You are on page 1of 2

SUNWAY CONSTRUCTION SDN BHD

PROJEK KLCC P1

HAZARD & EFFECT REGISTER (HER)


DESCRIPTION OF ACTIVITY : MECHANICAL
DIV/DEPT : SUNWAY CONSTRUCTION PREPARED BY : ZAHRUL HUZAIRI HUSSIN
VERTICALITY CHECK
LOCATION : KLCC HER NO : 10 REV NO : 00 REVIEWED BY : CAPT. (R) NOOR AZMI SHARIF

TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 07 / 03 / 2014 Page : 1 of 2 APPROVED BY : RAMDANI MOHD AWI
Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action
Measure (8) P A E R Level (5) (9) Plan (10)
1. Sub-activity : - Lifting of Core Barrel
Wear and tear of Negligence of Periodically Wire rope snap Sign board of “Danger Fatality H M - H H M Nil
wire rope operator inspection. Loss of load / Slippery Condition”
No periodic Toolbox to being place near the
Load exceed the inspection. the operator site,
load limit Weather (raining and workers Re-brief workers and
/ dry weather) Third party operator before start
Wire rope inspection the stated works,
fatigue (every three movement,
month) Check wire rope, limit
Ensure the switches hook, latch
limit indicator and checklist
in a good Change to the new
condition wire rope.
Ensure Emergency Recovery
follow lifting Team
procedure Special toolbox by
SOP treat
All work
forces must
wearing
PPE,
Cranes to be
checked
prior
commencem
ent of work

Revision No.: 02, Date : 20/02/2014 Issues No.: 01 Effective Date: 01/03/2009
Page 1 of 2
SUNWAY CONSTRUCTION SDN BHD
PROJEK KLCC P1

HAZARD & EFFECT REGISTER (HER)


DESCRIPTION OF ACTIVITY : MECHANICAL
DIV/DEPT : SUNWAY CONSTRUCTION PREPARED BY : ZAHRUL HUZAIRI HUSSIN
VERTICALITY CHECK
LOCATION : KLCC HER NO : 10 REV NO : 00 REVIEWED BY : CAPT. (R) NOOR AZMI SHARIF

TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 07 / 03 / 2014 Page : 2 of 2 APPROVED BY : RAMDANI MOHD AWI
Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action
Measure (8) P A E R Level (5) (9) Plan (10)
2. Sub-activity : - Taking the measurement
Open / Deep Poor Safety work Workers slip and Proper platform Fatality H - - H H M Nil
excavation housekeeping instruction fall into the bore provided
Slippery Training to hole Hard barricade
Install boring condition workers. provided
casing too Fail to wear Proper PPE Installed lifeline,
shallow from the safety harness wearing safety
ground level harness
(required at Emergency Recovery
least 1m from Team
the ground) Special toolbox by
machinery

PREPARED BY : ……………………………………… APPROVED BY : …………………………………..(PIC) SUPERVISOR : ……………………………………..

NAME: ZAHRUL HUZAIRI HUSSIN NAME: RAMDANI MOHD AWI NAME:

Revision No.: 02, Date : 20/02/2014 Issues No.: 01 Effective Date: 01/03/2009
Page 2 of 2