You are on page 1of 9

DOC No DS/CA006P02/00022

PAGE No 1 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result

Compiled by the following team:


NAME DESIGNATION SIGNATURE
Project Manager
Construction Manager
Site Engineer
Safety Officer
Risk Assessment Review 1 Review 2 Review 3 Review 4
Review Date: Date : Date : Date:

Name and Signature


of person reviewing :

AUTHORISATION
Prepared by: Approved by
Signature Date Signature Date
HSE Manager Project Manager

TASK ANALYSIS - FORM 1

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 2 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

Impact
SEQUENCE OF TASK STEPS POTENTIAL INJURIES OR HAZARDS RECOMMENDED CONTROLS
H, S, E
1. Pre-use inspection and use of all Failure of equipment, will cause injuries to  Faulty equipment to be repaired/maintained or replaced.
equipment. persons and / or property damage.  Guards to be on all Machinery and appropriate PPE to be
Fuel/oil leaks could cause environmental worn.
concerns. H, S, E  Engine ran machinery to have fire extinguishers available
locally.
 Drip trays/heavy gauge plastic to be insitu in case of leaks
and spill kit to be within the project for accidental spills.
2. Wear appropriate Personal Protective Failure to use Personal Protective Equipment
Equipment. will cause injuries to employees.
Gloves.
Safety boots.  Enforce the use of Personal Protective Equipment AT ALL
H
Overalls. times
Hard hat.
Hearing protection.
Eye protection

3. Use trained employees only Failure may result in injuries to persons and  Enforce the use of competent persons only throughout the
H, S
property damage. project.
4. Manoeuvring of equipment Faulty of equipment result in injuries to person  Equipment driver / operator must hold the valid driving
(mobile pump, concrete truck) and property damage. Oil leaks from the lifting license and vehicle registration.
equipment causing spillage / Environmental  Equipment to be inspected by approved third party and
damage. H,S,E checked by operator prior to use
 Speed limit of 25Kph on site to be imposed.
 Reverse alarm and flagman required for manoeuvring onsite
5. Pouring of concrete Failure may result in injuries to person and H,S,E  Proper handling of concrete and safe work procedure for the
property damage. Equipment collision / Health application to be ensure.
and environmental damage  Approved method statement must be in place prior to start
the work activity
 Use the appropriate PPE.

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 3 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

 Avoid the cement contact to the skin.


 Provide sufficient lightings.
 Avoid concrete spillage.
 Maintain housekeeping procedure.
6. Lifting concrete by crane using concrete Failure may result in injuries to person and  Lifting equipment must be properly inspected and ensure
bucket property damage. safe operating procedure is applied.
Falling of suspended loads.  .Lifting plan procedure must be adopted.
 Concrete bucket to be use must be certified.
H,S,
 Barricade the lifting area.
 Do not lift towards the people underneath.
 Proper coordination between crane operator and rigger to be
ensure.
7. Concrete finishing Failure may result in injuries to person and  Safe operating procedure of power tools
Operating power tools property damage.  Use the required PPE.
(Vibrator, power float machine)  Power tools to be use must be inspected and safe to use
 Avoid exceeding of noise.
H,S,E  Use the competent operator.
 Electrical connections to the power tools must be properly
connected use competent electrician.
 If diesel operated power float machine to be use, avoid
spillage when filling.

RISK ASSESSMENT – FORM 2


Risk Rating Calculation
A + B + C + D
Risk Rating Matrix
Injury Severity Potential Damage / Loss Frequency or Likelihood Environmental Impact
0 No injury 0 No damage 0 Never happened before 0 No effect
1 Minor – (FAC) 1 Minor < 500 AED, No delay 1 Happened somewhere 1 Minor Effect - Short term < less 1 month
Risk Rating
HSE/QUALITY SYSTEM DOCUMENTATION 16
14
12
10
8
6
2
0
5
1
2 4
3
4 3
5
DOC 6No DS/CA006P02/00022
7 2
PAGE No 8 41of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV
9
0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

2 Major – (MTC) 2 Major > 500 AED, No delay 2 Happens occasionally 2 Major Effect - Long term > greater 1 month
3 LTI 3 Major > 10 000 AED, one day delay 3 Happened before
4 Disabling Injuries 4 Serious > 100, 000 AED, >1 day delay 4 Happens regularly
5 Fatality 5 Severe > 1, 000, 000 AED, Weeks delay. 5 Daily occurrence
Risk Rating = A + B + C + D.
Result Classification:

Critical = 17►15 High = 14►11 Medium = 10►7 Low = 6►0


Immediate action. Action in 24 hours. Action in a week. ASAP.

