Professional Documents
Culture Documents
Approved by:
Mr Sei Gim Hong 09.Dec.2006 As when needed
(Name, designation)
Director Last Review Date: Next Review Date:
(Date)
Falling from Sever injuries Use proper 2 2 M Provide access ladder Fitter, Worker
height platform/scaffolding & to the work location Welder
proper access Tag the scaffold after
Wear safety harness and checks
100% tie off
RISK ASSESSMENT FORM
Company: Ben Ching Engineering Pte Ltd
Location: Pulau sebarok
Installation and Fabrication of Conducted by:
Activity: Prepared by: K. Raji Reddy
Steel Structural Work (Names, designations)
Approved by:
Mr Sei Gim Hong 09.Dec.2006 As when needed
(Name, designation)
Director Last Review Date: Next Review Date:
(Date)
Falling of tools, Injuries of Barricade the area with 2 2 M No loose tools and Fitter, Worker
spanners, workers below Proper signage. electrical wires hanging Welder
hammers etc Keep tools in Tool bag. on scaffold
Always wear PPE – Working platform with -
helmet, safety shoes toe-board and guard
rails
3 Welding Fire and Sever injuries Fire extinguisher + 3 1 M Hot work permit Fitter, Worker
Explosion watchman Tool box meeting Welder
Use Fire retardant
cloth to contain the falling
sparks
Barricade the area.
Welder must wear the
welding mask when
welding
RISK ASSESSMENT FORM
Company: Ben Ching Engineering Pte Ltd
Location: Pulau sebarok
Installation and Fabrication of Conducted by:
Activity: Prepared by: K. Raji Reddy
Steel Structural Work (Names, designations)
Approved by:
Mr Sei Gim Hong 09.Dec.2006 As when needed
(Name, designation)
Director Last Review Date: Next Review Date:
(Date)