Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:
Inexperienced High Yes Yes Y Yes Prior to the Ensure heavy Project Site Engineer
12 tower crane e commencement equipment operators Manager
operator s of the activity hold required license Supervisor
by the traffic Construction
Overhead department. Manager Foreman
Tower
Crane Site Manager Charge hand
Make sure mobile
crane is operated by Crane
competent person. Operators
HSE Manager
Helpers
Effective
communication
between banks man
and lifting
equipment operator
by means of radio or
hand signal.
Presence of banks
man / rigger man.
Ensure warning
barricades within the
affected work area.
Medium
Ensure visible
warning signage
provided on the
utilities, and always
treat it energized.