Step 1 : Job Safety hazard & PPE checklist:(Checklist serves as a guide to identify general hazards associated with the job)
Permits : Welding/ heating : Human performance : Emergency info/ equipment
PTW (PTW No) Flashback arrestors for acetylene Confusion/ mix-up potential location :
ROMP & Oxygen cylinder (labelling, look-alike Fire extinguisher location
LWC Fire proof blanket to contain equipments etc. Safety shower /eye washer
Confined Space spark First time evolution Evacuation routes/ assembly
Hot Work Earthing of welding transformer Distraction area
Working at Height Welding machine lugs and cables Lack of experience MSDS review
Access permit Portable fire extinguisher Fatigue due to spread over Emergency phone nos./
Others ______________ Others ________________ the working hours. location of phone
Nearby work activities Walkie-talkie required
Time pressure Others __________
PPEs : Hazardous energy control : Tools : General :
Normal PPEs Electrical isolation Daily inspection of tools Flammables (Gas/Liquid )
- Safety helmet LO/TO device in place Right tools Flying particles ( Dust, Splinters
- Safety shoos Energy isolation verified Grinder wheel guard in )
Full body safety Harness Hydraulic place Rotating equipment (No loose
Welding Gloves (Type) Pneumatic Grinder side handle in place clothing )
Respirator (Type) ____ Mechanical Grinder wheel speed Cut in between / pinch points
Hearing protection Thermal compatible Hot surfaces
(earplugs/ Muffs) Stored energy Ext- Code inspection Heat stress
Welding screen Others _Clearing of chute to RCCB ( 30 MA ) in Barricades/warning signs
Safety goggles avoid back fire during cutting distribution board Covering of openings
Others ________ Environment ( Wet humid Sleeve/ Trip hazards
condition )
Fall protection : Crane/ Lifting equipment : Scaffolding/ ladders :
Full Body harness Hydra crane Inspected/ tagged by
inspection Critical lift plan competent person
Proper anchorage point Signals/ communications Work platforms
Lifeline (horizontal/ Arial/ scissors lifts Handrails, Toe guards
vertical ) Manual lifting equipments Special provision ( life
Safety net Chain pulley block safety net, earthing of
Rope grab fall arrestor Slings/ D-shackles inspection metal scaffold etc. )
Others ___________ Proper rigging practices Access routine
Overhead power lines Others ___________
- Voltage _______
- Safe working distance ___ ft
Others
2. loading and Transporting of plate from steel Fall of material (plate etc) Proper positioning and tying of plate on trolley.
yard to crusher house ground floor by trolley Trapping of hands and getting crushed Use proper PPEs
Road accident Road training/supervision
3. Lifting of plate from ground floor to crusher Fall of plate while lifting and Fall from height 1. Cardon off the work area and remove person
floor and shifting the same to the work location (for the person at crusher floor to handle the out of that area.
plate) 2. Check validity of load test certificate of hoist
Trapping of hands and getting crushed and other lifting devices, slings etc.(load
Hitting of plate due to swing carrying rating of sling)
3.Ensure Lifting arrangements through
experienced person(rigger)
4. Person available at crusher floor has to wear
proper PPEs and he must anchor his safety belt
while handling the plate.
5.control the swing of the plate using a rope
3. Preparing scaffold / plate-form at work 1.Fall from scaffold 1. Cordon off the working area.
location 2.Fall of material 2. Scaffold of 2 meter or more than 2 meter
height are to checked and tagged by Certified
person. Display max number of persons
allowed on scaffold platform.
3. Scaffold to be erected by an experienced
person. Proper railing and toe guard on the
scaffold working platform.
4. Ensure Person working on scaffold is wearing
all PPEs and anchored his safety belt.
6. No unwanted material at scaffold platform.
7.personal supervision if recommended by SAP
8.seperate PTW for erection of scaffolding
9.certificate for integrity by CFT
4. Cutting of the worn out plate 1. Back fire due to sudden ignition of 1. Ensure the related chute is clean
accumulated coal in chute. 2. While cutting, ensure proper anchoring of
2. Fall of worn out plate after cutting the plate so that it does not swing / fall and hit
3. Fire hazard due falling spatters the person working on it.
3. (A) Keep a running fire water connection
necessary water arrangements to avoid related
conveyor belt fire due to spatters.
3. (B) Cover opening around the chute by
aluminium sheet to prevent falling of spatter at
lower floors. (ASBESTOS IS BANNED)
3.(c) Under Hot PTW, Ensure presence of CISF
with proper fire fighting arrangements
5. Lifting and fitment of new plate Fall of material (plate) 1. Check load test date of lifting equipment e.g.
trapping of hands/fingers injury Chain pulley blocks, Winch etc. Use ONLY LOAD
TESTED equipment.
2. Number of persons at plat-form MUST not be
more than allowed.
3.Use hand gloves
6. Welding of new plate 1.Electrocution 1. (A) Ensure proper connection (Through
2.Fall of material (plate) socket), earthing of welding machine,
Installation of RCCB.
2.use only a tested and certified welding
machine
3. (B) Welding cable has to be without joint and
all connections are to be through lugs.
2. Same as activity-5
7. General Trip due to stray cables, gas pipes Keep the walking area clear from cables, gas
pipes, T&P etc.
8. Removal of scaffold and area cleaning after Fall of material 1. Proper precaution is to be taken while
welding removing the scaffold.
2. To avoid injury due to fall of material, all
scrap etc must be removed after completion of
job.