This 3 sentence summary provides the key details about a Job Safety Analysis for cable laying at height:
The document outlines 5 job activity steps for cable laying at height, including gathering tools, working at height, unrolling cable drums, opening cable trenches, and cable laying, and identifies hazards such as fall from height, sharp edges, and heavy weight for each step along with required safety control measures. It was prepared by an individual at Jindal Steel & Power Limited's Occupational Health & Safety Department and approved by a manager.
This 3 sentence summary provides the key details about a Job Safety Analysis for cable laying at height:
The document outlines 5 job activity steps for cable laying at height, including gathering tools, working at height, unrolling cable drums, opening cable trenches, and cable laying, and identifies hazards such as fall from height, sharp edges, and heavy weight for each step along with required safety control measures. It was prepared by an individual at Jindal Steel & Power Limited's Occupational Health & Safety Department and approved by a manager.
This 3 sentence summary provides the key details about a Job Safety Analysis for cable laying at height:
The document outlines 5 job activity steps for cable laying at height, including gathering tools, working at height, unrolling cable drums, opening cable trenches, and cable laying, and identifies hazards such as fall from height, sharp edges, and heavy weight for each step along with required safety control measures. It was prepared by an individual at Jindal Steel & Power Limited's Occupational Health & Safety Department and approved by a manager.
Description of Activity: ___________Cable Laying at Height ______________________
S.No. Job Activity Step Hazards/Risk Safety Control Measures
Gather the tools and Injury due to sharp Wear hand gloves. 1 tackles. tools.
Fall from Height,
Damaged or corroded Inspect scaffolding for its Support platform 2 Work at height mechanical integrity, use safety leading to fall from belt, Use life line if required. height.
Control traffic by cordoning off the
Traffic, Sharp Edges of area. 3 Unrolling of Cable drum Metal/Tools Use of mandatory PPEs Hand gloves, Helmet, Safety Goggles etc. Use of PPE Hand Gloves, Helmet, Heavy weight, , Sharp 4 Opening of cable trench Safety goggles. Use tested and Edges of Metal/Tools certified lifting tools and tackles. Sharp Edges of Use of PPE cotton Hand Gloves, 5 Cable Laying Metal/Tools Helmet, Safety goggles.