Risk Reduction Hierarchy:


1. Engineering to reduce risk.
2. Replacement with lower risk.
3. Isolation of risk – Barricading or Guarding.
4. Reduction of exposure to risk.
5. PPE and Training

RISK ASSESSMENT – FORM 2 (continued)

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 5 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

Impact HOW IS HAZARD TO BE BY Result


No HAZARD IDENTIFIED RISK ASSOCIATED WITH HAZARD H, S, E RR BY WHOM RR
DEALT WITH WHEN
1  Faulty hand tools and Bruises, cuts. Gloves, trowels in good Supervisor Before &
equipment condition. during
Entanglement, Skeletal Damage. the use
 Mechanical guards not Guards in place and equipment of
in place H,S,E 13 regularly maintained. equipme 6
nt
Contamination of the soil, atmospheric Care to be taken refuelling and
 Unwanted Fuel/Oil pollution, risk of fire. drip trays/heavy gauge plastic to
Spillages be in place as required.
2 Injury to project Potential Death, Major/Minor Skeletal Following PPE to be worn Supervisor Before &
employees damage, cuts and bruises to all parts of appropriately to the task – during
the body, asthma. Gloves. work
Safety boots.
H,S 10 5
Overalls.
Hard hat.
Hearing protection.
Eye protection
3 Un trained employees Poor quality of work, chance for Provided trained/competent PE/FM Always
H,S 7 5
accident /incident or property lost/damage worker and supervision
4  Unsafe driving of Potential Death, Major/Minor injuries to Enforce the use of competent PE/ FM/ Always
equipment person and property damage operator with valid third party Supervisor
Equipment crush into operatives certificate and driving license.
Equipment must be certified by
third party before use
Permit to work procedure must
be issued prior to start the activity
Toolbox talk and training must be
conducted.
Concrete pump must be properly
park in suitable area that does
not affect other site operation.
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 6 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

* RR = Risk Rating

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 7 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

WRITTEN SAFE WORK PROCEDURE – FORM 3

1. OBJECTIVE
1. To prevent injuries to employees and / or property damage incidents.

2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Eye protection.
3.5. Face protection

Prior to work commencement

1. Must have PPE – safety footwear, gloves, hardhat, goggles, face musk, protective clothing etc.
2. Must have appropriate tools and equipment in good condition.
3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 8 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

Hazards

1. Manual handling of materials and equipment – LITE to be considered at all times.


2. Slips and trips from untidy work area.
3. Falling of suspended loads.
4. Collapse of equipment.
5. Hazards associated with equipment
6. Contact with sharp edges of materials.
7. Consideration of weather and ground conditions must be made. If in doubt refer to supervisor.
8. Environmental damage.
9. Fire and chemical hazard.
10. Working at heights.

Harm
Potential Death, Minor/major cuts and contusion, loss of limbs, fractures, damage to respiratory system, electric shock.

Persons in danger

1. Labour / Equipment operators.


2. Other workers/visitors in vicinity, eg. Passers - by in walkways etc.

Control measures

No lone working

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 9 of 9
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 053
Job Description: Floor Screed

1. Appropriate PPE must be worn by all workers on site & special PPE should be provided for those who are directly involved in this
activity.
2. Site Induction and tool box talks should be given prior to start job.
3. Equipment to be used in screed finishing should be inspected and must be safe for use.
4. Employees shall be educated in keeping out of possible crash of equipment and collapse onto operatives.
5. Permit to work system should be in place and permit to work system should be followed by all supervisors and engineers.
6. Daily, weekly and monthly inspection to be done regularly any defect found must be reported immediately.
7. Only personnel involve in the screed finishing activities are allowed inside the barricaded area.
8. Enforce the use of competent persons only.
9. Tag out and Log out system must be applied.
10. Ensure proper cable management is being applied.
11. All hand and power tools must be inspected before use
12. All lifting device to be use must be inspected by third party and certified safe for use.
13. Skid loader, dumper etc. to be use for transporting screed must be certified.
14. Competent operator only will use.
15. All operatives should wear PPE as per the job nature.
16. Maintain work area isolated with means of barricade and appropriate signage should be in place.
17. Remind personnel through toolbox talk to observe proper positioning when working
18. All the work should be done under the competent supervision.