Yo AlMuhaidib waxaall JOB SAFETY ANALYSIS anor Contracting Giga) COMAPANY: AL MUHAIDIB CONTRACTING JOB DESCRIPTION: INSTALLATION OF POTABLE WATER PIPING, TESTING WITH VALVE INSTALLLATION PREPARED BY: REVIEWED By: REVIEWED BY: (Name & Sign) Amr Ahmed Saudi Aramco PMT | Randeep Kumar Construction Manager HSE manager % < Sign & date: i PPE Reguinesnrs PLANT, EQUIPMENT & TOOLS FOR JOB TAGGING & SIGNS: : ees oa “Check&” “Check” “Check&\” Safety Harness | BQ SCBA CL] tadaer | BQ} Asphate cutter | [J | Men Working avove | spss Q Statictine = |] Airline C1] Mama toots | BY} winch | | arr mtesh | 3) | anstruction Mannats | Steel Capped Boots | BJ] Air Purifying Respirator | [] Shovel ee Flagging B Procedures 8 Bard Hat | BR] Consinea space Harness | [] | Welding Machine |] | wackhoe | C] | rersonattocks | | workin Q Dark Safety Glasses | BQ] Gloves- pve C1] compactor | 2] } PowerSource | Danger Tags | [1] oe Work Permit | 5 Clear Safety Glasses | [RJ] Gloves — Hyftex (vitritey | I Dri BI} crane C1] outorservice rags | | tsottion permit | Goggles Cy] Glover-Leather Riggers | BQ} Grinder «| BQ] © ewe | C1] tntormasion tags | | excavation Permit a Face Shield m o Scaffold g Fans Oo Gl) omnes | ey [__suseen 1] Fireestinguisher | BQ} seissortin | oO oO Hearing Protection | BR] OC] fremionket | | sackttommer | o Oo VU HAZARD PROMPT - “Chech{§]". Identify the job hazards and assess the RISK personnel may be exposed to before safe guards are implemented: a BNA TNA | padiation [ENA DNA INA j i Low Dhow Qlow adation | | FiLow Dow | smror | Eltow Electrical Venictes | Tavioy | Pressure | ROY | weather | FALo™ Ehes Het | Eos | Suey High High Ohigh high Brigh Height | BINA INA pwa NA INA RB . . Low in | tow | Rotating | Gtow JLow . | Erow Chemical Access Tava | Der | Eker | rguipment | Elva | Peterson |" | eaguimee | tow Ohtigh Sigh Bhuigh Ona INA Owa i Dhow Moving Jow | wot/cotad | BLow ; Tools Vibration | Bahay | Dust sie | Baha Objects, | vier | Lighting High High N/A, = INA i ow | stips iting | E}tow | Overhead | FJtow ‘Gasins Nolse | Med Trip fed | Equipment | C]Med hazards | [Med Brien _| Bash Dish Ghitign _|___ Medium (SB) HighGD) | ihGE | |___Medium (4B) | _ Medium (4C) _ High(4D) High (4B) _{| Medium GB) ___|__ Medium 3C)_ ___ Medium (3D) HighGE) | == tei). Low (1A) Low (1B) Low (1C) Medium (1D) Medium (1E) ‘Very Low Low Medium High Very High A B c D E * Likelihood values based on table $4-1 criteria. ** Hazard Severity / Consequence values based on Table $4-2 criteria, Table S4-1 Likelihood Categories Medium (2D)_ Medium (2E) Description Level Frequency 1 Very Low _| Never heard of in the industry 2 Low Some incidents have occurred in the industry 3 Medium | Incident has occurred in Saudi Aramco 4 High Has occurred several times in Saudi Arameo a 3 Very High Level | Frequency People: No injury or damage to health Environment: No or slight effect/damage wi A | Very Low Reputation: No impact and or public concern. Minor employee injury or damage to health not affecting work performance nor requiring treatment beyond fi Environment: Minor contamination within fence; no permanent effect quipment damage and/or operational impact < $100K ight impact and no public concem. Public or media awareness may exist lose time injury, restricted work or irreversible health c Medium Environment: Localizes effect within the plant fence with limited damage and spontaneous recovery Economie: Equipment damage and/or operational impact <$1 MM Reputation: Regional public/media attention, People: 7 eg yamage and/or operational impact < $10 MM Reputation: National public or media attention People: Multiple employee or third party fatalities ive area(s) w/ significant consequence and loss. Economie: Equipment damage and/or operational impact > $10 MM Reputation: Reputation: Intemational public/media attention, with severe impact E | Very High Job Step Task Hazard / Risk Risk | Control Methods and Monitoring vod 4 Describe the job step by | | What are the hazards with each | Risk What hazard safe guards will be use? mee ea step? job step? ¢ | How will the effectiveness ofthe controls be determined? | °* i (inspection & ongoing monitoring) ation of manpower a) Lack of site awareness i, i, Require Safety induction to new workers prior to and equipment on the site any work at field, | ii/Train all employees on traffic management plan and requirements, b) Interaction with Light & i.Follow speed limit 80 km on temporary access road Heavy vehicles {internal project access road 40 km/hr and AMC site and laydown 20km/hr. 4D_ | ii, Head lights to be turn on when on the move. 3c | AMC Adverse road con unauthorised entry i. Hazard lights to be tum on when vehicle is temporary topped along the side of the highway. iv) No