE RISK ASSISMENT APPROVAL
I’m satisfied that the safeguard put in place will reduce the level of Risk to an acceptable level
Muhammad Asif (Project Manager) and the Task/Action is permitted to proceed.
Muhmmad Ali (QA/QC Supervisor) Reviewed by: _________________________
Farhat Ali HITRA Team Leader
Date: ________________________ Time: ____________________
Authorizing
S = Severity; P = Probability, R = Risk
Signatory: _______________ DATE: ________________