Work Method Statement

Project Name: Morneau Shepell Address: 7th Floor, DLF World Tech Park Sec. 30, Gurgaon.

Company Name: Innovatione India Projects LLP.

Activity/Trade - CARPENTRY WORK TEMPORARY & PERMANENT (RS -04 B)


Address: Plot no. 583, Main road Chirag Dilli, New Delhi, Delhi 110017 Office Contact No: 9910905116
Supervisor Name: Dharmender Contact No: 9910311557

Person
Procedure (in steps) Possible Hazards Risk Control Measures
who will
(Break the job down into steps. (Identify the hazards associated with each Rating (Describe what action or procedure will be taken to eliminate or
minimise the risk of injury or damage. Use the Hierarchy of ensure this
Each step should accomplish some step. Examine each to find possibilities (See
Controls below as a guide happens
major task and be in logical that could lead to an accident or potential below)
sequence.) harm arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Mobilisation of resources Back pain, Slip, trip and Fall. M -Safety Induction, PTW, TBT,FTW Good Housekeeping Site
sup. /PM
Using Hand held machine tools Noise Hazard/Hearing Loss , Injury due -Periodic Inspections of electrical cords, alternating color Site
to rotating tools (saw/grinding), Dust marking after inspection use keep electrical cords off floor sup. /PM
Hazard and out of water;
-Routine site inspections.Do inspects an extension cord for
physical damage before use.
-Local exhaust ventilation provided at machines and workers
are trained in using it properly.
-Suitable respiratory protective equipment (RPE) for very
dusty jobs, and worker trained in how to use it.

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Document Name: Version Correct as at: Page No.
538861881.doc 04 03 Apr 14 1 of 6
Work Method Statement

Person
Procedure (in steps) Possible Hazards Risk Control Measures
who will
(Break the job down into steps. (Identify the hazards associated with each Rating (Describe what action or procedure will be taken to eliminate or
Each step should accomplish some step. Examine each to find possibilities (See minimise the risk of injury or damage. Use the Hierarchy of ensure this
Controls below as a guide happens
major task and be in logical that could lead to an accident or potential below)
sequence.) harm arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Using Hand held machine tools Electric shock M -Periodic Inspections of electrical cords, alternating color Site
marking after inspection must keep electrical cords off floor sup. /PM
and out of water.
-Routine site inspections.Do inspect an extension cord for
physical damage before use.
-Do check the wattage rating on the appliance or tool that
the extension cord will be used with; do not use an extension
cord that has a lower rating.
Working on Scaffold Fall of Labour / Material M Proper job specific PPE's, Full body safety harness Site
Inspection of scaffold before use. sup. /PM

Lifting of Plywood/Placing Door Cuts, Injuries, fall of Plywood/Door M Plywood pieces up to 40 Kg/person will be lifted manually to Site
Frame, Shutters in position while lifting. position.Two person will be deployed on scaffold, for holding sup. /PM
and fixing pelmets

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Document Name: Version Correct as at: Page No.
538861881.doc 04 03 Apr 14 2 of 6
Work Method Statement

Person
Procedure (in steps) Possible Hazards Risk Control Measures
who will
(Break the job down into steps. (Identify the hazards associated with each Rating (Describe what action or procedure will be taken to eliminate or
Each step should accomplish some step. Examine each to find possibilities (See minimise the risk of injury or damage. Use the Hierarchy of ensure this
Controls below as a guide happens
major task and be in logical that could lead to an accident or potential below)
sequence.) harm arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Work completion - Cleaning and Injury due to slip/trip, injury of finger H -Safety Signage should be displayed. Site
clearing area from waste cutting during segregation of waste - Proper stacking of material shifted. sup. /PM
materials pieces. - Material should be stacked in material yard only.
- Emergency procedure included in induction and in briefings
and Tool box talks.