reverse par lowed all equipment’s and es to be parked “in” and “out” system. Not to take any unwanted risk during shi ii, Plan ahead for the route and always be alert for any consequences, iii. Get a map and use alternative route for better road condition, iv. Presence of mind while behind the wheel & expect the unexpected. Make eye contact with other commuters. v. Vehicle/equipment check pre-start, First aid kit, warming triangle, spare tire, jack & communication 4 [dentification sticker and ID Cards for all vehicl employees, Delivery trucks has to be escorted from the gate, id Barricade the area with hard barricade. lace safety warning signs in the area. 2 | Delivery of materials: a) Unsecured load b) Road condition ©) Over speeding 3C i. Inspect all binding equipment’s and ensure all are in ‘g00d condition. i, Load shall be secured properly at the starting point. i, Driver should follow the required speed limit in the road as well as on the construction si ii, Escort to be provided to the trailers, AMC 3. | Welfare a) Heat stress b) Sanitary waste c)General waste «No proper prayer area €) Improper parking 3c i. Cool drinking water station shall be available with regular water supply. i. Toilet facilities with proper disposal of sanitary waste. Hand wash facilities, i. General waste to be collected in designated area and disposed properly. i.Prayer area shall shall be provided with proper signs. No prayer allowed in non-designated areas in site. i.Proper parking area shall be provided. 2c NL ‘Remoteness a)No Proper Transport b)Vertomous insect or snake bite. ) Vehicle stuck @)Sand storm c) Heat stress f) Alone worker 3c i.No employces are allowed to walk outside the site, supervisor to arrange transportation as needed. i, Awareness to the employees to be far from the snakes and updated emergency contact numbers which include AMC medical clinic and ambulance to use in case of emergency. i, Do not drive in unauthorised area and use 4x4 vehicle to drive on sand. i, Use dust mask and keep vehicle standby. i, Ample cold water storage should be available, drink ii,Proper shade or vehicle standby. i. Buddy system to be followed. 2c | AMC Surveying Activity a) Venomous insect or snake bite. b)Protruding rebar ¢) Tools in poor condition d)Flying Objects 3B i, Awareness to the employees to stay away from the | 3A. snakes and updated emergency contact numbers which include AMC medical clinic and ambulance to use in case of emergency shall be provided to the employee. Use dedicated area for resting . Do not disturb the existing fauna by hand if any use wood stick, i, After marking and installing rebar put rebar cap. Inspect tools and monthly colour code before use. . Wear hand gloves epoxy (cotted) i, Wear eye protection AMC Manual handling ) improper technique b)Strain c) Sharp edges 3B Use proper lifting technique don’t bent your back. Use enough man power for heavy load. Work rotation or rest to be provided at regular intervals as per the heat stress plan. - Wear cut resistant gloves. . Use minimum 3 people for long pipes. Be aware of pinch points do not work on pipes. Do not throw materials, 2c AMC “SAK Loading and Unloading of materials at site Use of forklift/boom truck/trailer a)Stored Energy 'b)No proper access ¢) Damage lifting gears 4) Improper position of equipment (boom truck) ©) Unauthorised entry £) Wind speed 2)Swinging of suspended load 3C . Inspect load prior to loosening holding straps. i. Use ladder to access into the trailer bed and maintain three points of contact when climbing the ladder. ii, Do not move around on top of load. |. Use certified lifting gear, do not exceed the specified S Regular inspection, reporting and replacing damage ing gears, Aramco certified, trained, Operators & rigger in place, Position the boom truck should be in properly compacted surface. Outrigger to be used properly with outrigger pad. Determine the safe work load. . Use SA approved rigger. Barricade the area, proved warning signage and flagman, No lifting activities if wind speed is higher than 32km/hr. |. Use tag line to control the load. Never stand or walk under suspended load. No lifting in winds higher than 32km/h, 3A | AMC / © Use of forklift h)Unauthorised riding of forklift i) Protruding Elevated forks i) Overload 1) Blind spots 3D iti, Only SA certified operators shall operate fork Lit. Personnel other than the operator shall be prohibited from riding. Forks shall not be left in the up position while forklift is unattended, Forklift shall not be used beyond their rated capacity. Avoid over stacking of the load. yhen moving on a level surface or uphill on an incline. Do not allow any person to stand or walk under the elevated forks, whether loaded or unloaded. Reverse alarm to be checked by the operator prior to run the forklift, Forklift shall not be left running while unattended. Trained Flagman shall be present. Move reverse if the load obstructing the front view. Flagman & operator shall be trained of blind spot of the vehicle PWAS system to be installed & make sure functioning properly for earth moving equipment’s. Trained flagman shall be available while reversing Do not store materials inside or edge of the excavation. Reduce or avoid reversing as much as possible Use dedicated parking arcas Do not use unauthorised area for praying. 