COMPOSITE WORKS AT MANGLORE FOR
HPCLPROJECT
Project No. W-488 Rev. 01 Page1 0f 2
JOB HAZARD ANALYSIS FOR EXCAVATION AND BACKFILLING
S.NO DESCRIPTION HAZARDS CONTROL MEASURES
1 Survey of the job Slip and trip Implement housekeeping procedures.
site Wearing of the required PPE’s particularly safety harness in deep excavated
area.
2 Excavation of earth Slip and trip of workers. Secure approved excavation work permit prior to the start of the work.
and trenching Fall of workers and Excavation plan and excavation work checklist must be available at the work
equipment’s. site.
Cave-in of excavation Assign licensed and experienced operators.
walls. Excavation site must be cordoned with safety warning tapes and / or hard
barricades painted with red & white whichever is applicable including
provision of sufficient lightings & blinker lights during nighttime.
Install adequate safety signs such as excavation in-progress, keep out - deep
excavation, etc.
Assign experienced and trained personnel / workers.
Provide spoil area away at least 2 meters from the edge of the excavation to
avoid cave-in or collapse in case excavated materials will not be hauled or
disposed at once.
Provide sufficient shoring system, sloping of ground or other equivalent
means such as sheeting, crossing bracings, trench shield or box and jacks,
benching, underpinning, etc. whichever is applicable.
Prohibit movement of vehicles and equipments near the edge of the
excavation that may result to side wall excavation cave-in or collapse due to
severe ground movement.
3 Backfilling works Slip and trip of workers. Implement method statement / procedures on safe backfilling works.
Fall of workers and Strict supervision during backfilling works.
tools / equipments. Wearing of the required PPE’s.
Assign licensed and experienced operators.
Assign experienced and trained personnel / workers.
Page 1 of 2
COMPOSITE WORKS AT MANGLORE FOR
HPCLPROJECT
Project No. W-488 Rev. 01 Page2 0f 2
JOB HAZARD ANALYSIS FOR EXCAVATION AND BACKFILLING
4 Trenches Falling from height and cave' in Earth excavated to be stored 2 meters away from excavation site.
Earth excavated in "V" shape.
Vehicle to be kept in 2 meters from edge of excavation.
Experienced and trained workers.
Essential PPE in use.
Method Statement in place.
5 Environmental Extreme environmental Implement safety procedures & guidelines on heat stress.
conditions during condition such as high Inspect excavation and adjacent areas for possible hazardous atmosphere and
excavation works. temperature & humidity and any other condition that may present a hazard.
strong wind. Suspend / stop all operations during extreme temperature & humidity and high
wind of more than 25 knots.
1 03-10-2021 Issued for review
PREPARED BY CHECKED BY APPROVED BY PROJ. MANAGER
REV. DATE DESCRIPTION
(Initials) (Initials) (Initials) (Initials)
DOCUMENT REVISIONS
Sections changed in last revision are identified by a line in the right margin
Page 2 of 2