You are on page 1of 5

PROJECT: K028-FAYYHEALTH-POLYCLINIC

RISK ASSESSMENT FOR SLAB CORING WORK

NO of
ASSESSMENT,
PROJECT/CONTRACT ACTIVITY ASSESSMENT REVIEWED
BY: BY: REVISION &
DATE

PROJECT: K028-FAYYHEALTH-POLYCLINIC

CLIENT: MR SALEM SAIF MOHAMED SEED AL MAZROUEI SLAB CORING SE PM CH/RA/01


WORK
CONSULTANT: AL BAHRI ENGINEERING CONSULTANACY REV: 00

MAIN CONTRACTOR: CHERWELL INTERIOR DECORATION 09/06/2022


LLC.

PREPARED BY: APPROVED BY: APPROVED BY:

ABIOLA FREDERICK ADENIYI PROJECT MANAGER AL BAHRI ENGINEERING

HSE OFFICER CONSULTANACY

CHERWELL HSE DEPARTMENT/DOC.REF.REV-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

POTENTIAL HAZARDS/CONDITIONS TO BE CONSIDERED

Deep Excavations Work on over water Falls from height X Fire risk High winds

Demolition Confined space Falls from level ground Noise/Dust/Vibration X Adverse

Plant/Machinery X Working Platforms X Slips/Tripping X Fumes Environmental risk

Lifting Operations X Manual Handling X Fuel Storage Traffic X Training Required

Buried/Overhead Service COSHH Storage/Lay Down Area Ground Conditions Health surveillance

NO ACTIVITY HAZARD IDENTIFIED AT RISK L S R CONTROL MEAUSRES L S R ACTION BY:


DESCRIPTION (PEOPLE/PROPERTY)

1. Manual handling of Muscle pain, Back Pain, Moditif Technicians. 2 3 4  TBT to be conducted by work supervisor to 1 2 2 P.E, S.O and
concrete coring Back injury all workers before work start. Foreman
machine Properties  Ensure Manual handling training is in place.
 Use manual handling techniques in lifting
heavy equipment e.g., 2 people must carry
this coring machine to divide the total weight
of this machine thus making it lighter and
easier to carry.
 Barricade the work zone for maximum radius
 Place relevant safety signs.
 Full PPE to be comply, Hard hat, safety
shoes, safety glasses and cut resistant gloves
and dust mask.
2 Concrete coring Muscle pain Operator, Workers, and 2 3 6  Only trained and authorized person must 1 2 2 P.E, S.O &
machine operator Property damage operate this machine. Foreman
 Visually inspect the wires and cables for any
defects or ties to avoid short circuit.
 Technicians must keep the electrical cord

CHERWELL HSE DEPARTMENT/DOC.REF.REV-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

away from moist surface to prevent its


accidental contact with water which can
caused electrocution.
3 Concrete coring Electrocution Operator, workers, and 3 3 9  Visually inspect the wires and cables for any 1 2 2 P.E, S.O &
machine operation property damage defects or ties to avoid short circuit. Foreman
 Technicians must keep the electrical cord
away from moist surface to prevent its
accidental contact with water which can
caused electrocution.
 Proper PPE should be provided for all
workforces.
 ELCB is compulsory for electrical usage
 Power supply points to be identified & get
approval from DWTC management before
using.
4 Concrete/Slab Dust / Spill of drilling Moditif Workforce, Trip 2 3 6  Barricade the work areas & maintain good 1 2 2 P.E, S.O &
Coring. fluid & slip housekeeping Foreman
 Wear appropriate PPE according to the job
Environmental Affect descriptions like, helmets dust mask, gloves,
and goggles.
 Ensure that there is a proper protection on
the area to prevent water spillage on the
floor.
 Place polyethylene material on the wall or in
the floor prior to coring operation, drip try to
be available
5 Concrete Coring Coring noise, Workers, Public. 2 3 6  Continuous use of machinery must be 1 2 2 P.E, S.O &
Machine Operation Environmental affect minimized. Foreman
 Wear appropriate PPEs like wear muffs or
ear plugs
6 Working at height on Personnel/ Objects fall Workers, Public & 3 3 9  Ensure scaffold platform is erected and 1 2 2 P.E, S.O &
scaffold platform from height/property property damage. inspected by the authorized personnel. Foreman
 All tools must be secured.
 Only trained personnel to work on scaffold
platform.

CHERWELL HSE DEPARTMENT/DOC.REF.REV-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

 Workplace supervisor is responsible for


ensuring the safe access from ground to work
area
 Continuous monitoring by the supervisor.
 Restrict other parts entry into workplace
without PPE like helmet, safety harness,
goggles & safety shoes.
7 Working near Damage to live Utilities, Moditif Workers, Public 2 3 6  Maintain good housekeeping 1 2 2 P.E, S.O &
utilities and Property damage.  Ensure all personnel are aware the risk Foreman
Slip, Trip, & Fall involved in workplace.
Injuries.  Close monitoring by the supervisor
 Ensure access and egress are free from
obstruction.
 Conduct TBT to ensure all employees are
aware of the hazards in the workplace and
emergency procedure
 Wear appropriate PPE like helmet, goggles,
and safety shoes.

CHERWELL HSE DEPARTMENT/DOC.REF.REV-NO- 01/00 SLAB CORING RISK ASSESSMENT


PROJECT: K028-FAYYHEALTH-POLYCLINIC
RISK ASSESSMENT FOR SLAB CORING WORK

LIKELIHOOD RISKIN RATING The above risk assessment has been briefed as fully understood
RISK 3 2 1 SEVERITY
RATING Name Sign
3 Major/injury/pollution/Damage
S Name Sign
2 Minor/Pollution/Damage/Loss
E Name Sign
1 Injury/Low Damage/Loss
V 3 9 6 3 Name Sign
LIKELIHOOD
E
3 Likely Name Sign
R 2 6 4 2
2 Possible Name Sign
I
1 Never/Very Unlikely Name Sign
T 1 3 2 1

Name of person given risk assessment briefing

Name Date:

Signature Time

CHERWELL HSE DEPARTMENT/DOC.REF.REV-NO- 01/00 SLAB CORING RISK ASSESSMENT

You might also like