3A AMC Provide & use pedestrian walkwa 8 | Marking of slab & wall b)Sharp edges ) Improper access «)Pinch point a) Inadequate working space 3D . Wear cut resistant gloves. (epoxy coted gloves) Use proper hack saw blade with frame.do not use . Make sure at least 1 meter clear access for the work . Keep work area free from obstructions & maintain | housekeeping. without frame. area, Keep work area free from obstructions & maintain housekeeping. in both side of the duct bank as a proper working space. Wear ppe, helmet, googles, cut resistant gloves, safety shoes, vest & coverall. Proper supervision in place. Area to be barricade & signages in place to control unauthorised entry. 3A, AMC 9. | Work at Height ‘) No proper platform b) No tie off ©) No trained workers 4E Scaffold or other standard platform to be provided. Do not use defective or homemade ladder. i, 100% tie off required or life line shall be provided. i, Workers shall be trained for work at height. 3c AMC 10 | Erection and working on Scaffolds Work at height, a) Improper design of scaffold ») Falling from Height 3c i. Special scaffolds or seaifol . Scaffold taller than 38 m require additional review . Scaffold erection to be undertaken by trained iv. Keep work area isolated from unauthorized entry. ~ Keep 3 point contact while ascending or descending . Planks shall not be painted or treated in any way '. Remove all loosen unwanted materi . Only LVL is allowed to use as platform (Laminated Erector has to use minimum 2 planks secured while Her than 12.2 m require scaffold plans and review by the proponent and the area Loss Prevention Division. by SA. All scaffold erectors has to be competent and qualified, 3A | AMC scaffolders working under competent Scaffold crew should be equipped with PPE, helmet, googles, gloves, safety shoes, fall protection equipment during the work. Planks shall not be painted or treated in any way that would conceal defects. Improve housekeeping at scaffold plat form. Do not drop small materials or scaffold components to ground ladder, At the height 1.8 m all crew members must follow 100% tie off policy during the work. that would conceal defects Is from the latform, Veneer Lumber), erecting the scaffold. // V/ # Use of mobi scaffolding ©) Falling materials ) Uneven base level e) Unsafe access and egress f) Scaffolds not properly tagged before use. 30 i. Wear PPE (Hard hat, Gloves, Steel toe boot, Safety glass) all time at PPE area, ii, Make exclusion zone prior to start the a sign boards. Do not store materials on platform. . Fix toe boards on all scaffolds, v. Do not drop materials, use rope to take or lower the materials. vi, Maintain good housekeeping and keep walkways free from obstruction i. A6"x 6" x 4" thick steel plate shall be provided at the base of scaffold for load distribution from the posts. Scaffold shall be erected to plumb & square. Certified personnel will supervise and inspect all the seaffol iv. All scaffold structures shall be erected with metal component. i, Ladders shall be inspected before use and remove defective ladders, ii, Ensure ladder extend minimum of 1 m above the Properly secure the ladder at top. iv. No monkey climbing allowed always use ladder. i, Checklist for the scaffolds shorter than 6 m shall be filled and tags signed by the scaffold supervisor. Checklist for special scaffolds and scaffold taller than 6 m shall be filled and tags signed by scaffold supervisor and scaffold erector. iii,_No one is allowed to work on Red Tag except 3A | AMC vf #2) Openings h) Tip over i) Poor work clearance i) Poor lighting k) Projected /protruded materials scafolders: iv. Scaffold supervisor to make sure tag is updated frequently after any modification. Inauthorised personals are not allowed to put tags. 1.5 gap has to be maintained from excavation, < i. Do not move the mobile scaffolding while people 3c are on top. height ratio has to be followed i. Make sure floor opening are secured & closed i. Do not move the mobile scaffolding while people are on top. Make sure work area is clear from obstructions Area has to be barricaded & signages in place. Work area to be properly illuminated Supervisor to make sure proper illumination in place. Be aware about protruding items, Proper supervision in place. Any protruded items to be covered proper! 