SEVERITY /
POTENTIAL HAZARD CONSEQUENCES CONTROL MEASURE
SR JOB STEPS
(What can cause harm?) (What can go wrong to (What can be done to prevent it from going wrong?)
whom?)
01 Shut-Down and De- Slip/trip/fall Incident Area to be barricaded and signs to be
watering of the tank. Exposure to Personal displayed
Sides of excavation to be stepped or
(Confined Space) contaminated Injury
protected against collapse while doing
water dewatering.
Exposure to Ensure proper illumination during night.
Proper usage of PPE
pressurized
Proper access to the dewatering area.
water Use pressure testing equipment of
Electric shock appropriate capacity and hose, fittings
etc. of adequate pressure rating. Assign
MARAFIQ –SAUR OPERATIONS & MAINTENANCE COMPANY Document ID No :MaSa- QHSE-SP-08
Page 2 of 5
(MaSa)
Rev. No.: 1
Date of issue: 11-08-2012
SAFETY PROCEDURE – RISK ASSESSMENT
Revision Date: 10-08-2015
Job should be started only after making provision of suitable and safe tools, work equipment, safety and emergency items on site as
stated in risk assessment.
Sr. Tools and other work equipment Qty Sr. Safety and Emergency items
Prior to commencement of job, Authorized Permit Receiver / Supervisor must give information on details of job, hazards, risks and
safety precautions to all personnel involved in the job and obtain their signatures on the form to acknowledge the same.