Emergency Situations Disruption to project, Personal H - Presently Builder Emergency assembly point. Site
injuries. - Emergency layout, Number to be displayed floor wise. sup. /PM
- Emergency equipment and ERT member list to be provided
floor wise.
- Relevant PPE

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Document Name: Version Correct as at: Page No.
538861881.doc 04 03 Apr 14 3 of 6
Safe Work Method Statement

Personnel Summary
SUPERVISOR’S DETAILS
Supervisors Name & Qualifications: Name:
Experience:
Qualifications:
Supervisor’s Responsibilities:
In addition to the above, the supervisor is to provide training in the use of this WMS, issue PPE and provide training in the same, supervise the
work, ensure conformity with this WMS, amend the WMS when additional hazards are found (and if applicable, ensure all workers receive a tool-
box talk to discuss the control measures for the additional hazards).

DESCRIPTION OF TRAINING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK

H&S GENERAL INDUCTION: All workers must have successfully completed industry induction training

WORK ACTIVITY TRAINING: All workers need to have been trained in the activities outlined in this safe work method statement.

SITE INDUCTION: All workers are to be site inducted by the Principal Contractor, prior to commencing work on site.

OTHER: (List other training undertaken by workers): (eg: Confined Space, Manual Handling, Traffic Control etc)

TICKETS, PERMITS or LICENCES REQUIRED to undertake this work (ie. Certificates of Competency, Confined Spaces etc):

N.B. - Copies of the above must be shown to the Principal Contractor during site induction.

LEGISLATION, CODES OF PRACTICE and GUIDELINES applicable to this work

All work to comply with the <insert location> H&S Acts and Regulations and amendments, Workplace Injury Management & Workers Compensation Acts

Additional Codes and Standards applicable to this trade:

Document Name: Version Correct as at: Page No.


538861881.doc 04 03 Apr 14 4 of 6
Work Method Statement

Equipment & Material Summary


PLANT and EQUIPMENT used and MAINTENANCE FREQUENCY :

Serial Plant/Equipment Contractor Government Plant Hazards Maintenance/service records and log books sighted
Registration No. identified and by Principle Contractor prior to equipment being
controlled within used on site?
(Where applicable)
WMS?
Yes No Sign Date

1
2
3

ELECTRICAL EQUIPMENT USED DURING THE WORKS (Attach Electrical Equipment Register if applicable):
Item Tag/Item Testers Name & Signature License Number Test Date Result Test Date Result
Number
____ /____ /____ ____ /____ /____
____ /____ /____ ____ /____ /____

HAZARDOUS SUBSTANCES or DANGEROUS GOODS USED IN THE WORKS and anticipated volumes (Attach MSDS if applicable):
MSDS
Purpose Location & Volume Used Controls
Date on Site Date Left Site Product Name MSDS Date Attached
(ie. Application on site) on Site (& PPE to be worn)
(Y/N)
/ / / / / /
/ / / / / /
/ / / / / /
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and storing these chemicals. Disposal is to be as per the waste disposal methods
in the MSDS. Spillage and leaks are to be cleaned up as per the spill/leak procedures identified in the MSDS.

Document Name: Version Correct as at: Page No.


538861881.doc 04 03 Apr 14 5 of 6
Work Method Statement

We agree that we have been consulted in the hazards and control measures and agree to complete the work in accordance with our Work
Method Statement (WMS).
We have been provided with training in all tasks outlined in our WMS and in the Codes of Practice applicable to our work.

Employee / Worker Signature Date Employee / Worker Signature Date


1. 8.
/ / / /
2. / / 9. / /
3. / / 10. / /
4. / / 11. / /
5. / / 12. / /
6. / / 13. / /

Reviewed by: Signature: Date:


(Principal Contractor’s Representative)

Any changes, additions or deletions made to this WMS are to be covered with the above personnel and the Principal Contractor’s representative at a Toolbox
meeting (Record date and time of Toolbox meeting below):

Date: Time:
Comments:

A copy of the Toolbox Meeting must be attached to this WMS.

Document Name: Version Correct as at: Page No.


538861881.doc 04 03 Apr 14 6 of 6