3A | AMC Scaffold Dismantling a) Fall from height, falling materials, . 100% tie off policy has to be strictly followed. . Do not work on pipes i. pinch point, Use temporary secured ladders to clamp levels . Use Do not drop any materials. Keep down side free from people and no entry for unauthorized people. Use rope if needed, . Desi-chaining system to be adapted. Gin wheel & 4E : 3c. | AMC b)Falling materials, dust, i. Provide overhead protection in exposed areas. Use trip gin wheel & tag line for gin wheel rope. Keep area free from obstruction, Isolate the area. Only trained persons are allowed to work. Full time supervision. v. Do not store anything inside building, Store material type and size basis, [12 Installation of pipe, wall hanger support, valve, flanges & €) Inadequate working space £) Strain 2)Sharp edges h)Protruded objects i) Improper access j) Electrical shock 3B ii. Keep work area free from obstructions & maintain housekeeping. . Use at least two or three-man power for material handli . Work rotation or rest to be provided at regular intervals. Wear cut resistant gloves. (epoxy coted gloves) Use proper hack saw blade with frame.do not use without frame, i. All protruded objects to be capped or from the roof/wall to be identify. Make sure at least 1 meter clear access for the work area. Keep work area free from obstructions & maintain housekeeping, Maintain both side of the duct bank as a proper ‘working space. . Electrical connections shall be as per standard. . Inspection & updated checklist in place prior to start. No naked & damaged connects allowed. Keep the electrical wires at least 2meter above from the ground level. ~ Working nearby road crossing area do not put wires exposed to traffic-use proper stand, Make sure Drip tray & fire extinguisher in place. 2c | AMC proper grounding to be installed for the * Working near by barricading open edge Pinch point 1) Over reaching m) Poor i n) Flying objects 0)Rotating parts 3B ‘equipment’ prior to start. . Wear ppe, helmet, googles, cut resistant gloves, safety shoes, vest & cover Proper supervision in place. ‘Area to be barricade & signages in place to control unauthorised entry. i, No one is allowed to work in over reaching ii. Make sure proper working platform available for all work at height acti i. Proper supervision in pla iv, Barrication & signages in place Supervisor to Make sure all work areas having proper lights Inspect the area prior to start the work. lumination is not enough work activity will be suspend immediately, All people must wear appropriate ppe, helmet, cut resistant gloves, safety shoes, googles, dust mask Barricade the work area to control unauthorised entry. . Inspect the tools & equipment’s prior to use. Barrication & signages in place to control unauthorised entry If grinder will use disk RPM should be higher than the machine. All electrical cable should have proper stand or hanger at least 2meter height from ground level. Do not hang the electrical cables scaffolding or other me 2c AMC Flushing pipe Tine a) Damage of pipe/flanges 3D b)Pinch poinv/Injury ©) Improper access & egress d) Damage of equipment while manual handling e) Pinch point £) Improper manual handling i. Ensure all equipment and tools used for testing are appropriate and safe to operate. Ensure all equipment’s inspected, colour coded by the competent person prior to use. . Proper supervision & stand by man in place iv. Keep the area free from obstructions, v. Make sure area is barricaded & no unauthorised entry signages in place. ii, 3A Wear ppe’s hand gloves, helmet, safety shoes, goggles & face shield, Proper supervision in place, Updated emergency number in place . Proper access, egress shall be provided in the work area. Follow proper manual handling method avoid ng the back. i. Keep your hands away from pinch point while thrust block. ii, Make sure all connection joints in manifold have a whip lock to avoid failure .. Use enough manpower to lift the load at test-two or more. Follow proper manual handling method while lifting 4, concrete blocks avoid twisting the back. 2) Substandard hose connection h) Leaks §) Falling from Height 3D i. All connections shall be inspected prior to start the | work activity in daily basis, ii, Full time Stand by person is available during the ty. |. Use whip lock to reduce accidental uncontrolled releasing of valve or connections. iv. Flushing water can be used for dust control until no chemicals been added. v. Incase any chemicals used MSDS need to be reviewed by Ame/sapmt safety department prior to dispose. i, No unauthorised personnel is allowed to work in the pipe ‘Only qualified person is allowed to inspect. Isolate the area with warning tape & stand by person is available. i, Incase leak noticed immediately report to responsible supervisor or engineer. Do not approach the leak area wi assessing the leak. Refer the leaks before doing any repair. Keep leak area barricaded & identification signages should be provided. vy. Emergency contact numbers should be posted in the test area vi. Depressurised the, locate the leaks, if necessary tighten the flanges/bolts, vii. If leak in the line, complete depressurise & rectify the joint leak work at height act ities to be carried out by the by trained personnel undergo to Ame work at height training / 3A | AMC v ii-All personnel should be equipped with PPE helmet, cut resistant gloves, googles, safety shoes & fall 3D protection equipment during the work. . Improve housekeeping at scaffold plat form. ~ Do not drop small materials or scaffold components to ground. v. Keep work area isolated from unauthorized entry. vi. Keep 3-point contact while ascending or descending ladder. At the height 1.8 m all People must follow 100% ie off policy during the work. i. Remove all loosen unwanted materials from the working platform. i, Ensure all equipment and tools used in the hydro testing are appropriate and safe to operate and with valid calibration/Test certificate. | 3A ii, Ensure all equipment’s inspected, colour coded by | 2C | AMC the competent person prior 14 | Hydro testing preparation a) Substandard or poor quality 7 / 15 Testing Preparation * Setting the manifold pressure gauge & pressure relief valve for hydro tes nside excavation a. Hand injury a) Improper access & egress a) Damage of equipment while manual handling ‘)Pinch point k)_ Improper manual handling 4a Use safe access to enter the excavation, Keep area free from obstructions Maintain good housekeeping iv. All tools and equipment’ shall be inspected, colour coded & maintain in good condition. Correct tools shall be used for right job. ‘Wear proper PPEs hand gloves safety shoes, hard hat, safety glass. ii, Proper access, egress shall be provided in the work area, ii, Follow proper manual handling method avoid iii. Whip check should be installed iii, Keep your hands away from pinch point while fixing thrust block. iy, Make sure all connection joints in manifold have a whip lock to avoid failure Use enough manpower to lift the load at test-two or more. iv. Follow proper manual handling method whi 3A | AMC 16 | Water filling to the line- using of water tanker b) 4d) Man, machine interface Machine, man inter face Blind spots Substandard hose connection 4a], viii. i. All heavy equipment shall be equipped with reverse | 34 alarm, revolving warning light and PWAS. Keeping safe distance 5 meter away from the vehicle movement or shall not be present in the radius of 5 meter. Should provide pedestrian walkway Designated parking area. Proper access to be provided. Flagman shall control on intersection roads. Flagman and the operator shall be trained before starting the activity & fully aware of the blind spot of the vehicle. No heavy trucks are allowed at least Smeter from the edge of the excavation . All connections shall be inspected prior to start the work activity in daily basis, Full time Stand by person is available during the activity. Use whip lock to reduce accidental uncontrolled releasing of valve or connections. AMC. Increasing pressure with pump. (Mechanical & Manual pressure) a) Exceeding maximum, allowable pressure a) Accidental release of pressure hose b)Unauthorised entry of vehicles/men 3c 4D i. 24hrs prior notification shall be made by responsible engincer to all involved parties & management. All hydro tests shall be done with valid permit, checklists & notifications. Ensure the pressure relieving device is set at ‘maximum allowable pressure for the weakest portion of the segment to be hydro tested. iv. No unauthorised personnel allowed in the testing area v. Ensure delivery hoses is higher than the test pressure. i. Use whip lock to reduce accidental uncontrolled releasing of valve or connections. Competent engineer to inspect & make sure all connections are proper according to the standard prior to start the test. Use standard couplings. Inspect the hose connection by a competent engineer prior to pressurizing. iv, . Only trained crew is allowed to perform hydro test ‘The area must be barricaded at least 5 meters away from the hydro test units & from the blinding flange point. Proper signage indicating “Hydro test ongoing - Keep away” shall be posted to the location iv. Assign the competent person calibrated gauges or pressure relief valve, etc, v. Keep standby person always throughout the test ime, ing lights shall be available if the pressure 2c 2c AMC AMC test continues through night. ©) Vibration of pipe due to 4d) Working in pressurised line ©) Leaks 4D i, The system shall be pressurised slowly, The test manifold firmly to avoid vibration during the the pressurized pipe or to be in Thrust block shall be used to support the pipe from being damage. iv. Isolate the area with warning tape & stand by person is, i. Do not try to work on a system while it is under pressure, ii, System shall be depressurised before any work to be done to stop leaks or repair weakness or tightening of bo i, Incase leak noticed immediately report to responsible supervisor or engineer. Do not approach the leak area without assessing the leak, Refer the pressure before doing any repair. iv. Keep leak area barricaded & identification signages should be provided. vy. Emergency contact numbers should be posted in the 2c test area VU Monitoring the test area f) Substandard manifold arrangements b) no stand by man 3D vi. Depressurised the, locate the leaks, if necessary iten the flanges/bolts, leak in the line, complete depressurise & rectify the joint leak. . Make sure calibrated & certified manifold is installed & inspected prior to start i. Only trained people is allowed to perform the task . Area should be barricaded & no unauthorised entry signages is available, iv. Make sure trained stand by person is available at the location continue 24 hours, make sure proper ight arrangements in place. ii. Obtain proper work permit prior to start the work 3A | AMC iv. Obtain AMC extended hours” notification & permit system during extended hours. v. Updated Emergency contact numbers & full time supervision is available at site. vi. Area to be barricaded & unauthorised signages in place, vii. Area should be clear from obstructions. Ln iY Monitoring the test area a) Poori During ni imination T._ Test areas have enough lights, especially both end -if required (working at night) points & joint areas, IL. No heavy equipments allowed at night. IIL. work area to be barricaded to restrict unauthorized entries. 3D | IV. Once pressurised the RTR pipe, no unauthorised [3A | AMC personal allowed inside the restricted area, V. Work supervision in place. Vi. illum not enough, work activity will be suspend immediately. VIL. Proper access & egress in place. TIL. Identify the work areas with blinking lights. IX. Buddy system to be followed, b) Generator/tower i. Make sure equi inspected & updated check light. in place prior to star Area to be barricaded & signages in place. Drip tray or bund wall in place to control spillages. Competent electrician in place during equipment is Supervisor to make sure tower light is switched off & boom down after the work. vii. Make sure equipment grounding to be fixed properly while working. Don’t move any generator or tower light while operating mode. ix. Follow proper lifting procedure/technique to move or shift the equipment. xX. Everyone knows about emergency procedures & emergency contact numbers, Full time Stand by vehicle in place. oon l Proper access & egress in place. Installation of rubber & insulation works Q @d) ° h) Inadequate working space Strain 3D Sharp edges Protruded steel Improper access dust i. Work rot Keep work area free from obstructions & maintain housekeeping. . Use at least two or three-man power for material handling. intervals. Wear cut resistant gloves. (epoxy coted gloves) i. Use proper hack saw blade with frame.do not use without frame, All protruded steel to be capped . Make sure at least 1 meter clear access for the work area. Keep work area free from obstructions & maintain housekeeping, Wear appropriate respiratory protection Always wear ppe, hard hat, gloves, zoogles, safety shoes, disposable coverall, dust mask. Barricade the work area 3A AMC ‘YW ] Housekeeping «) Improper storage of i. Material storage area to be provided with barricade ‘material, and signage. ii, Never over stack the material. 2B 1A. | AM Scattered materials i, materials shall be properly arranged with temporary material storage area signage, ii, Do not store any materials at the edge of the excavation, All site personnel are required to wear PPE/ be specific coveralls, Safety helmet, safety Glasses, Gloves and Safety shoes. Conduct toolbox safety meeting prior to every work activity. Explain to key personnel the purpose of the JSA and enforce the implementation of the content. Use the JSA to identify hazards and list the precautions on the work permit. Garbage’s shall be disposed properly on a daily basis. If an injury or near miss occurs, the JSA shall be reviewed immediately to determine whether changes are needed in the job procedures.

You might also like